If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0785211816000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.751508,"lon":-117.233264,"icon":""}]} |
Location: 00/16-18-078-21W5/0 | |
Location Alias: 00/16-18-78-21 W5M | |
Location Alias 2: 00/16-18-078-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 5 | |
Range: 21 | |
Section: 18 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: LONG RUN HZ ROXANA 16-18-78-21 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0443906 | |
License Date: 2012-02-07 | |
License Status: Amended | |
Spud Date: 2012-03-05 | |
Final Drill Date: 2012-03-14 | |
Well Total Depth: 2508.00 m | |
Surface Hole Latitude: 55.751508 | |
Surface Hole Longitude: -117.233264 |
Date | Event |
---|---|
2012-02-07 | Obtained License |
2012-03-06 | Surface Casing Operation Performed |
2012-03-07 | Direction Drilling Operation Performed - Deviate |
2012-03-09 | Intermediate Casing Operation Performed |
2012-03-11 | Direction Drilling Operation Performed - Horizontal |
2012-03-14 | Finished Drilling |
2012-03-14 | Liner Casing Operation Performed |
2012-03-14 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-14 | Well Log Performed |
2012-03-14 | Well Mode changed to Drilled and Cased |
2012-03-16 | Rig Released |
2012-03-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-27 | Well Began Production |
2012-03-27 | Well Fluid changed to Crude Oil |
2012-03-27 | Well Mode changed to Pumping |
2014-12-08 | Well Began Injection |
2014-12-08 | Well Fluid changed to Water |
2014-12-08 | Well Type changed to Injection |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-03-05 | Ensign Drilling Inc. | 88 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-03-07 | 569.40 | Deviate (5 - 79 degrees) |
2012-03-11 | 1227.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-14 | Open Hole/Barefoot Completion | 2488.50 | 2508.00 | 0 |
2012-03-19 | Multi-Stage Fracture | 1976.40 | 1976.50 | 0 |
2012-03-19 | Multi-Stage Fracture | 1921.80 | 1921.90 | 0 |
2012-03-19 | Multi-Stage Fracture | 1847.10 | 1847.20 | 0 |
2012-03-19 | Multi-Stage Fracture | 1793.60 | 1793.70 | 0 |
2012-03-19 | Multi-Stage Fracture | 1727.60 | 1727.70 | 0 |
2012-03-19 | Multi-Stage Fracture | 1662.50 | 1662.60 | 0 |
2012-03-19 | Multi-Stage Fracture | 1597.40 | 1597.50 | 0 |
2012-03-19 | Multi-Stage Fracture | 1533.20 | 1533.30 | 0 |
2012-03-19 | Multi-Stage Fracture | 1469.20 | 1469.30 | 0 |
2012-03-19 | Multi-Stage Fracture | 1405.20 | 1405.30 | 0 |
2012-03-19 | Multi-Stage Fracture | 2488.40 | 2488.50 | 0 |
2012-03-19 | Multi-Stage Fracture | 1340.70 | 1340.80 | 0 |
2012-03-19 | Multi-Stage Fracture | 1276.10 | 1276.20 | 0 |
2012-03-19 | Multi-Stage Fracture | 2424.10 | 2424.20 | 0 |
2012-03-19 | Multi-Stage Fracture | 2370.40 | 2370.50 | 0 |
2012-03-19 | Multi-Stage Fracture | 2305.30 | 2305.40 | 0 |
2012-03-19 | Multi-Stage Fracture | 2293.10 | 2293.20 | 0 |
2012-03-19 | Multi-Stage Fracture | 2173.90 | 2174.00 | 0 |
2012-03-19 | Multi-Stage Fracture | 2108.30 | 2108.40 | 0 |
2012-03-19 | Multi-Stage Fracture | 2041.90 | 2042.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6461 | 0.0 | 0.0 | 0.0 |
2013 | 8598 | 0.0 | 0.0 | 0.0 |
2014 | 5363 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-08-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]