X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786011816022

Well Details

Well ID: 0786011816022
Loading map...
Location: 02/16-18-078-01W6/2
Location Alias: 02/16-18-78-01 W6M
Location Alias 2: 02/16-18-078-01 W6/02
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 01
Section: 18
County/Municipality: Birch Hills County
Well Name: CNRL BELLOY 16-18-78-1
Operator Name: Canadian Natural Resources Limited
License Number: 0155223
License Date: 1992-12-18
License Status: Issued
Spud Date: 1993-01-01
Final Drill Date: 1993-01-08
Well Total Depth: 1646.00 m
Surface Hole Latitude: 55.764645
Surface Hole Longitude: -118.133462

For data sources see[1][2]

Well History

Date Event
1992-12-18 Obtained License
1993-01-02 Surface Casing Operation Performed
1993-01-08 Finished Drilling
1993-01-08 Well Log Performed
1993-01-08 Well Mode changed to Drilled and Cased
1993-01-09 Well Log Performed
1993-01-10 Drill Stem Test Performed
1993-01-11 Drill Stem Test Performed
1993-01-13 Drill Stem Test Performed
1993-01-14 Drill Stem Test Performed
1993-01-15 Perforation Treatment Performed - Jet Perforation
1993-01-16 Production Casing Operation Performed
1993-01-16 Rig Released
1993-02-14 Well Log Performed
1993-02-15 Well Log Performed
1993-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-21 Perforation Treatment Performed - Jet Perforation
1993-02-21 Well Log Performed
1993-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-26 Well Began Production
1993-04-26 Well Fluid changed to Gas
1993-04-26 Well Mode changed to Flowing
1993-05-15 Well Log Performed
1993-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-05-16 Perforation Treatment Performed - Jet Perforation
1993-05-16 Plug Back Performed
1993-05-17 Perforation Treatment Performed - Fractured
1993-05-19 Well Log Performed
1993-05-25 Perforation Treatment Performed - Fractured
1993-05-27 Well Log Performed
1993-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-13 Perforation Treatment Performed - Jet Perforation
1993-11-13 Well Log Performed
1993-11-14 Perforation Treatment Performed - Fractured
1993-11-20 Well Log Performed
1993-11-21 Perforation Treatment Performed - Jet Perforation
1993-11-23 Perforation Treatment Performed - Fractured
1993-11-27 Well Log Performed
1994-08-06 Well Log Performed
1994-08-07 Well Log Performed
1994-08-09 Well Log Performed
1994-09-09 Well Log Performed
1994-10-20 Well Fluid changed to Gas
1994-10-20 Well Mode changed to Flowing
1998-06-16 Well Structure changed to Commingled
1998-06-17 Well Fluid changed to Gas
1998-06-17 Well Mode changed to Flowing
2000-12-15 Well Log Performed
2000-12-16 Perforation Treatment Performed - Jet Perforation
2000-12-20 Perforation Treatment Performed - Fractured
2001-01-07 Well Log Performed
2001-01-10 Perforation Treatment Performed - Fractured
2008-03-10 Well Fluid changed to Gas
2008-03-10 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-01-15 Perforation 1613.00 1615.00 13
1993-11-12 Packing Device Capped w/Cement 1530.00 1538.00 0
1993-11-13 Perforation 1511.50 1515.00 13
1993-11-14 Fracture 1511.50 1515.00 0
1993-11-21 Perforation 1445.00 1449.50 13
1993-11-23 Fracture 1445.00 1449.50 0
2000-12-16 Perforation 1411.00 1413.00 20
2000-12-16 Perforation 1351.00 1353.00 20
2000-12-20 Fracture 1411.00 1413.00 0
2001-01-10 Fracture 1351.00 1353.00 0
1993-02-17 Acid Treatment 1613.00 1615.00 0
1993-02-19 Acid Treatment 1613.00 1615.00 0
1993-02-21 Perforation 1541.00 1545.00 14
1993-02-22 Acid Treatment 1541.00 1545.00 0
1993-05-16 Packing Device Capped w/Cement 1599.00 1607.00 0
1993-05-16 Perforation 1569.00 1574.00 13
1993-05-17 Fracture 1569.00 1574.00 0
1993-05-25 Fracture 1569.00 1574.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5029 0.0 0.0 0.0
1994 7955 0.0 0.0 0.0
1995 8645 0.0 0.0 0.0
1996 8690 0.0 0.0 0.0
1997 8750 0.0 0.0 0.0
1998 8358 0.0 0.0 0.0
1999 8148 0.0 0.0 0.0
2000 8131 0.0 0.0 0.0

For data sources see[5]

References