X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0785252211000

Well Details

Well ID: 0785252211000
Loading map...
Location: 00/11-22-078-25W5/0
Location Alias: 00/11-22-78-25 W5M
Location Alias 2: 00/11-22-078-25 W5/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 5
Range: 25
Section: 22
County/Municipality: Birch Hills County
Well Name: ANDERSON EAGLEN 11-22-78-25
Operator Name: Devon Canada Corporation
License Number: 0141040
License Date: 1989-09-25
License Status: RecCertified
Spud Date: 1989-09-27
Final Drill Date: 1989-10-08
Well Total Depth: 2074.00 m
Surface Hole Latitude: 55.777296
Surface Hole Longitude: -117.793900

For data sources see[1][2]

Well History

Date Event
1989-09-25 Obtained License
1989-09-28 Surface Casing Operation Performed
1989-09-29 Lost Circulation Occurred
1989-10-03 Well Log Performed
1989-10-08 Finished Drilling
1989-10-08 Well Log Performed
1989-10-09 Drill Stem Test Performed
1989-10-09 Well Log Performed
1989-10-10 Drill Stem Test Performed
1989-10-14 Production Casing Operation Performed
1989-10-14 Rig Released
1989-10-14 Well Mode changed to Drilled and Cased
1989-10-21 Perforation Treatment Performed - Jet Perforation
1989-10-21 Well Log Performed
1989-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-23 Well Began Production
1989-10-23 Well Fluid changed to Crude Oil
1989-10-23 Well Mode changed to Flowing
1990-07-22 Well Fluid changed to Crude Oil
1990-07-22 Well Mode changed to Pumping
1991-06-29 Perforation Treatment Performed - Jet Perforation
1991-06-29 Well Log Performed
1991-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-26 Well Log Performed
1991-07-31 Perforation Treatment Performed - Cement Squeeze
1992-05-01 Well Fluid changed to Crude Oil
1992-05-01 Well Mode changed to Suspended
1997-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-13 Plug Back Performed
1997-09-13 Well Log Performed
1997-10-03 Well Log Performed
1997-10-04 Perforation Treatment Performed - Jet Perforation
1997-10-04 Well Log Performed
1997-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-06 Perforation Treatment Performed - Remedial Casing
1997-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-07 Perforation Treatment Performed - Jet Perforation
1997-10-08 Perforation Treatment Performed - Remedial Casing
1997-10-08 Well Log Performed
1997-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-09 Perforation Treatment Performed - Jet Perforation
1997-10-09 Perforation Treatment Performed - Remedial Casing
1997-10-09 Well Log Performed
1997-10-15 Well Abandoned
1997-10-15 Well Fluid changed to Crude Oil
1997-10-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-10-21 Perforation 1950.00 1954.00 13
1997-10-06 Acid Treatment 480.00 482.00 0
1997-10-06 Remedial Casing Cementing 460.00 482.00 0
1997-10-07 Perforation 375.00 377.00 20
1997-10-07 Acid Treatment 375.00 377.00 0
1997-10-08 Remedial Casing Cementing 375.00 377.00 0
1997-10-09 Perforation 361.00 363.00 20
1997-10-09 Acid Treatment 361.00 363.00 0
1997-10-09 Remedial Casing Cementing 361.00 363.00 0
1989-10-21 Perforation 1956.00 1960.00 13
1989-10-22 Acid Treatment 1950.00 1960.00 0
1991-06-29 Perforation 1992.00 1995.00 13
1991-07-01 Acid Treatment 1992.00 1995.00 0
1991-07-31 Cement Squeeze 1950.00 1960.00 0
1997-09-13 Packing Device Capped w/Cement 1936.00 1944.00 0
1997-10-04 Perforation 480.00 482.00 20
1997-10-04 Perforation 460.00 462.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1651 0.0 0.0 0.0
1990 7680 0.0 0.0 0.0
1991 6814 0.0 0.0 0.0
1992 234 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-09-29 Lost Circulation 503.00 1598.00

For data sources see[6]

References