If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0785210415020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.736384,"lon":-117.22088,"icon":""}]} |
Location: 02/15-04-078-21W5/0 | |
Location Alias: 02/15-04-78-21 W5M | |
Location Alias 2: 02/15-04-078-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 5 | |
Range: 21 | |
Section: 04 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: LONG RUN HZ 102 NVILLE 15-4-78-21 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0442598 | |
License Date: 2012-01-10 | |
License Status: Issued | |
Spud Date: 2012-02-11 | |
Final Drill Date: 2012-02-20 | |
Well Total Depth: 2599.00 m | |
Surface Hole Latitude: 55.736384 | |
Surface Hole Longitude: -117.220880 |
Date | Event |
---|---|
2012-01-10 | Obtained License |
2012-02-11 | Surface Casing Operation Performed |
2012-02-12 | Well Log Performed |
2012-02-13 | Direction Drilling Operation Performed - Deviate |
2012-02-15 | Direction Drilling Operation Performed - Horizontal |
2012-02-15 | Intermediate Casing Operation Performed |
2012-02-15 | Well Log Performed |
2012-02-20 | Finished Drilling |
2012-02-20 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-20 | Well Log Performed |
2012-02-20 | Well Mode changed to Drilled and Cased |
2012-02-21 | Liner Casing Operation Performed |
2012-02-23 | Rig Released |
2012-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-18 | Well Began Production |
2012-03-18 | Well Fluid changed to Crude Oil |
2012-03-18 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-11 | Ensign Drilling Inc. | 88 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-13 | 637.20 | Deviate (5 - 79 degrees) |
2012-02-15 | 1072.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-20 | Open Hole/Barefoot Completion | 2555.50 | 2599.00 | 0 |
2012-03-13 | Multi-Stage Fracture | 1963.60 | 1963.70 | 0 |
2012-03-13 | Multi-Stage Fracture | 1888.80 | 1888.90 | 0 |
2012-03-13 | Multi-Stage Fracture | 1814.00 | 1814.10 | 0 |
2012-03-13 | Multi-Stage Fracture | 1739.20 | 1739.30 | 0 |
2012-03-13 | Multi-Stage Fracture | 1664.80 | 1664.90 | 0 |
2012-03-13 | Multi-Stage Fracture | 1589.90 | 1590.00 | 0 |
2012-03-14 | Multi-Stage Fracture | 1515.10 | 1515.20 | 0 |
2012-03-14 | Multi-Stage Fracture | 1440.10 | 1440.20 | 0 |
2012-03-14 | Multi-Stage Fracture | 1365.10 | 1365.20 | 0 |
2012-03-14 | Multi-Stage Fracture | 1290.40 | 1290.50 | 0 |
2012-03-13 | Multi-Stage Fracture | 2555.40 | 2555.50 | 0 |
2012-03-14 | Multi-Stage Fracture | 1216.20 | 1216.30 | 0 |
2012-03-14 | Multi-Stage Fracture | 1131.10 | 1131.20 | 0 |
2012-03-13 | Multi-Stage Fracture | 2481.60 | 2481.70 | 0 |
2012-03-13 | Multi-Stage Fracture | 2407.90 | 2408.00 | 0 |
2012-03-13 | Multi-Stage Fracture | 2334.20 | 2334.30 | 0 |
2012-03-13 | Multi-Stage Fracture | 2260.80 | 2260.90 | 0 |
2012-03-13 | Multi-Stage Fracture | 2186.80 | 2186.90 | 0 |
2012-03-13 | Multi-Stage Fracture | 2112.50 | 2112.60 | 0 |
2012-03-13 | Multi-Stage Fracture | 2038.50 | 2038.60 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6154 | 0.0 | 0.0 | 0.0 |
2013 | 8661 | 0.0 | 0.0 | 0.0 |
2014 | 8100 | 0.0 | 0.0 | 0.0 |
2015 | 8751 | 0.0 | 0.0 | 0.0 |
2016 | 8227 | 0.0 | 0.0 | 0.0 |
2017 | 8155 | 0.0 | 0.0 | 0.0 |
2018 | 8636 | 0.0 | 0.0 | 0.0 |
2019 | 8550 | 0.0 | 0.0 | 0.0 |
2020 | 2148 | 0.0 | 0.0 | 0.0 |
For data sources see[7]