If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0785202906020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.787457,"lon":-117.070689,"icon":""}]} |
Location: 02/06-29-078-20W5/0 | |
Location Alias: 02/06-29-78-20 W5M | |
Location Alias 2: 02/06-29-078-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 5 | |
Range: 20 | |
Section: 29 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: BERNUM ET AL 102 ROXANA 6-29-78-20 | |
Operator Name: Caltex Resources Ltd. | |
License Number: 0434249 | |
License Date: 2011-06-10 | |
License Status: Suspension | |
Spud Date: 2011-07-05 | |
Final Drill Date: 2011-07-15 | |
Well Total Depth: 2376.00 m | |
Surface Hole Latitude: 55.787457 | |
Surface Hole Longitude: -117.070689 |
Date | Event |
---|---|
2011-06-10 | Obtained License |
2011-07-06 | Surface Casing Operation Performed |
2011-07-11 | Direction Drilling Operation Performed - Deviate |
2011-07-15 | Finished Drilling |
2011-07-15 | Well Log Performed |
2011-07-15 | Well Mode changed to Drilled and Cased |
2011-07-17 | Production Casing Operation Performed |
2011-07-18 | Rig Released |
2011-08-01 | Perforation Treatment Performed - Jet Perforation |
2011-08-19 | Well Began Production |
2011-08-19 | Well Fluid changed to Crude Oil |
2011-08-19 | Well Mode changed to Pumping |
2015-11-07 | Well Fluid changed to Crude Oil |
2015-11-07 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-07-11 | 1803.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-08-01 | Perforation | 2332.50 | 2335.00 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3133 | 0.0 | 0.0 | 0.0 |
2012 | 4773 | 0.0 | 0.0 | 0.0 |
For data sources see[6]