X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786011604000

Well Details

Well ID: 0786011604000
Loading map...
Location: 00/04-16-078-01W6/0
Location Alias: 00/04-16-78-01 W6M
Location Alias 2: 00/04-16-078-01 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 01
Section: 16
County/Municipality: Birch Hills County
Well Name: CDNOXY ET AL BELLOY 4-16-78-1
Operator Name: CNOOC Petroleum North America ULC
License Number: 0133752
License Date: 1988-05-06
License Status: RecCertified
Spud Date: 1988-05-11
Final Drill Date: 1988-05-28
Well Total Depth: 2224.00 m
Surface Hole Latitude: 55.753017
Surface Hole Longitude: -118.100486

For data sources see[1][2]

Well History

Date Event
1988-05-06 Obtained License
1988-05-12 Surface Casing Operation Performed
1988-05-28 Finished Drilling
1988-05-28 Well Log Performed
1988-05-30 Drill Stem Test Performed
1988-05-31 Drill Stem Test Performed
1988-06-01 Production Casing Operation Performed
1988-06-02 Rig Released
1988-06-02 Well Mode changed to Drilled and Cased
1988-06-03 Well Log Performed
1988-06-28 Perforation Treatment Performed - Jet Perforation
1988-06-28 Well Log Performed
1988-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-26 Well Began Production
1988-07-26 Well Fluid changed to Crude Oil
1988-07-26 Well Mode changed to Flowing
1989-03-11 Well Log Performed
1989-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-12 Perforation Treatment Performed - Jet Perforation
1989-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-03 Well Log Performed
1990-03-04 Perforation Treatment Performed - Jet Perforation
1990-03-04 Well Log Performed
1990-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-06 Perforation Treatment Performed - Remedial Casing
1990-03-07 Perforation Treatment Performed - Jet Perforation
1990-03-07 Well Log Performed
1990-03-08 Perforation Treatment Performed - Remedial Casing
1990-03-15 Well Log Performed
1990-03-17 Perforation Treatment Performed - Casing Patch (Over Perfs)
1990-03-17 Well Log Performed
1990-12-01 Well Fluid changed to Crude Oil
1990-12-01 Well Mode changed to Suspended
1994-11-06 Perforation Treatment Performed - Cement Plug
1994-11-06 Plug Back Performed
1994-11-06 Well Fluid changed to Crude Oil
1994-11-06 Well Mode changed to Abandoned
1994-11-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-06-28 Perforation 2122.50 2126.50 13
1990-03-08 Remedial Casing Cementing 949.00 950.00 0
1990-03-17 Casing Patch 1010.00 1011.00 0
1994-11-06 Cement Plug 1816.00 2099.00 0
1988-06-29 Acid Treatment 2122.50 2126.50 0
1989-03-12 Packing Device Capped w/Cement 2113.00 2121.00 0
1989-03-12 Perforation 2094.00 2101.00 13
1989-03-13 Acid Treatment 2094.00 2101.00 0
1990-03-04 Perforation 1010.00 1011.00 13
1990-03-05 Acid Treatment 1010.00 1011.00 0
1990-03-06 Remedial Casing Cementing 1010.00 1011.00 0
1990-03-07 Perforation 949.00 950.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 3741 0.0 0.0 0.0
1989 7152 0.0 0.0 0.0
1990 6104 0.0 0.0 0.0

For data sources see[5]

References