If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0785261308004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.756869,"lon":-117.87953,"icon":""}]} |
Location: 00/08-13-078-26W5/4 | |
Location Alias: 00/08-13-78-26 W5M | |
Location Alias 2: 00/08-13-078-26 W5/04 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 5 | |
Range: 26 | |
Section: 13 | |
County/Municipality: Birch Hills County | |
Well Name: GALLEON BELLOY 8-13-78-26 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0140594 | |
License Date: 1989-08-08 | |
License Status: Abandoned | |
Spud Date: 1989-09-27 | |
Final Drill Date: 1997-08-10 | |
Well Total Depth: 2215.00 m | |
Surface Hole Latitude: 55.756869 | |
Surface Hole Longitude: -117.879530 |
Date | Event |
---|---|
1989-08-08 | Obtained License |
1997-08-06 | Direction Drilling Operation Performed - Horizontal |
1997-08-10 | Finished Drilling |
1997-08-10 | Well Mode changed to Drilled and Cased |
1997-08-11 | Liner Casing Operation Performed |
1997-08-11 | Perforation Treatment Performed - Open-Hole Completion |
1997-08-11 | Perforation Treatment Performed - Slotted Liner or Casing |
1997-08-12 | Rig Released |
1997-08-19 | Well Log Performed |
1997-09-23 | Well Began Production |
1997-09-23 | Well Fluid changed to Crude Oil |
1997-09-23 | Well Mode changed to Pumping |
1997-10-31 | Well Fluid changed to Crude Oil |
1997-10-31 | Well Mode changed to Suspended |
1998-12-17 | Well Fluid changed to Crude Oil |
1998-12-17 | Well Mode changed to Pumping |
1999-11-30 | Well Fluid changed to Crude Oil |
1999-11-30 | Well Mode changed to Suspended |
2004-11-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-11-09 | Perforation Treatment Performed - Cement Plug |
2004-11-09 | Plug Back Performed |
2004-11-10 | Perforation Treatment Performed - Cement Plug |
2004-11-10 | Plug Back Performed |
2004-11-18 | Well Abandoned |
2004-11-18 | Well Fluid changed to Crude Oil |
2004-11-18 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1997-08-06 | 1942.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-08-11 | Slotted Liner | 1947.50 | 2083.00 | 0 |
1997-08-11 | Open Hole/Barefoot Completion | 2083.00 | 2215.00 | 0 |
2004-11-09 | Cement Plug | 1920.50 | 2215.00 | 0 |
2004-11-09 | Packing Device Capped w/Cement | 1888.10 | 1920.00 | 0 |
2004-11-10 | Cement Plug | 830.00 | 965.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 984 | 0.0 | 0.0 | 0.0 |
1998 | 432 | 0.0 | 0.0 | 0.0 |
1999 | 6288 | 0.0 | 0.0 | 0.0 |
For data sources see[6]