If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776132308020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.696074,"lon":-119.911794,"icon":""}]} |
Location: 02/08-23-077-13W6/0 | |
Location Alias: 02/08-23-77-13 W6M | |
Location Alias 2: 02/08-23-077-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 13 | |
Section: 23 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 4-26 HZ 102 PCOUPES 8-23-77-13 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0481634 | |
License Date: 2016-11-25 | |
License Status: Issued | |
Spud Date: 2017-05-09 | |
Final Drill Date: 2017-05-21 | |
Well Total Depth: 4197.00 m | |
Surface Hole Latitude: 55.696074 | |
Surface Hole Longitude: -119.911794 |
Date | Event |
---|---|
2016-11-25 | Obtained License |
2017-05-11 | Surface Casing Operation Performed |
2017-05-12 | Direction Drilling Operation Performed - Deviate |
2017-05-18 | Direction Drilling Operation Performed - Horizontal |
2017-05-21 | Finished Drilling |
2017-05-21 | Well Log Performed |
2017-05-21 | Well Mode changed to Drilled and Cased |
2017-05-22 | Production Casing Operation Performed |
2017-05-22 | Well Log Performed |
2017-05-23 | Rig Released |
2017-06-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-24 | Perforation Treatment Performed - Open-Hole Completion |
2017-06-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-02 | Well Fluid changed to Gas |
2017-08-02 | Well Mode changed to Testing |
2017-08-26 | Well Began Production |
2017-08-26 | Well Fluid changed to Gas |
2017-08-26 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-05-09 | Trinidad Drilling Ltd. | 449 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-05-12 | 665.50 | Deviate (5 - 79 degrees) |
2017-05-18 | 2534.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-06-24 | Open Hole/Barefoot Completion | 4185.00 | 4197.00 | 0 |
2017-06-24 | Multi-Stage Fracture | 3760.00 | 3760.80 | 0 |
2017-06-24 | Multi-Stage Fracture | 3707.40 | 3708.20 | 0 |
2017-06-24 | Multi-Stage Fracture | 3654.70 | 3655.50 | 0 |
2017-06-24 | Multi-Stage Fracture | 3602.10 | 3602.90 | 0 |
2017-06-24 | Multi-Stage Fracture | 3549.50 | 3550.30 | 0 |
2017-06-24 | Multi-Stage Fracture | 3497.00 | 3497.80 | 0 |
2017-06-24 | Multi-Stage Fracture | 3444.40 | 3445.20 | 0 |
2017-06-24 | Multi-Stage Fracture | 3391.70 | 3392.50 | 0 |
2017-06-25 | Multi-Stage Fracture | 3339.10 | 3339.90 | 0 |
2017-06-25 | Multi-Stage Fracture | 3286.60 | 3287.40 | 0 |
2017-06-24 | Multi-Stage Fracture | 4173.70 | 4175.00 | 0 |
2017-06-25 | Multi-Stage Fracture | 3233.90 | 3234.70 | 0 |
2017-06-25 | Multi-Stage Fracture | 3181.30 | 3182.10 | 0 |
2017-06-25 | Multi-Stage Fracture | 3128.80 | 3129.60 | 0 |
2017-06-25 | Multi-Stage Fracture | 3076.20 | 3077.00 | 0 |
2017-06-25 | Multi-Stage Fracture | 3023.60 | 3024.40 | 0 |
2017-06-25 | Multi-Stage Fracture | 2971.10 | 2971.90 | 0 |
2017-06-25 | Multi-Stage Fracture | 2918.60 | 2919.40 | 0 |
2017-06-25 | Multi-Stage Fracture | 2865.90 | 2866.70 | 0 |
2017-06-25 | Multi-Stage Fracture | 2813.30 | 2814.10 | 0 |
2017-06-25 | Multi-Stage Fracture | 2760.70 | 2761.50 | 0 |
2017-06-24 | Multi-Stage Fracture | 4128.10 | 4128.90 | 0 |
2017-06-25 | Multi-Stage Fracture | 2708.20 | 2709.00 | 0 |
2017-06-25 | Multi-Stage Fracture | 2656.00 | 2656.80 | 0 |
2017-06-25 | Multi-Stage Fracture | 2603.60 | 2604.40 | 0 |
2017-06-25 | Multi-Stage Fracture | 2563.50 | 2564.30 | 0 |
2017-06-24 | Multi-Stage Fracture | 4075.50 | 4076.30 | 0 |
2017-06-24 | Multi-Stage Fracture | 4022.90 | 4023.70 | 0 |
2017-06-24 | Multi-Stage Fracture | 3970.30 | 3971.10 | 0 |
2017-06-24 | Multi-Stage Fracture | 3917.70 | 3918.50 | 0 |
2017-06-24 | Multi-Stage Fracture | 3865.20 | 3866.00 | 0 |
2017-06-24 | Multi-Stage Fracture | 3812.60 | 3813.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-06-24 | 2017-06-25 | 2,405 | 10,168 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 86.0904 | N/A | |||
FRAC SAND. 30/50 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 9.6173 | N/A | ||
FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 4.1348 | N/A | ||
2K7 Solution W-M | BJ Services | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0283 | N/A | |
Methanol | 67-56-1 | 100 | 0.0283 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0283 | N/A | ||||
Breaker N | BJ Services | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0042 | N/A | |
FRP-1 | BJ Services | Friction Reducer | Ammonium sulfate | 7783-20-2 | 100 | 0.1039 | N/A | |
Non-hazardous | Not Available | 100 | 0.1039 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-06-16 | 2017-06-27 | Recycled Fracturing Water (treated at well site) | 560 |
2017-06-22 | 2017-06-23 | Recycled Fracturing Water (treated at well site) | 55 |
2017-06-16 | 2017-06-27 | Groundwater - Saline | 125 |
2017-06-07 | 2017-06-21 | Recycled Fracturing Water (treated at well site) | 660 |
2017-06-07 | 2017-06-27 | Recycled Fracturing Water (treated at independent stand-alone facility) | 194 |
2017-06-23 | 2017-06-25 | Recycled Fracturing Water (treated at well site) | 90 |
2017-06-16 | 2017-06-17 | Recycled Fracturing Water (treated at well site) | 37 |
2017-08-14 | 2017-08-14 | Recycled Fracturing Water (treated at well site) | 9 |
2017-08-09 | 2017-08-19 | Recycled Fracturing Water (treated at well site) | 149 |
2017-06-16 | 2017-06-28 | Surface Water - Runoff | 8362 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 2792 | 0.0 | 0.0 | 0.0 |
2018 | 8669 | 0.0 | 0.0 | 0.0 |
2019 | 8632 | 0.0 | 0.0 | 0.0 |
2020 | 2173 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-05-23 | No Incident Encountered | 0.00 | 0.00 |
2017-06-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]