X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776133303020

Well Details

Well ID: 0776133303020
Loading map...
Location: 02/03-33-077-13W6/0
Location Alias: 02/03-33-77-13 W6M
Location Alias 2: 02/03-33-077-13 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 13
Section: 33
County/Municipality: Saddle Hills County
Well Name: BIR 4-26 HZ 102 PCOUPES 3-33-77-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0481624
License Date: 2016-11-25
License Status: Issued
Spud Date: 2017-03-14
Final Drill Date: 2017-04-01
Well Total Depth: 5754.00 m
Surface Hole Latitude: 55.696074
Surface Hole Longitude: -119.912049

For data sources see[1][2]

Well History

Date Event
2016-11-25 Obtained License
2017-03-15 Surface Casing Operation Performed
2017-03-18 Direction Drilling Operation Performed - Deviate
2017-03-25 Direction Drilling Operation Performed - Horizontal
2017-03-25 Kick Occurred
2017-04-01 Finished Drilling
2017-04-01 Well Log Performed
2017-04-01 Well Mode changed to Drilled and Cased
2017-04-03 Production Casing Operation Performed
2017-04-05 Rig Released
2017-06-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-19 Perforation Treatment Performed - Open-Hole Completion
2017-06-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-24 Well Began Production
2017-08-24 Well Fluid changed to Gas
2017-08-24 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-03-18 1530.30 Deviate (5 - 79 degrees)
2017-03-25 2617.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-06-19 Open Hole/Barefoot Completion 5751.00 5754.00 0
2017-06-20 Multi-Stage Fracture 4873.80 4874.70 0
2017-06-20 Multi-Stage Fracture 4758.60 4759.50 0
2017-06-20 Multi-Stage Fracture 4642.90 4643.80 0
2017-06-20 Multi-Stage Fracture 4527.20 4528.10 0
2017-06-20 Multi-Stage Fracture 4411.60 4412.50 0
2017-06-20 Multi-Stage Fracture 4295.90 4296.80 0
2017-06-20 Multi-Stage Fracture 4193.10 4194.00 0
2017-06-20 Multi-Stage Fracture 4090.00 4090.90 0
2017-06-20 Multi-Stage Fracture 3962.20 3963.10 0
2017-06-20 Multi-Stage Fracture 3846.60 3847.50 0
2017-06-19 Multi-Stage Fracture 5739.70 5741.00 0
2017-06-20 Multi-Stage Fracture 3730.90 3731.80 0
2017-06-20 Multi-Stage Fracture 3615.40 3616.30 0
2017-06-21 Multi-Stage Fracture 3499.80 3500.70 0
2017-06-21 Multi-Stage Fracture 3397.50 3398.40 0
2017-06-21 Multi-Stage Fracture 3295.40 3296.30 0
2017-06-21 Multi-Stage Fracture 3179.90 3180.80 0
2017-06-21 Multi-Stage Fracture 3065.00 3065.90 0
2017-06-21 Multi-Stage Fracture 2949.40 2950.30 0
2017-06-21 Multi-Stage Fracture 2833.70 2834.60 0
2017-06-21 Multi-Stage Fracture 2718.00 2718.90 0
2017-06-19 Multi-Stage Fracture 5668.90 5669.80 0
2017-06-21 Multi-Stage Fracture 2640.30 2641.20 0
2017-06-19 Multi-Stage Fracture 5553.20 5554.10 0
2017-06-19 Multi-Stage Fracture 5438.20 5439.10 0
2017-06-20 Multi-Stage Fracture 5323.00 5323.90 0
2017-06-20 Multi-Stage Fracture 5207.80 5208.70 0
2017-06-20 Multi-Stage Fracture 5104.90 5105.80 0
2017-06-20 Multi-Stage Fracture 4989.20 4990.10 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-19 2017-06-21 2,405 12,689 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 84.8985 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 8.9384 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 6.0084 N/A
2K7 Solution W-M BJ Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0283 N/A
Methanol 67-56-1 100 0.0283 N/A
Water 7732-18-5 100 0.0283 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0042 N/A
FRP-1 BJ Services Friction Reducer Ammonium sulfate 7783-20-2 100 0.1016 N/A
Non-hazardous Not Available 100 0.1016 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-06-16 2017-06-27 Recycled Fracturing Water (treated at well site) 698
2017-06-22 2017-06-23 Recycled Fracturing Water (treated at well site) 69
2017-06-16 2017-06-27 Groundwater - Saline 156
2017-06-07 2017-06-21 Recycled Fracturing Water (treated at well site) 824
2017-06-07 2017-06-27 Recycled Fracturing Water (treated at independent stand-alone facility) 242
2017-06-23 2017-06-25 Recycled Fracturing Water (treated at well site) 113
2017-06-16 2017-06-17 Recycled Fracturing Water (treated at well site) 46
2017-08-14 2017-08-14 Recycled Fracturing Water (treated at well site) 11
2017-08-09 2017-08-19 Recycled Fracturing Water (treated at well site) 186
2017-06-16 2017-06-28 Surface Water - Runoff 10436

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2225 0.0 0.0 0.0
2018 8662 0.0 0.0 0.0
2019 8667 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-25 Kick 2649.00 2650.00
2017-06-21 No Incident Encountered 0.00 0.00

For data sources see[9]

References