X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0785212316000

Well Details

Well ID: 0785212316000
Loading map...
Location: 00/16-23-078-21W5/0
Location Alias: 00/16-23-78-21 W5M
Location Alias 2: 00/16-23-078-21 W5/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 5
Range: 21
Section: 23
County/Municipality: Municipal District of Smoky River No. 130
Well Name: LONG RUN HZ ROXANA 16-23-78-21
Operator Name: Long Run Exploration Ltd.
License Number: 0445460
License Date: 2012-04-23
License Status: Amended
Spud Date: 2012-06-11
Final Drill Date: 2012-06-19
Well Total Depth: 2026.00 m
Surface Hole Latitude: 55.768574
Surface Hole Longitude: -117.134211

For data sources see[1][2]

Well History

Date Event
2012-04-23 Obtained License
2012-06-12 Surface Casing Operation Performed
2012-06-13 Direction Drilling Operation Performed - Deviate
2012-06-14 Direction Drilling Operation Performed - Horizontal
2012-06-15 Intermediate Casing Operation Performed
2012-06-16 Well Log Performed
2012-06-19 Finished Drilling
2012-06-19 Well Mode changed to Drilled and Cased
2012-06-21 Well Log Performed
2012-06-22 Liner Casing Operation Performed
2012-06-23 Perforation Treatment Performed - Open-Hole Completion
2012-06-23 Rig Released
2012-06-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-01 Well Began Production
2012-07-01 Well Fluid changed to Crude Oil
2012-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-06-11 Trinidad Drilling Ltd. 24 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-06-13 691.20 Deviate (5 - 79 degrees)
2012-06-14 1006.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-06-23 Open Hole/Barefoot Completion 2020.00 2026.00 0
2012-06-29 Multi-Stage Fracture 1627.60 1627.70 0
2012-06-29 Multi-Stage Fracture 1534.70 1534.80 0
2012-06-29 Multi-Stage Fracture 1493.80 1493.90 0
2012-06-29 Multi-Stage Fracture 1441.40 1441.50 0
2012-06-29 Multi-Stage Fracture 1400.60 1400.70 0
2012-06-29 Multi-Stage Fracture 1360.00 1360.10 0
2012-06-29 Multi-Stage Fracture 1319.20 1319.30 0
2012-06-29 Multi-Stage Fracture 1278.40 1278.50 0
2012-06-29 Multi-Stage Fracture 1225.90 1226.00 0
2012-06-29 Multi-Stage Fracture 1185.00 1185.10 0
2012-06-29 Multi-Stage Fracture 1994.00 1994.10 0
2012-06-29 Multi-Stage Fracture 1144.20 1144.30 0
2012-06-29 Multi-Stage Fracture 1103.60 1103.70 0
2012-06-29 Multi-Stage Fracture 1951.70 1951.80 0
2012-06-29 Multi-Stage Fracture 1909.10 1909.20 0
2012-06-29 Multi-Stage Fracture 1856.20 1856.30 0
2012-06-29 Multi-Stage Fracture 1815.20 1815.30 0
2012-06-29 Multi-Stage Fracture 1774.10 1774.20 0
2012-06-29 Multi-Stage Fracture 1721.40 1721.50 0
2012-06-29 Multi-Stage Fracture 1680.40 1680.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3374 0.0 0.0 0.0
2013 8216 0.0 0.0 0.0
2014 8488 0.0 0.0 0.0
2015 8486 0.0 0.0 0.0
2016 8574 0.0 0.0 0.0
2017 8346 0.0 0.0 0.0
2018 8481 0.0 0.0 0.0
2019 8361 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-22 No Incident Encountered 0.00 0.00
2012-06-30 No Incident Encountered 0.00 0.00

For data sources see[8]

References