X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0785212209000

Well Details

Well ID: 0785212209000
Loading map...
Location: 00/09-22-078-21W5/0
Location Alias: 00/09-22-78-21 W5M
Location Alias 2: 00/09-22-078-21 W5/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 5
Range: 21
Section: 22
County/Municipality: Municipal District of Smoky River No. 130
Well Name: LONG RUN HZ ROXANA 9-22-78-21
Operator Name: Long Run Exploration Ltd.
License Number: 0437487
License Date: 2011-10-06
License Status: Suspension
Spud Date: 2011-10-14
Final Drill Date: 2011-10-21
Well Total Depth: 2167.50 m
Surface Hole Latitude: 55.765621
Surface Hole Longitude: -117.154246

For data sources see[1][2]

Well History

Date Event
2011-10-06 Obtained License
2011-10-16 Direction Drilling Operation Performed - Deviate
2011-10-16 Surface Casing Operation Performed
2011-10-18 Intermediate Casing Operation Performed
2011-10-18 Well Log Performed
2011-10-19 Direction Drilling Operation Performed - Horizontal
2011-10-21 Finished Drilling
2011-10-21 Well Log Performed
2011-10-21 Well Mode changed to Drilled and Cased
2011-10-23 Liner Casing Operation Performed
2011-10-23 Perforation Treatment Performed - Open-Hole Completion
2011-10-23 Rig Released
2011-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-26 Well Began Production
2011-10-26 Well Fluid changed to Crude Oil
2011-10-26 Well Mode changed to Pumping
2018-01-01 Well Fluid changed to Crude Oil
2018-01-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-16 616.00 Deviate (5 - 79 degrees)
2011-10-19 1127.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-23 Open Hole/Barefoot Completion 2159.10 2167.50 0
2011-10-25 Multi-Stage Fracture 1727.90 1728.00 0
2011-10-25 Multi-Stage Fracture 1671.00 1671.10 0
2011-10-25 Multi-Stage Fracture 1628.60 1628.70 0
2011-10-25 Multi-Stage Fracture 1572.70 1572.80 0
2011-10-25 Multi-Stage Fracture 1528.30 1528.40 0
2011-10-25 Multi-Stage Fracture 1472.60 1472.70 0
2011-10-25 Multi-Stage Fracture 1428.20 1428.30 0
2011-10-25 Multi-Stage Fracture 1369.20 1369.30 0
2011-10-25 Multi-Stage Fracture 1322.90 1323.00 0
2011-10-25 Multi-Stage Fracture 1263.70 1263.80 0
2011-10-25 Multi-Stage Fracture 2146.80 2146.90 0
2011-10-25 Multi-Stage Fracture 1217.40 1217.50 0
2011-10-25 Multi-Stage Fracture 1157.70 1157.80 0
2011-10-25 Multi-Stage Fracture 2094.70 2094.80 0
2011-10-25 Multi-Stage Fracture 2042.80 2042.90 0
2011-10-25 Multi-Stage Fracture 1985.20 1985.30 0
2011-10-25 Multi-Stage Fracture 1938.90 1939.00 0
2011-10-25 Multi-Stage Fracture 1879.90 1880.00 0
2011-10-25 Multi-Stage Fracture 1833.60 1833.70 0
2011-10-25 Multi-Stage Fracture 1774.30 1774.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 959 0.0 0.0 0.0
2012 7926 0.0 0.0 0.0
2013 8724 0.0 0.0 0.0
2014 8630 0.0 0.0 0.0
2015 8266 0.0 0.0 0.0
2016 8061 0.0 0.0 0.0

For data sources see[6]

References