X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776132813020

Well Details

Well ID: 0776132813020
Loading map...
Location: 02/13-28-077-13W6/0
Location Alias: 02/13-28-77-13 W6M
Location Alias 2: 02/13-28-077-13 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 13
Section: 28
County/Municipality: Saddle Hills County
Well Name: BIR 4-26 HZ 102 PCOUPES 13-28-77-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0481621
License Date: 2016-11-25
License Status: Issued
Spud Date: 2017-02-14
Final Drill Date: 2017-03-05
Well Total Depth: 5744.00 m
Surface Hole Latitude: 55.696074
Surface Hole Longitude: -119.912176

For data sources see[1][2]

Well History

Date Event
2015-03-05 Well Log Performed
2016-11-25 Obtained License
2017-02-15 Surface Casing Operation Performed
2017-02-17 Direction Drilling Operation Performed - Deviate
2017-02-22 Kick Occurred
2017-02-24 Direction Drilling Operation Performed - Horizontal
2017-03-05 Finished Drilling
2017-03-05 Well Log Performed
2017-03-05 Well Mode changed to Drilled and Cased
2017-03-08 Production Casing Operation Performed
2017-03-12 Rig Released
2017-06-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-21 Perforation Treatment Performed - Open-Hole Completion
2017-06-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-01 Well Fluid changed to Gas
2017-08-01 Well Mode changed to Testing
2017-08-25 Well Began Production
2017-08-25 Well Fluid changed to Gas
2017-08-25 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-02-14 Trinidad Drilling Ltd. 449 N/A Drill To LD
2017-03-14 Trinidad Drilling Ltd. 449 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-02-17 961.90 Deviate (5 - 79 degrees)
2017-02-24 2671.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-06-21 Open Hole/Barefoot Completion 5739.00 5744.00 0
2017-06-22 Multi-Stage Fracture 4885.10 4886.00 0
2017-06-22 Multi-Stage Fracture 4769.30 4770.20 0
2017-06-22 Multi-Stage Fracture 4653.60 4654.50 0
2017-06-22 Multi-Stage Fracture 4550.60 4551.50 0
2017-06-22 Multi-Stage Fracture 4437.90 4438.80 0
2017-06-22 Multi-Stage Fracture 4319.30 4320.20 0
2017-06-22 Multi-Stage Fracture 4217.20 4218.10 0
2017-06-22 Multi-Stage Fracture 4101.50 4102.40 0
2017-06-22 Multi-Stage Fracture 3985.80 3986.70 0
2017-06-22 Multi-Stage Fracture 3883.00 3883.90 0
2017-06-21 Multi-Stage Fracture 5727.70 5729.00 0
2017-06-22 Multi-Stage Fracture 3767.60 3768.50 0
2017-06-22 Multi-Stage Fracture 3651.80 3652.70 0
2017-06-22 Multi-Stage Fracture 3548.60 3549.50 0
2017-06-22 Multi-Stage Fracture 3433.70 3434.60 0
2017-06-23 Multi-Stage Fracture 3317.90 3318.80 0
2017-06-23 Multi-Stage Fracture 3215.00 3215.90 0
2017-06-23 Multi-Stage Fracture 3099.20 3100.10 0
2017-06-23 Multi-Stage Fracture 2984.20 2985.10 0
2017-06-23 Multi-Stage Fracture 2869.60 2870.50 0
2017-06-23 Multi-Stage Fracture 2766.50 2767.40 0
2017-06-21 Multi-Stage Fracture 5657.20 5658.10 0
2017-06-23 Multi-Stage Fracture 2688.60 2689.50 0
2017-06-21 Multi-Stage Fracture 5554.10 5555.00 0
2017-06-22 Multi-Stage Fracture 5438.40 5439.30 0
2017-06-22 Multi-Stage Fracture 5322.60 5323.50 0
2017-06-22 Multi-Stage Fracture 5219.50 5220.40 0
2017-06-22 Multi-Stage Fracture 5103.80 5104.70 0
2017-06-22 Multi-Stage Fracture 4988.20 4989.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-21 2017-06-23 2,406 11,966 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 84.1331 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 9.3029 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 6.4089 N/A
2K7 Solution W-M BJ Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0279 N/A
Methanol 67-56-1 100 0.0279 N/A
Water 7732-18-5 100 0.0279 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0044 N/A
FRP-1 BJ Services Friction Reducer Ammonium sulfate 7783-20-2 100 0.1021 N/A
Non-hazardous Not Available 100 0.1021 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-06-16 2017-06-27 Recycled Fracturing Water (treated at well site) 658
2017-06-22 2017-06-23 Recycled Fracturing Water (treated at well site) 65
2017-06-16 2017-06-27 Groundwater - Saline 148
2017-06-07 2017-06-21 Recycled Fracturing Water (treated at well site) 777
2017-06-07 2017-06-27 Recycled Fracturing Water (treated at independent stand-alone facility) 228
2017-06-23 2017-06-25 Recycled Fracturing Water (treated at well site) 106
2017-06-16 2017-06-17 Recycled Fracturing Water (treated at well site) 43
2017-08-14 2017-08-14 Recycled Fracturing Water (treated at well site) 10
2017-08-09 2017-08-19 Recycled Fracturing Water (treated at well site) 175
2017-06-16 2017-06-28 Surface Water - Runoff 9841

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2830 0.0 0.0 0.0
2018 8651 0.0 0.0 0.0
2019 8640 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-22 Kick 2512.00 4711.00
2017-06-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References