X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0785211512000

Well Details

Well ID: 0785211512000
Loading map...
Location: 00/12-15-078-21W5/0
Location Alias: 00/12-15-78-21 W5M
Location Alias 2: 00/12-15-078-21 W5/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 5
Range: 21
Section: 15
County/Municipality: Municipal District of Smoky River No. 130
Well Name: LONG RUN HZ ROXANA 12-15-78-21
Operator Name: Long Run Exploration Ltd.
License Number: 0449121
License Date: 2012-10-11
License Status: Issued
Spud Date: 2012-10-23
Final Drill Date: 2012-10-30
Well Total Depth: 2653.00 m
Surface Hole Latitude: 55.764857
Surface Hole Longitude: -117.154247

For data sources see[1][2]

Well History

Date Event
2012-10-11 Obtained License
2012-10-24 Surface Casing Operation Performed
2012-10-25 Direction Drilling Operation Performed - Deviate
2012-10-26 Direction Drilling Operation Performed - Horizontal
2012-10-27 Intermediate Casing Operation Performed
2012-10-27 Well Log Performed
2012-10-30 Finished Drilling
2012-10-30 Well Log Performed
2012-10-30 Well Mode changed to Drilled and Cased
2012-10-31 Liner Casing Operation Performed
2012-10-31 Rig Released
2012-11-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-12 Well Began Production
2012-11-12 Well Fluid changed to Crude Oil
2012-11-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-10-23 Trinidad Drilling Ltd. 21 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-10-25 504.90 Deviate (5 - 79 degrees)
2012-10-26 1119.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-09 Multi-Stage Fracture 2629.00 2629.40 0
2012-11-09 Multi-Stage Fracture 2129.00 2129.40 0
2012-11-09 Multi-Stage Fracture 2079.00 2079.40 0
2012-11-09 Multi-Stage Fracture 2029.00 2029.40 0
2012-11-10 Multi-Stage Fracture 1979.00 1979.40 0
2012-11-10 Multi-Stage Fracture 1929.00 1929.40 0
2012-11-10 Multi-Stage Fracture 1919.00 1919.40 0
2012-11-10 Multi-Stage Fracture 1879.00 1879.40 0
2012-11-10 Multi-Stage Fracture 1829.00 1829.40 0
2012-11-10 Multi-Stage Fracture 1779.00 1779.40 0
2012-11-10 Multi-Stage Fracture 1729.00 1729.40 0
2012-11-09 Multi-Stage Fracture 2529.00 2529.40 0
2012-11-10 Multi-Stage Fracture 1679.00 1679.40 0
2012-11-10 Multi-Stage Fracture 1629.00 1629.40 0
2012-11-10 Multi-Stage Fracture 1579.00 1579.40 0
2012-11-10 Multi-Stage Fracture 1529.00 1529.40 0
2012-11-10 Multi-Stage Fracture 1479.00 1479.40 0
2012-11-10 Multi-Stage Fracture 1429.00 1429.40 0
2012-11-10 Multi-Stage Fracture 1379.00 1379.40 0
2012-11-10 Multi-Stage Fracture 1329.00 1329.40 0
2012-11-10 Multi-Stage Fracture 1279.00 1279.40 0
2012-11-10 Multi-Stage Fracture 1229.00 1229.40 0
2012-11-09 Multi-Stage Fracture 2479.00 2479.40 0
2012-11-09 Multi-Stage Fracture 2429.00 2429.40 0
2012-11-09 Multi-Stage Fracture 2379.00 2379.40 0
2012-11-09 Multi-Stage Fracture 2329.00 2329.40 0
2012-11-09 Multi-Stage Fracture 2279.00 2279.40 0
2012-11-09 Multi-Stage Fracture 2229.00 2229.40 0
2012-11-09 Multi-Stage Fracture 2179.00 2179.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 950 0.0 0.0 0.0
2013 8364 0.0 0.0 0.0
2014 8440 0.0 0.0 0.0
2015 8718 0.0 0.0 0.0
2016 8763 0.0 0.0 0.0
2017 7733 0.0 0.0 0.0
2018 8340 0.0 0.0 0.0
2019 8545 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-31 No Incident Encountered 0.00 0.00
2012-11-10 No Incident Encountered 0.00 0.00

For data sources see[8]

References