X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786010907003

Well Details

Well ID: 0786010907003
Loading map...
Location: 00/07-09-078-01W6/3
Location Alias: 00/07-09-78-01 W6M
Location Alias 2: 00/07-09-078-01 W6/03
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 01
Section: 09
County/Municipality: Birch Hills County
Well Name: CNRL ET AL BELLOY 7-9-78-1
Operator Name: Canadian Natural Resources Limited
License Number: 0038716
License Date: 1970-09-03
License Status: Abandoned
Spud Date: 1970-10-11
Final Drill Date: 1970-10-16
Well Total Depth: 1029.30 m
Surface Hole Latitude: 55.742330
Surface Hole Longitude: -118.086096

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-09-03 Obtained License
1970-10-15 Drill Stem Test Performed
1970-10-16 Finished Drilling
1970-10-16 Well Mode changed to Drilled and Cased
1970-10-17 Drill Stem Test Performed
1970-10-18 Production Casing Operation Performed
1971-09-06 Perforation Treatment Performed - Jet Perforation
1971-09-07 Perforation Treatment Performed - Jet Perforation
1971-09-09 Perforation Treatment Performed - Jet Perforation
1971-09-10 Perforation Treatment Performed - Jet Perforation
1971-09-11 Perforation Treatment Performed - Cement Squeeze
1971-09-12 Perforation Treatment Performed - Cement Squeeze
1973-07-04 Perforation Treatment Performed - Cement Plug
1973-07-05 Perforation Treatment Performed - Jet Perforation
1973-07-06 Perforation Treatment Performed - Jet Perforation
1973-07-14 Well Began Production
1973-07-14 Well Fluid changed to Gas
1973-07-14 Well Mode changed to Flowing
1975-01-11 Well Fluid changed to Gas
1975-01-11 Well Mode changed to Suspended
1975-03-07 Perforation Treatment Performed - Cement Squeeze
1975-03-09 Perforation Treatment Performed - Jet Perforation
1992-06-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-30 Plug Back Performed
1992-06-30 Well Fluid changed to Gas
1992-06-30 Well Log Performed
1992-06-30 Well Mode changed to Abandoned Zone
1992-07-01 Perforation Treatment Performed - Jet Perforation
1998-06-06 Well Log Performed
1998-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-07 Plug Back Performed
1998-06-07 Well Log Performed
1998-06-08 Well Log Performed
1998-06-09 Perforation Treatment Performed - Jet Perforation
1998-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-10 Well Log Performed
1998-06-12 Perforation Treatment Performed - Remedial Casing
1998-06-14 Perforation Treatment Performed - Jet Perforation
1998-06-14 Well Log Performed
1998-06-16 Perforation Treatment Performed - Remedial Casing
1999-05-26 Well Log Performed
1999-05-28 Perforation Treatment Performed - Jet Perforation
1999-05-28 Well Log Performed
1999-05-29 Well Log Performed
1999-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-03 Well Log Performed
1999-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-04 Perforation Treatment Performed - Jet Perforation
1999-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-05 Well Log Performed
1999-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-06 Perforation Treatment Performed - Jet Perforation
1999-06-07 Perforation Treatment Performed - Cement Plug
1999-06-08 Well Log Performed
1999-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-09 Perforation Treatment Performed - Jet Perforation
1999-06-09 Well Log Performed
1999-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-11 Perforation Treatment Performed - Remedial Casing
1999-06-13 Perforation Treatment Performed - Jet Perforation
1999-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-14 Perforation Treatment Performed - Remedial Casing
1999-06-14 Well Log Performed
1999-08-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-09-06 Perforation 990.60 992.40 13
1975-03-07 Cement Squeeze 826.00 827.50 0
1975-03-09 Perforation 612.00 613.30 3
1992-06-30 Packing Device Capped w/Cement 935.00 943.00 0
1992-07-01 Perforation 806.20 809.20 13
1998-06-07 Packing Device Capped w/Cement 784.00 792.00 0
1998-06-07 Packing Device Capped w/Cement 594.00 602.00 0
1998-06-09 Perforation 418.50 419.50 14
1998-06-10 Acid Treatment 418.50 419.50 0
1998-06-12 Remedial Casing Cementing 418.50 419.50 0
1998-06-14 Perforation 379.00 380.00 14
1971-09-07 Perforation 827.50 829.10 13
1998-06-16 Remedial Casing Cementing 379.00 380.00 0
1999-05-28 Perforation 806.20 809.20 13
1999-05-28 Perforation 612.00 613.30 3
1999-06-01 Acid Treatment 806.20 809.20 0
1999-06-02 Packing Device Capped w/Cement 796.00 804.00 0
1999-06-03 Acid Treatment 612.00 613.30 0
1999-06-04 Packing Device Capped w/Cement 592.00 600.00 0
1999-06-04 Perforation 529.00 530.00 14
1999-06-04 Perforation 556.00 557.00 14
1999-06-05 Acid Treatment 529.00 557.00 0
1971-09-09 Perforation 806.50 808.30 13
1999-06-06 Acid Treatment 529.00 557.00 0
1999-06-06 Perforation 534.00 535.00 14
1999-06-07 Cement Plug 478.00 565.70 0
1999-06-09 Perforation 453.50 454.50 14
1999-06-09 Perforation 462.50 463.50 14
1999-06-09 Acid Treatment 453.50 463.50 0
1999-06-11 Remedial Casing Cementing 453.50 463.50 0
1999-06-11 Packing Device Capped w/Cement 320.60 458.00 0
1999-06-13 Perforation 230.00 231.00 14
1999-06-14 Acid Treatment 230.00 231.00 0
1971-09-10 Perforation 752.90 754.10 13
1999-06-14 Remedial Casing Cementing 230.00 231.00 0
1999-06-14 Packing Device Capped w/Cement 218.00 227.00 0
1971-09-11 Cement Squeeze 806.50 808.30 0
1971-09-12 Cement Squeeze 752.90 754.10 0
1973-07-04 Cement Plug 973.50 981.50 0
1973-07-05 Perforation 950.70 951.90 7
1973-07-06 Perforation 953.40 954.90 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 1050 0.0 0.0 0.0
1974 6945 0.0 0.0 0.0
1975 242 0.0 0.0 0.0
1976 700 0.0 0.0 0.0
1977 1452 0.0 0.0 0.0

For data sources see[5]

References