X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0785081506000

Well Details

Well ID: 0785081506000
Loading map...
Location: 00/06-15-078-08W5/0
Location Alias: 00/06-15-78-08 W5M
Location Alias 2: 00/06-15-078-08 W5/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 5
Range: 08
Section: 15
County/Municipality: Northern Sunrise County
Well Name: PAN AM P-1 NIPISI 6-15-78-8
Operator Name: Canadian Natural Resources Limited
License Number: 0034896
License Date: 1968-10-02
License Status: Re-Entered
Spud Date: 1968-10-05
Final Drill Date: 1968-10-16
Well Total Depth: 1761.70 m
Surface Hole Latitude: 55.758272
Surface Hole Longitude: -115.154727

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-10-02 Obtained License
1968-10-16 Finished Drilling
1968-10-18 Production Casing Operation Performed
1968-10-31 Perforation Treatment Performed - Jet Perforation
1968-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-11-22 Perforation Treatment Performed - Cement Squeeze
1968-11-24 Perforation Treatment Performed - Acid Wash - No Pressure
1968-11-24 Perforation Treatment Performed - Jet Perforation
1968-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-02-18 Well Mode changed to Drilled and Cased
1973-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-07 Perforation Treatment Performed - Jet Perforation
1973-02-09 Well Began Injection
1973-02-09 Well Fluid changed to Water
1973-02-09 Well Type changed to Injection
1974-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-09-03 Perforation Treatment Performed - Acid Wash - No Pressure
1995-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-27 Plug Back Performed
1995-09-27 Well Abandoned
1995-09-27 Well Fluid changed to Water
1995-09-27 Well Log Performed
1995-09-27 Well Mode changed to Abandoned Zone
1995-09-27 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-10-31 Perforation 1735.80 1736.80 13
1973-02-07 Perforation 1742.50 1745.60 7
1973-02-07 Perforation 1746.80 1747.70 7
1973-02-07 Perforation 1748.60 1750.50 7
1973-02-07 Acid Treatment 1739.80 1750.50 0
1974-09-03 Acid Wash 1735.80 1748.30 0
1974-09-03 Acid Treatment 1735.80 1748.30 0
1995-09-27 Packing Device Capped w/Cement 1720.20 1728.20 0
1968-10-31 Perforation 1738.00 1738.60 13
1968-11-01 Acid Treatment 1735.80 1738.60 0
1968-11-22 Cement Squeeze 1735.80 1738.60 13
1968-11-24 Perforation 1735.80 1736.80 13
1968-11-24 Acid Wash 1735.80 1736.80 0
1968-11-26 Acid Treatment 1735.80 1736.80 0
1973-02-07 Perforation 1739.80 1740.40 7
1973-02-07 Perforation 1741.30 1742.20 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0

For data sources see[5]

References