X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0785083504000

Well Details

Well ID: 0785083504000
Loading map...
Location: 00/04-35-078-08W5/0
Location Alias: 00/04-35-78-08 W5M
Location Alias 2: 00/04-35-078-08 W5/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 5
Range: 08
Section: 35
County/Municipality: Northern Sunrise County
Well Name: AMOCO UNIT 249 NIPISI 4-35-78-8
Operator Name: Canadian Natural Resources Limited
License Number: 0043707
License Date: 1972-09-29
License Status: Issued
Spud Date: 1972-10-07
Final Drill Date: 1972-10-20
Well Total Depth: 1764.80 m
Surface Hole Latitude: 55.798133
Surface Hole Longitude: -115.136289

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-09-29 Obtained License
1972-10-20 Finished Drilling
1972-10-20 Well Mode changed to Drilled and Cased
1972-10-22 Production Casing Operation Performed
1972-11-02 Perforation Treatment Performed - Jet Perforation
1972-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-05 Well Began Production
1972-11-05 Well Fluid changed to Crude Oil
1972-11-05 Well Mode changed to Flowing
1975-05-29 Well Fluid changed to Crude Oil
1975-05-29 Well Mode changed to Pumping
1988-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-24 Perforation Treatment Performed - Jet Perforation
1990-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-29 Perforation Treatment Performed - Chemical Squeeze
2016-04-30 Well Fluid changed to Crude Oil
2016-04-30 Well Mode changed to Suspended
2017-03-01 Well Fluid changed to Crude Oil
2017-03-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-11-02 Perforation 1722.70 1727.60 7
1972-11-02 Perforation 1728.20 1729.40 7
1972-11-02 Perforation 1730.30 1731.30 7
1972-11-03 Acid Treatment 1722.70 1731.30 0
1988-01-29 Acid Treatment 1722.70 1731.30 0
1990-03-24 Perforation 1722.60 1729.40 13
1990-03-24 Perforation 1730.30 1733.00 13
1990-03-25 Acid Treatment 1722.60 1733.00 0
1991-03-29 Chemical Squeeze 1722.60 1733.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 1289 0.0 0.0 0.0
1973 8183 0.0 0.0 0.0
1974 7147 0.0 0.0 0.0
1975 3640 0.0 0.0 0.0
1976 2830 0.0 0.0 0.0
1977 7818 0.0 0.0 0.0
1978 6623 0.0 0.0 0.0
1979 7644 0.0 0.0 0.0
1980 8096 0.0 0.0 0.0
1981 7486 0.0 0.0 0.0
1982 7843 0.0 0.0 0.0
1983 8388 0.0 0.0 0.0
1984 8505 0.0 0.0 0.0
1985 8342 0.0 0.0 0.0
1986 8011 0.0 0.0 0.0
1987 8318 0.0 0.0 0.0
1988 8259 0.0 0.0 0.0
1989 8442 0.0 0.0 0.0
1990 8117 0.0 0.0 0.0
1991 8127 0.0 0.0 0.0
1992 8660 0.0 0.0 0.0
1993 8219 0.0 0.0 0.0
1994 8517 0.0 0.0 0.0
1995 8031 0.0 0.0 0.0
1996 8263 0.0 0.0 0.0
1997 8338 0.0 0.0 0.0
1998 8454 0.0 0.0 0.0
1999 8431 0.0 0.0 0.0
2000 8592 0.0 0.0 0.0
2001 8053 0.0 0.0 0.0
2002 8559 0.0 0.0 0.0
2003 8297 0.0 0.0 0.0
2004 8608 0.0 0.0 0.0
2005 7466 0.0 0.0 0.0
2006 7939 0.0 0.0 0.0
2007 8044 0.0 0.0 0.0
2008 8016 0.0 0.0 0.0
2009 8717 0.0 0.0 0.0
2010 8070 0.0 0.0 0.0
2011 7900 0.0 0.0 0.0
2012 7636 0.0 0.0 0.0
2013 6612 0.0 0.0 0.0
2014 8311 0.0 0.0 0.0
2015 2672 0.0 0.0 0.0
2017 6212 0.0 0.0 0.0
2018 8334 0.0 0.0 0.0
2019 7044 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[5]

References