X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0785212511000

Well Details

Well ID: 0785212511000
Loading map...
Location: 00/11-25-078-21W5/0
Location Alias: 00/11-25-78-21 W5M
Location Alias 2: 00/11-25-078-21 W5/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 5
Range: 21
Section: 25
County/Municipality: Municipal District of Smoky River No. 130
Well Name: LONG RUN ROXANA 11-25-78-21
Operator Name: Long Run Exploration Ltd.
License Number: 0086086
License Date: 1980-10-03
License Status: Abandoned
Spud Date: 1980-10-07
Final Drill Date: 1980-10-23
Well Total Depth: 1220.00 m
Surface Hole Latitude: 55.790785
Surface Hole Longitude: -117.124674

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-03 Obtained License
1980-10-10 Kick Occurred
1980-10-11 Drill Stem Test Performed
1980-10-13 Drill Stem Test Performed
1980-10-14 Drill Stem Test Performed
1980-10-16 Drill Stem Test Performed
1980-10-18 Drill Stem Test Performed
1980-10-19 Drill Stem Test Performed
1980-10-23 Finished Drilling
1980-10-23 Well Mode changed to Drilled and Cased
1980-10-25 Well Log Performed
1980-10-26 Production Casing Operation Performed
1980-11-02 Perforation Treatment Performed - Jet Perforation
1980-11-03 Perforation Treatment Performed - Cement Squeeze
1980-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-04 Perforation Treatment Performed - Jet Perforation
1980-11-15 Perforation Treatment Performed - Cement Squeeze
1980-11-17 Perforation Treatment Performed - Jet Perforation
1980-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-19 Well Began Production
1980-12-19 Well Fluid changed to Crude Oil
1980-12-19 Well Mode changed to Pumping
1987-12-12 Well Fluid changed to Crude Oil
1987-12-12 Well Mode changed to Suspended
2007-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-12-08 Plug Back Performed
2007-12-08 Well Fluid changed to Crude Oil
2007-12-08 Well Mode changed to Abandoned Zone
2015-12-20 Perforation Treatment Performed - Cement Plug
2015-12-20 Plug Back Performed
2015-12-21 Well Abandoned
2015-12-21 Well Fluid changed to Crude Oil
2015-12-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-02 Perforation 891.00 897.00 13
1980-11-03 Cement Squeeze 891.00 897.00 0
1980-11-04 Perforation 902.00 906.00 13
1980-11-04 Acid Treatment 902.00 906.00 0
1980-11-15 Cement Squeeze 902.00 906.00 0
1980-11-17 Perforation 902.00 905.00 13
1980-11-20 Acid Treatment 902.00 905.00 0
2007-12-08 Packing Device Capped w/Cement 875.00 887.00 0
2015-12-20 Cement Plug 718.00 875.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 514 0.0 0.0 0.0
1981 6600 0.0 0.0 0.0
1982 4795 0.0 0.0 0.0
1983 3791 0.0 0.0 0.0
1984 3735 0.0 0.0 0.0
1985 6653 0.0 0.0 0.0
1986 6309 0.0 0.0 0.0
1987 2741 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-10-10 Kick 424.00 424.00
2015-12-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References