X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0785083610002

Well Details

Well ID: 0785083610002
Loading map...
Location: 00/10-36-078-08W5/2
Location Alias: 00/10-36-78-08 W5M
Location Alias 2: 00/10-36-078-08 W5/02
Country: Canada
Province: Alberta
Township: 078
Meridian: 5
Range: 08
Section: 36
County/Municipality: Northern Sunrise County
Well Name: AMOCO ET AL NIPISI 10-36-78-8
Operator Name: Canadian Natural Resources Limited
License Number: 0028659
License Date: 1965-07-30
License Status: Abandoned
Spud Date: 1965-08-03
Final Drill Date: 1965-08-15
Well Total Depth: 1746.50 m
Surface Hole Latitude: 55.804870
Surface Hole Longitude: -115.097706

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-07-30 Obtained License
1965-08-15 Finished Drilling
1965-08-15 Well Mode changed to Drilled and Cased
1965-08-17 Production Casing Operation Performed
1965-08-18 Perforation Treatment Performed - Jet Perforation
1965-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-02-25 Perforation Treatment Performed - Jet Perforation
1966-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-02 Perforation Treatment Performed - Fractured
1973-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-08 Well Log Performed
1999-08-30 Perforation Treatment Performed - Cement Squeeze
1999-08-30 Plug Back Performed
1999-08-31 Perforation Treatment Performed - Jet Perforation
1999-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-01 Perforation Treatment Performed - Remedial Casing
2006-07-14 Perforation Treatment Performed - Cement Plug
2006-08-08 Perforation Treatment Performed - Jet Perforation
2006-08-08 Perforation Treatment Performed - Remedial Casing
2006-08-08 Well Log Performed
2006-08-11 Perforation Treatment Performed - Remedial Casing
2006-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-14 Perforation Treatment Performed - Jet Perforation
2006-08-14 Plug Back Performed
2006-08-14 Well Log Performed
2006-08-14 Well Mode changed to Abandoned Zone
2006-08-29 Well Abandoned
2006-08-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-08-18 Perforation 1707.80 1711.50 7
1999-08-31 Perforation 1613.20 1616.20 17
1999-09-01 Remedial Casing Cementing 1613.20 1616.20 0
1999-09-01 Packing Device Capped w/Cement 1603.90 1693.70 0
2006-07-14 Cement Plug 1585.00 1603.00 0
2006-08-08 Perforation 464.00 465.00 17
2006-08-08 Remedial Casing Cementing 464.00 465.00 0
2006-08-08 Perforation 430.00 431.00 17
2006-08-11 Remedial Casing Cementing 430.00 431.00 0
2006-08-14 Perforation 530.60 531.80 17
2006-08-14 Perforation 516.30 517.80 17
1965-08-18 Perforation 1714.20 1714.80 7
2006-08-14 Perforation 443.00 445.50 17
2006-08-14 Packing Device Capped w/Cement 421.00 429.00 0
1965-08-21 Acid Treatment 1707.80 1714.80 0
1966-02-22 Acid Treatment 1707.80 1714.80 0
1966-02-25 Perforation 1708.10 1709.90 7
1966-02-26 Acid Treatment 1707.80 1714.80 0
1966-03-02 Fracture 1707.80 1714.80 0
1973-06-11 Acid Treatment 1707.80 1714.80 0
1999-08-30 Cement Squeeze 1707.80 1714.80 0

For data sources see[4]



References