If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0785211711020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.751329,"lon":-117.23151,"icon":""}]} |
Location: 02/11-17-078-21W5/0 | |
Location Alias: 02/11-17-78-21 W5M | |
Location Alias 2: 02/11-17-078-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 5 | |
Range: 21 | |
Section: 17 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: LONG RUN HZ 102 NVILLE 11-17-78-21 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0449579 | |
License Date: 2012-10-30 | |
License Status: Issued | |
Spud Date: 2012-11-03 | |
Final Drill Date: 2012-11-08 | |
Well Total Depth: 2151.00 m | |
Surface Hole Latitude: 55.751329 | |
Surface Hole Longitude: -117.231510 |
Date | Event |
---|---|
2012-10-30 | Obtained License |
2012-11-03 | Surface Casing Operation Performed |
2012-11-04 | Direction Drilling Operation Performed - Deviate |
2012-11-05 | Direction Drilling Operation Performed - Horizontal |
2012-11-06 | Intermediate Casing Operation Performed |
2012-11-06 | Well Log Performed |
2012-11-08 | Finished Drilling |
2012-11-08 | Well Log Performed |
2012-11-08 | Well Mode changed to Drilled and Cased |
2012-11-09 | Liner Casing Operation Performed |
2012-11-09 | Rig Released |
2012-11-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-16 | Well Began Production |
2012-11-16 | Well Fluid changed to Crude Oil |
2012-11-16 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-11-03 | Trinidad Drilling Ltd. | 21 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-11-04 | 519.90 | Deviate (5 - 79 degrees) |
2012-11-05 | 1088.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-11-13 | Multi-Stage Fracture | 1975.00 | 1975.40 | 0 |
2012-11-13 | Multi-Stage Fracture | 1615.00 | 1615.40 | 0 |
2012-11-14 | Multi-Stage Fracture | 1572.00 | 1572.40 | 0 |
2012-11-14 | Multi-Stage Fracture | 1535.00 | 1535.40 | 0 |
2012-11-14 | Multi-Stage Fracture | 1495.00 | 1495.40 | 0 |
2012-11-14 | Multi-Stage Fracture | 1455.00 | 1455.40 | 0 |
2012-11-14 | Multi-Stage Fracture | 1415.00 | 1415.40 | 0 |
2012-11-14 | Multi-Stage Fracture | 1375.00 | 1375.40 | 0 |
2012-11-14 | Multi-Stage Fracture | 1335.00 | 1335.40 | 0 |
2012-11-14 | Multi-Stage Fracture | 1295.00 | 1295.40 | 0 |
2012-11-14 | Multi-Stage Fracture | 1255.00 | 1255.40 | 0 |
2012-11-13 | Multi-Stage Fracture | 1933.00 | 1933.40 | 0 |
2012-11-14 | Multi-Stage Fracture | 1225.00 | 1225.40 | 0 |
2012-11-14 | Multi-Stage Fracture | 1195.00 | 1195.40 | 0 |
2012-11-14 | Multi-Stage Fracture | 1165.00 | 1165.40 | 0 |
2012-11-13 | Multi-Stage Fracture | 1895.00 | 1895.40 | 0 |
2012-11-13 | Multi-Stage Fracture | 1855.00 | 1855.40 | 0 |
2012-11-13 | Multi-Stage Fracture | 1815.00 | 1815.40 | 0 |
2012-11-13 | Multi-Stage Fracture | 1775.00 | 1775.40 | 0 |
2012-11-13 | Multi-Stage Fracture | 1735.00 | 1735.40 | 0 |
2012-11-13 | Multi-Stage Fracture | 1693.00 | 1693.40 | 0 |
2012-11-13 | Multi-Stage Fracture | 1655.00 | 1655.40 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 848 | 0.0 | 0.0 | 0.0 |
2013 | 8516 | 0.0 | 0.0 | 0.0 |
2014 | 8625 | 0.0 | 0.0 | 0.0 |
2015 | 8308 | 0.0 | 0.0 | 0.0 |
2016 | 8672 | 0.0 | 0.0 | 0.0 |
2017 | 8425 | 0.0 | 0.0 | 0.0 |
2018 | 8660 | 0.0 | 0.0 | 0.0 |
2019 | 1536 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-11-09 | No Incident Encountered | 0.00 | 0.00 |
2012-11-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]