X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786011710003

Well Details

Well ID: 0786011710003
Loading map...
Location: 00/10-17-078-01W6/3
Location Alias: 00/10-17-78-01 W6M
Location Alias 2: 00/10-17-078-01 W6/03
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 01
Section: 17
County/Municipality: Birch Hills County
Well Name: CNRL ET AL BELLOY 10-17-78-1
Operator Name: Canadian Natural Resources Limited
License Number: 0053101
License Date: 1975-02-28
License Status: Issued
Spud Date: 1975-05-23
Final Drill Date: 1975-06-12
Well Total Depth: 1569.70 m
Surface Hole Latitude: 55.762988
Surface Hole Longitude: -118.116087

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-02-28 Obtained License
1975-05-31 Drill Stem Test Performed
1975-06-12 Finished Drilling
1975-06-12 Well Log Performed
1975-06-12 Well Mode changed to Drilled and Cased
1975-06-13 Blow Occurred
1975-06-19 Production Casing Operation Performed
1975-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-07-25 Perforation Treatment Performed - Jet Perforation
1975-07-28 Perforation Treatment Performed - Fractured
1975-07-30 Perforation Treatment Performed - Jet Perforation
1988-03-25 Perforation Treatment Performed - Cement Squeeze
1988-03-25 Plug Back Performed
1988-03-26 Perforation Treatment Performed - Cement Squeeze
1988-03-26 Plug Back Performed
1988-03-31 Perforation Treatment Performed - Jet Perforation
1988-04-01 Perforation Treatment Performed - Fractured
1988-04-02 Well Log Performed
1988-04-10 Well Began Production
1988-04-10 Well Fluid changed to Gas
1988-04-10 Well Mode changed to Flowing
1989-09-08 Well Log Performed
1989-09-12 Well Log Performed
1991-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-11 Perforation Treatment Performed - Jet Perforation
1992-06-11 Well Log Performed
1992-06-13 Perforation Treatment Performed - Jet Perforation
1992-06-14 Perforation Treatment Performed - Fractured
1992-06-15 Well Log Performed
2000-08-23 Well Log Performed
2000-08-24 Well Log Performed
2000-08-30 Well Log Performed
2000-08-31 Perforation Treatment Performed - Jet Perforation
2000-09-08 Perforation Treatment Performed - Fractured
2000-09-09 Perforation Treatment Performed - Fractured
2000-09-09 Well Log Performed
2000-09-10 Well Log Performed
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Pumping
2005-05-19 Perforation Treatment Performed - Jet Perforation
2005-05-19 Well Log Performed
2005-05-21 Perforation Treatment Performed - Fractured
2005-05-21 Well Log Performed
2005-05-22 Well Log Performed
2005-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-05-28 Well Log Performed
2016-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-07-25 Perforation 1427.10 1429.50 3
1991-10-08 Acid Treatment 1469.10 1475.20 0
1992-06-11 Perforation 1469.10 1471.00 13
1992-06-13 Perforation 1454.50 1458.20 13
1992-06-14 Fracture 1454.50 1458.20 0
2000-08-31 Perforation 1427.10 1429.50 17
2000-08-31 Perforation 1442.90 1444.40 17
2000-09-08 Fracture 1442.90 1444.40 0
2000-09-09 Fracture 1427.10 1429.50 0
2005-05-19 Perforation 1453.00 1458.50 13
2005-05-19 Perforation 1466.50 1468.50 13
1975-07-25 Acid Treatment 1427.10 1429.50 0
2005-05-19 Perforation 1470.50 1472.50 13
2005-05-19 Perforation 1474.00 1477.00 13
2005-05-19 Perforation 1484.50 1487.00 13
2005-05-21 Fracture 1427.10 1487.00 0
2005-05-23 Acid Treatment 1427.10 1487.00 0
2016-03-30 Acid Treatment 1427.10 1487.00 0
1975-07-28 Fracture 1427.10 1429.50 0
1975-07-30 Perforation 570.00 571.80 3
1988-03-25 Cement Squeeze 1427.10 1429.50 0
1988-03-26 Cement Squeeze 570.00 571.80 0
1988-03-31 Perforation 1469.10 1471.00 13
1988-03-31 Perforation 1472.80 1475.20 13
1988-04-01 Fracture 1469.10 1475.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 6357 0.0 0.0 0.0
1989 6995 0.0 0.0 0.0
1990 8607 0.0 0.0 0.0
1991 8126 0.0 0.0 0.0
1992 7734 0.0 0.0 0.0
1993 8500 0.0 0.0 0.0
1994 8530 0.0 0.0 0.0
1995 8670 0.0 0.0 0.0
1996 8716 0.0 0.0 0.0
1997 8656 0.0 0.0 0.0
1998 8584 0.0 0.0 0.0
1999 8111 0.0 0.0 0.0
2000 2723 0.0 0.0 0.0
2001 8592 0.0 0.0 0.0
2002 8677 0.0 0.0 0.0
2003 8718 0.0 0.0 0.0
2004 8694 0.0 0.0 0.0
2005 8375 0.0 0.0 0.0
2006 8711 0.0 0.0 0.0
2007 8567 0.0 0.0 0.0
2008 8576 0.0 0.0 0.0
2009 8755 0.0 0.0 0.0
2010 8665 0.0 0.0 0.0
2011 8736 0.0 0.0 0.0
2012 8711 0.0 0.0 0.0
2013 8692 0.0 0.0 0.0
2014 5345 0.0 0.0 0.0
2015 902 0.0 0.0 0.0
2016 8548 0.0 0.0 0.0
2017 8757 0.0 0.0 0.0
2018 8610 0.0 0.0 0.0
2019 1910 0.0 0.0 0.0
2020 480 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1975-06-13 Blow 1569.60 1569.60
2016-03-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References