X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776133513030

Well Details

Well ID: 0776133513030
Loading map...
Location: 03/13-35-077-13W6/0
Location Alias: 03/13-35-77-13 W6M
Location Alias 2: 03/13-35-077-13 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 13
Section: 35
County/Municipality: Saddle Hills County
Well Name: BIR 12-03 HZ 103 PCOUPES 13-35-77-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0482074
License Date: 2016-12-21
License Status: Issued
Spud Date: 2017-05-20
Final Drill Date: 2017-06-01
Well Total Depth: 4385.00 m
Surface Hole Latitude: 55.733886
Surface Hole Longitude: -119.933493

For data sources see[1][2]

Well History

Date Event
2016-12-21 Obtained License
2017-05-22 Direction Drilling Operation Performed - Deviate
2017-05-22 Surface Casing Operation Performed
2017-05-27 Direction Drilling Operation Performed - Horizontal
2017-05-27 Well Log Performed
2017-06-01 Finished Drilling
2017-06-01 Well Log Performed
2017-06-01 Well Mode changed to Drilled and Cased
2017-06-02 Production Casing Operation Performed
2017-06-02 Well Log Performed
2017-06-03 Rig Released
2017-08-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-12 Perforation Treatment Performed - Open-Hole Completion
2017-08-13 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-14 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-22 Well Began Production
2017-08-22 Well Fluid changed to Gas
2017-08-22 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-05-22 700.20 Deviate (5 - 79 degrees)
2017-05-27 2375.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-08-12 Open Hole/Barefoot Completion 4378.00 4385.00 0
2017-08-12 Multi-Stage Fracture 3953.60 3954.40 0
2017-08-12 Multi-Stage Fracture 3888.30 3889.10 0
2017-08-12 Multi-Stage Fracture 3835.60 3836.40 0
2017-08-12 Multi-Stage Fracture 3783.00 3783.80 0
2017-08-12 Multi-Stage Fracture 3730.50 3731.30 0
2017-08-12 Multi-Stage Fracture 3677.90 3678.70 0
2017-08-12 Multi-Stage Fracture 3625.30 3626.10 0
2017-08-12 Multi-Stage Fracture 3572.80 3573.60 0
2017-08-12 Multi-Stage Fracture 3520.00 3521.00 0
2017-08-13 Multi-Stage Fracture 3454.90 3455.70 0
2017-08-12 Multi-Stage Fracture 4366.60 4367.90 0
2017-08-13 Multi-Stage Fracture 3402.30 3403.10 0
2017-08-13 Multi-Stage Fracture 3349.70 3350.50 0
2017-08-13 Multi-Stage Fracture 3297.20 3298.00 0
2017-08-13 Multi-Stage Fracture 3244.50 3245.30 0
2017-08-13 Multi-Stage Fracture 3192.00 3192.80 0
2017-08-13 Multi-Stage Fracture 3126.80 3127.60 0
2017-08-13 Multi-Stage Fracture 3074.30 3075.10 0
2017-08-13 Multi-Stage Fracture 3021.70 3022.50 0
2017-08-13 Multi-Stage Fracture 2969.10 2969.90 0
2017-08-13 Multi-Stage Fracture 2916.40 2917.20 0
2017-08-12 Multi-Stage Fracture 4333.90 4334.70 0
2017-08-13 Multi-Stage Fracture 2863.80 2864.60 0
2017-08-13 Multi-Stage Fracture 2811.20 2812.00 0
2017-08-13 Multi-Stage Fracture 2746.00 2746.80 0
2017-08-13 Multi-Stage Fracture 2693.40 2694.20 0
2017-08-13 Multi-Stage Fracture 2640.90 2641.70 0
2017-08-14 Multi-Stage Fracture 2588.30 2589.10 0
2017-08-14 Multi-Stage Fracture 2535.80 2536.60 0
2017-08-14 Multi-Stage Fracture 2483.20 2484.00 0
2017-08-14 Multi-Stage Fracture 2443.20 2444.00 0
2017-08-12 Multi-Stage Fracture 4269.40 4270.20 0
2017-08-12 Multi-Stage Fracture 4216.70 4217.50 0
2017-08-12 Multi-Stage Fracture 4164.10 4164.90 0
2017-08-12 Multi-Stage Fracture 4111.40 4112.20 0
2017-08-12 Multi-Stage Fracture 4058.80 4059.60 0
2017-08-12 Multi-Stage Fracture 4006.20 4007.00 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-08-12 2017-08-14 2,217 16,211 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 85.2961 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 8.6472 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 5.8963 N/A
2K7 Solution W-M BJ Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0302 N/A
Methanol 67-56-1 100 0.0302 N/A
Water 7732-18-5 100 0.0302 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0039 N/A
FRP-1 BJ Services Friction Reducer Ammonium sulfate 7783-20-2 100 0.105 N/A
Non-hazardous Not Available 100 0.105 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-07-16 2017-07-21 Recycled Fracturing Water (treated at independent stand-alone facility) 1888
2017-08-10 2017-08-18 Recycled Fracturing Water (treated at well site) 648
2017-08-10 2017-08-10 Recycled Fracturing Water (treated at well site) 10
2017-08-10 2017-08-12 Recycled Fracturing Water (treated at well site) 20
2017-08-09 2017-08-11 Recycled Fracturing Water (treated at well site) 30
2017-08-10 2017-08-18 Surface Water - Runoff 14171

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2720 0.0 0.0 0.0
2018 8532 0.0 0.0 0.0
2019 8651 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-06-03 No Incident Encountered 0.00 0.00
2017-08-14 No Incident Encountered 0.00 0.00

For data sources see[9]

References