If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776132813020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.696074,"lon":-119.912176,"icon":""}]} |
Location: 02/13-28-077-13W6/0 | |
Location Alias: 02/13-28-77-13 W6M | |
Location Alias 2: 02/13-28-077-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 13 | |
Section: 28 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 4-26 HZ 102 PCOUPES 13-28-77-13 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0481621 | |
License Date: 2016-11-25 | |
License Status: Issued | |
Spud Date: 2017-02-14 | |
Final Drill Date: 2017-03-05 | |
Well Total Depth: 5744.00 m | |
Surface Hole Latitude: 55.696074 | |
Surface Hole Longitude: -119.912176 |
Date | Event |
---|---|
2015-03-05 | Well Log Performed |
2016-11-25 | Obtained License |
2017-02-15 | Surface Casing Operation Performed |
2017-02-17 | Direction Drilling Operation Performed - Deviate |
2017-02-22 | Kick Occurred |
2017-02-24 | Direction Drilling Operation Performed - Horizontal |
2017-03-05 | Finished Drilling |
2017-03-05 | Well Log Performed |
2017-03-05 | Well Mode changed to Drilled and Cased |
2017-03-08 | Production Casing Operation Performed |
2017-03-12 | Rig Released |
2017-06-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-21 | Perforation Treatment Performed - Open-Hole Completion |
2017-06-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-01 | Well Fluid changed to Gas |
2017-08-01 | Well Mode changed to Testing |
2017-08-25 | Well Began Production |
2017-08-25 | Well Fluid changed to Gas |
2017-08-25 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-02-14 | Trinidad Drilling Ltd. | 449 | N/A | Drill To LD |
2017-03-14 | Trinidad Drilling Ltd. | 449 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-02-17 | 961.90 | Deviate (5 - 79 degrees) |
2017-02-24 | 2671.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-06-21 | Open Hole/Barefoot Completion | 5739.00 | 5744.00 | 0 |
2017-06-22 | Multi-Stage Fracture | 4885.10 | 4886.00 | 0 |
2017-06-22 | Multi-Stage Fracture | 4769.30 | 4770.20 | 0 |
2017-06-22 | Multi-Stage Fracture | 4653.60 | 4654.50 | 0 |
2017-06-22 | Multi-Stage Fracture | 4550.60 | 4551.50 | 0 |
2017-06-22 | Multi-Stage Fracture | 4437.90 | 4438.80 | 0 |
2017-06-22 | Multi-Stage Fracture | 4319.30 | 4320.20 | 0 |
2017-06-22 | Multi-Stage Fracture | 4217.20 | 4218.10 | 0 |
2017-06-22 | Multi-Stage Fracture | 4101.50 | 4102.40 | 0 |
2017-06-22 | Multi-Stage Fracture | 3985.80 | 3986.70 | 0 |
2017-06-22 | Multi-Stage Fracture | 3883.00 | 3883.90 | 0 |
2017-06-21 | Multi-Stage Fracture | 5727.70 | 5729.00 | 0 |
2017-06-22 | Multi-Stage Fracture | 3767.60 | 3768.50 | 0 |
2017-06-22 | Multi-Stage Fracture | 3651.80 | 3652.70 | 0 |
2017-06-22 | Multi-Stage Fracture | 3548.60 | 3549.50 | 0 |
2017-06-22 | Multi-Stage Fracture | 3433.70 | 3434.60 | 0 |
2017-06-23 | Multi-Stage Fracture | 3317.90 | 3318.80 | 0 |
2017-06-23 | Multi-Stage Fracture | 3215.00 | 3215.90 | 0 |
2017-06-23 | Multi-Stage Fracture | 3099.20 | 3100.10 | 0 |
2017-06-23 | Multi-Stage Fracture | 2984.20 | 2985.10 | 0 |
2017-06-23 | Multi-Stage Fracture | 2869.60 | 2870.50 | 0 |
2017-06-23 | Multi-Stage Fracture | 2766.50 | 2767.40 | 0 |
2017-06-21 | Multi-Stage Fracture | 5657.20 | 5658.10 | 0 |
2017-06-23 | Multi-Stage Fracture | 2688.60 | 2689.50 | 0 |
2017-06-21 | Multi-Stage Fracture | 5554.10 | 5555.00 | 0 |
2017-06-22 | Multi-Stage Fracture | 5438.40 | 5439.30 | 0 |
2017-06-22 | Multi-Stage Fracture | 5322.60 | 5323.50 | 0 |
2017-06-22 | Multi-Stage Fracture | 5219.50 | 5220.40 | 0 |
2017-06-22 | Multi-Stage Fracture | 5103.80 | 5104.70 | 0 |
2017-06-22 | Multi-Stage Fracture | 4988.20 | 4989.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-06-21 | 2017-06-23 | 2,406 | 11,966 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 84.1331 | N/A | |||
FRAC SAND. 30/50 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 9.3029 | N/A | ||
FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 6.4089 | N/A | ||
2K7 Solution W-M | BJ Services | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0279 | N/A | |
Methanol | 67-56-1 | 100 | 0.0279 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0279 | N/A | ||||
Breaker N | BJ Services | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0044 | N/A | |
FRP-1 | BJ Services | Friction Reducer | Ammonium sulfate | 7783-20-2 | 100 | 0.1021 | N/A | |
Non-hazardous | Not Available | 100 | 0.1021 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-06-16 | 2017-06-27 | Recycled Fracturing Water (treated at well site) | 658 |
2017-06-22 | 2017-06-23 | Recycled Fracturing Water (treated at well site) | 65 |
2017-06-16 | 2017-06-27 | Groundwater - Saline | 148 |
2017-06-07 | 2017-06-21 | Recycled Fracturing Water (treated at well site) | 777 |
2017-06-07 | 2017-06-27 | Recycled Fracturing Water (treated at independent stand-alone facility) | 228 |
2017-06-23 | 2017-06-25 | Recycled Fracturing Water (treated at well site) | 106 |
2017-06-16 | 2017-06-17 | Recycled Fracturing Water (treated at well site) | 43 |
2017-08-14 | 2017-08-14 | Recycled Fracturing Water (treated at well site) | 10 |
2017-08-09 | 2017-08-19 | Recycled Fracturing Water (treated at well site) | 175 |
2017-06-16 | 2017-06-28 | Surface Water - Runoff | 9841 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 2830 | 0.0 | 0.0 | 0.0 |
2018 | 8651 | 0.0 | 0.0 | 0.0 |
2019 | 8640 | 0.0 | 0.0 | 0.0 |
2020 | 2164 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-02-22 | Kick | 2512.00 | 4711.00 |
2017-06-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]