X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0785211711020

Well Details

Well ID: 0785211711020
Loading map...
Location: 02/11-17-078-21W5/0
Location Alias: 02/11-17-78-21 W5M
Location Alias 2: 02/11-17-078-21 W5/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 5
Range: 21
Section: 17
County/Municipality: Municipal District of Smoky River No. 130
Well Name: LONG RUN HZ 102 NVILLE 11-17-78-21
Operator Name: Long Run Exploration Ltd.
License Number: 0449579
License Date: 2012-10-30
License Status: Issued
Spud Date: 2012-11-03
Final Drill Date: 2012-11-08
Well Total Depth: 2151.00 m
Surface Hole Latitude: 55.751329
Surface Hole Longitude: -117.231510

For data sources see[1][2]

Well History

Date Event
2012-10-30 Obtained License
2012-11-03 Surface Casing Operation Performed
2012-11-04 Direction Drilling Operation Performed - Deviate
2012-11-05 Direction Drilling Operation Performed - Horizontal
2012-11-06 Intermediate Casing Operation Performed
2012-11-06 Well Log Performed
2012-11-08 Finished Drilling
2012-11-08 Well Log Performed
2012-11-08 Well Mode changed to Drilled and Cased
2012-11-09 Liner Casing Operation Performed
2012-11-09 Rig Released
2012-11-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-16 Well Began Production
2012-11-16 Well Fluid changed to Crude Oil
2012-11-16 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-11-03 Trinidad Drilling Ltd. 21 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-11-04 519.90 Deviate (5 - 79 degrees)
2012-11-05 1088.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-13 Multi-Stage Fracture 1975.00 1975.40 0
2012-11-13 Multi-Stage Fracture 1615.00 1615.40 0
2012-11-14 Multi-Stage Fracture 1572.00 1572.40 0
2012-11-14 Multi-Stage Fracture 1535.00 1535.40 0
2012-11-14 Multi-Stage Fracture 1495.00 1495.40 0
2012-11-14 Multi-Stage Fracture 1455.00 1455.40 0
2012-11-14 Multi-Stage Fracture 1415.00 1415.40 0
2012-11-14 Multi-Stage Fracture 1375.00 1375.40 0
2012-11-14 Multi-Stage Fracture 1335.00 1335.40 0
2012-11-14 Multi-Stage Fracture 1295.00 1295.40 0
2012-11-14 Multi-Stage Fracture 1255.00 1255.40 0
2012-11-13 Multi-Stage Fracture 1933.00 1933.40 0
2012-11-14 Multi-Stage Fracture 1225.00 1225.40 0
2012-11-14 Multi-Stage Fracture 1195.00 1195.40 0
2012-11-14 Multi-Stage Fracture 1165.00 1165.40 0
2012-11-13 Multi-Stage Fracture 1895.00 1895.40 0
2012-11-13 Multi-Stage Fracture 1855.00 1855.40 0
2012-11-13 Multi-Stage Fracture 1815.00 1815.40 0
2012-11-13 Multi-Stage Fracture 1775.00 1775.40 0
2012-11-13 Multi-Stage Fracture 1735.00 1735.40 0
2012-11-13 Multi-Stage Fracture 1693.00 1693.40 0
2012-11-13 Multi-Stage Fracture 1655.00 1655.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 848 0.0 0.0 0.0
2013 8516 0.0 0.0 0.0
2014 8625 0.0 0.0 0.0
2015 8308 0.0 0.0 0.0
2016 8672 0.0 0.0 0.0
2017 8425 0.0 0.0 0.0
2018 8660 0.0 0.0 0.0
2019 1536 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-09 No Incident Encountered 0.00 0.00
2012-11-14 No Incident Encountered 0.00 0.00

For data sources see[8]

References