X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786011412002

Well Details

Well ID: 0786011412002
Loading map...
Location: 00/12-14-078-01W6/2
Location Alias: 00/12-14-78-01 W6M
Location Alias 2: 00/12-14-078-01 W6/02
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 01
Section: 14
County/Municipality: Birch Hills County
Well Name: CNRL ET AL BELLOY 12-14-78-1
Operator Name: Canadian Natural Resources Limited
License Number: 0005132
License Date: 1952-08-14
License Status: Abandoned
Spud Date: 1952-08-19
Final Drill Date: 1952-10-22
Well Total Depth: 1617.00 m
Surface Hole Latitude: 55.761480
Surface Hole Longitude: -118.048565

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-08-14 Obtained License
1952-08-27 Drill Stem Test Performed
1952-08-28 Drill Stem Test Performed
1952-08-30 Drill Stem Test Performed
1952-09-01 Drill Stem Test Performed
1952-09-01 Production Casing Operation Performed
1952-09-02 Drill Stem Test Performed
1952-09-05 Drill Stem Test Performed
1952-09-06 Drill Stem Test Performed
1952-09-07 Drill Stem Test Performed
1952-09-08 Drill Stem Test Performed
1952-09-09 Drill Stem Test Performed
1952-09-15 Drill Stem Test Performed
1952-09-20 Drill Stem Test Performed
1952-09-22 Drill Stem Test Performed
1952-09-24 Drill Stem Test Performed
1952-09-25 Drill Stem Test Performed
1952-10-02 Drill Stem Test Performed
1952-10-15 Drill Stem Test Performed
1952-10-17 Drill Stem Test Performed
1952-10-20 Drill Stem Test Performed
1952-10-22 Drill Stem Test Performed
1952-10-22 Finished Drilling
1952-10-28 Perforation Treatment Performed - Jet Perforation
1952-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1952-11-01 Perforation Treatment Performed - Jet Perforation
1952-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1952-11-04 Perforation Treatment Performed - Jet Perforation
1952-11-06 Perforation Treatment Performed - Jet Perforation
1952-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1952-11-09 Perforation Treatment Performed - Jet Perforation
1952-11-11 Drill Stem Test Performed
1972-12-09 Perforation Treatment Performed - Acid Wash - No Pressure
1972-12-09 Perforation Treatment Performed - Cement Squeeze
1972-12-13 Perforation Treatment Performed - Jet Perforation
1972-12-19 Well Mode changed to Drilled and Cased
1976-07-01 Well Mode changed to Drilled and Cased
1978-08-09 Well Began Production
1978-08-09 Well Fluid changed to Gas
1978-08-09 Well Mode changed to Flowing
1981-08-12 Well Fluid changed to Gas
1981-08-12 Well Mode changed to Suspended
2000-06-27 Well Log Performed
2000-06-29 Perforation Treatment Performed - Cement Squeeze
2000-06-29 Plug Back Performed
2000-06-29 Well Fluid changed to Gas
2000-06-29 Well Log Performed
2000-06-29 Well Mode changed to Abandoned Zone
2000-06-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-30 Perforation Treatment Performed - Jet Perforation
2000-06-30 Plug Back Performed
2000-07-01 Perforation Treatment Performed - Cement Plug
2000-07-01 Perforation Treatment Performed - Remedial Casing
2000-07-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-10-28 Perforation 949.10 950.40 13
1972-12-09 Cement Squeeze 910.70 913.20 0
1972-12-13 Perforation 949.10 950.40 13
1972-12-13 Perforation 935.10 936.30 13
1972-12-13 Perforation 927.20 929.90 13
2000-06-29 Cement Squeeze 927.20 936.30 0
2000-06-30 Perforation 345.00 346.00 13
2000-06-30 Packing Device Capped w/Cement 894.00 943.00 0
2000-07-01 Remedial Casing Cementing 345.00 346.00 0
2000-07-01 Cement Plug 291.00 363.00 0
1952-11-01 Packing Device Capped w/Cement 943.70 943.70 0
1952-11-01 Perforation 935.10 936.30 13
1952-11-04 Packing Device Capped w/Cement 933.30 933.30 0
1952-11-04 Perforation 928.40 929.90 13
1952-11-06 Perforation 927.20 928.40 13
1952-11-09 Packing Device Capped w/Cement 920.80 920.80 0
1952-11-09 Perforation 910.70 913.20 13
1972-12-09 Acid Wash 910.70 913.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 3062 0.0 0.0 0.0
1979 5035 0.0 0.0 0.0
1980 3876 0.0 0.0 0.0
1981 2206 0.0 0.0 0.0

For data sources see[5]

References