X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776132308020

Well Details

Well ID: 0776132308020
Loading map...
Location: 02/08-23-077-13W6/0
Location Alias: 02/08-23-77-13 W6M
Location Alias 2: 02/08-23-077-13 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 13
Section: 23
County/Municipality: Saddle Hills County
Well Name: BIR 4-26 HZ 102 PCOUPES 8-23-77-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0481634
License Date: 2016-11-25
License Status: Issued
Spud Date: 2017-05-09
Final Drill Date: 2017-05-21
Well Total Depth: 4197.00 m
Surface Hole Latitude: 55.696074
Surface Hole Longitude: -119.911794

For data sources see[1][2]

Well History

Date Event
2016-11-25 Obtained License
2017-05-11 Surface Casing Operation Performed
2017-05-12 Direction Drilling Operation Performed - Deviate
2017-05-18 Direction Drilling Operation Performed - Horizontal
2017-05-21 Finished Drilling
2017-05-21 Well Log Performed
2017-05-21 Well Mode changed to Drilled and Cased
2017-05-22 Production Casing Operation Performed
2017-05-22 Well Log Performed
2017-05-23 Rig Released
2017-06-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-24 Perforation Treatment Performed - Open-Hole Completion
2017-06-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-02 Well Fluid changed to Gas
2017-08-02 Well Mode changed to Testing
2017-08-26 Well Began Production
2017-08-26 Well Fluid changed to Gas
2017-08-26 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-05-09 Trinidad Drilling Ltd. 449 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-05-12 665.50 Deviate (5 - 79 degrees)
2017-05-18 2534.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-06-24 Open Hole/Barefoot Completion 4185.00 4197.00 0
2017-06-24 Multi-Stage Fracture 3760.00 3760.80 0
2017-06-24 Multi-Stage Fracture 3707.40 3708.20 0
2017-06-24 Multi-Stage Fracture 3654.70 3655.50 0
2017-06-24 Multi-Stage Fracture 3602.10 3602.90 0
2017-06-24 Multi-Stage Fracture 3549.50 3550.30 0
2017-06-24 Multi-Stage Fracture 3497.00 3497.80 0
2017-06-24 Multi-Stage Fracture 3444.40 3445.20 0
2017-06-24 Multi-Stage Fracture 3391.70 3392.50 0
2017-06-25 Multi-Stage Fracture 3339.10 3339.90 0
2017-06-25 Multi-Stage Fracture 3286.60 3287.40 0
2017-06-24 Multi-Stage Fracture 4173.70 4175.00 0
2017-06-25 Multi-Stage Fracture 3233.90 3234.70 0
2017-06-25 Multi-Stage Fracture 3181.30 3182.10 0
2017-06-25 Multi-Stage Fracture 3128.80 3129.60 0
2017-06-25 Multi-Stage Fracture 3076.20 3077.00 0
2017-06-25 Multi-Stage Fracture 3023.60 3024.40 0
2017-06-25 Multi-Stage Fracture 2971.10 2971.90 0
2017-06-25 Multi-Stage Fracture 2918.60 2919.40 0
2017-06-25 Multi-Stage Fracture 2865.90 2866.70 0
2017-06-25 Multi-Stage Fracture 2813.30 2814.10 0
2017-06-25 Multi-Stage Fracture 2760.70 2761.50 0
2017-06-24 Multi-Stage Fracture 4128.10 4128.90 0
2017-06-25 Multi-Stage Fracture 2708.20 2709.00 0
2017-06-25 Multi-Stage Fracture 2656.00 2656.80 0
2017-06-25 Multi-Stage Fracture 2603.60 2604.40 0
2017-06-25 Multi-Stage Fracture 2563.50 2564.30 0
2017-06-24 Multi-Stage Fracture 4075.50 4076.30 0
2017-06-24 Multi-Stage Fracture 4022.90 4023.70 0
2017-06-24 Multi-Stage Fracture 3970.30 3971.10 0
2017-06-24 Multi-Stage Fracture 3917.70 3918.50 0
2017-06-24 Multi-Stage Fracture 3865.20 3866.00 0
2017-06-24 Multi-Stage Fracture 3812.60 3813.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-24 2017-06-25 2,405 10,168 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 86.0904 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 9.6173 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 4.1348 N/A
2K7 Solution W-M BJ Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0283 N/A
Methanol 67-56-1 100 0.0283 N/A
Water 7732-18-5 100 0.0283 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0042 N/A
FRP-1 BJ Services Friction Reducer Ammonium sulfate 7783-20-2 100 0.1039 N/A
Non-hazardous Not Available 100 0.1039 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-06-16 2017-06-27 Recycled Fracturing Water (treated at well site) 560
2017-06-22 2017-06-23 Recycled Fracturing Water (treated at well site) 55
2017-06-16 2017-06-27 Groundwater - Saline 125
2017-06-07 2017-06-21 Recycled Fracturing Water (treated at well site) 660
2017-06-07 2017-06-27 Recycled Fracturing Water (treated at independent stand-alone facility) 194
2017-06-23 2017-06-25 Recycled Fracturing Water (treated at well site) 90
2017-06-16 2017-06-17 Recycled Fracturing Water (treated at well site) 37
2017-08-14 2017-08-14 Recycled Fracturing Water (treated at well site) 9
2017-08-09 2017-08-19 Recycled Fracturing Water (treated at well site) 149
2017-06-16 2017-06-28 Surface Water - Runoff 8362

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2792 0.0 0.0 0.0
2018 8669 0.0 0.0 0.0
2019 8632 0.0 0.0 0.0
2020 2173 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-05-23 No Incident Encountered 0.00 0.00
2017-06-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References