If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776131915000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.677059,"lon":-119.971639,"icon":""}]} |
Location: 00/15-19-077-13W6/0 | |
Location Alias: 00/15-19-77-13 W6M | |
Location Alias 2: 00/15-19-077-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 13 | |
Section: 19 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 16-17 HZ PCOUPES 15-19-77-13 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0478597 | |
License Date: 2015-12-21 | |
License Status: Amended | |
Spud Date: 2017-03-29 | |
Final Drill Date: 2017-04-13 | |
Well Total Depth: 4920.00 m | |
Surface Hole Latitude: 55.677059 | |
Surface Hole Longitude: -119.971639 |
Date | Event |
---|---|
2015-12-21 | Obtained License |
2017-03-31 | Surface Casing Operation Performed |
2017-04-01 | Direction Drilling Operation Performed - Deviate |
2017-04-07 | Direction Drilling Operation Performed - Horizontal |
2017-04-07 | Well Log Performed |
2017-04-08 | Kick Occurred |
2017-04-11 | Kick Occurred |
2017-04-13 | Finished Drilling |
2017-04-13 | Well Log Performed |
2017-04-13 | Well Mode changed to Drilled and Cased |
2017-04-14 | Kick Occurred |
2017-04-15 | Production Casing Operation Performed |
2017-04-16 | Rig Released |
2017-05-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-05-27 | Perforation Treatment Performed - Open-Hole Completion |
2017-05-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-05-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-01 | Well Fluid changed to Gas |
2017-06-01 | Well Mode changed to Testing |
2017-06-03 | Well Began Production |
2017-06-03 | Well Fluid changed to Gas |
2017-06-03 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-03-29 | Ensign Drilling Inc. | 555 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-04-01 | 1233.00 | Deviate (5 - 79 degrees) |
2017-04-07 | 2636.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-05-27 | Open Hole/Barefoot Completion | 4917.00 | 4920.00 | 0 |
2017-05-28 | Multi-Stage Fracture | 3965.80 | 3966.70 | 0 |
2017-05-28 | Multi-Stage Fracture | 3850.00 | 3850.90 | 0 |
2017-05-28 | Multi-Stage Fracture | 3721.60 | 3722.50 | 0 |
2017-05-28 | Multi-Stage Fracture | 3593.10 | 3594.00 | 0 |
2017-05-28 | Multi-Stage Fracture | 3477.30 | 3478.20 | 0 |
2017-05-28 | Multi-Stage Fracture | 3350.20 | 3351.10 | 0 |
2017-05-29 | Multi-Stage Fracture | 3221.90 | 3222.80 | 0 |
2017-05-29 | Multi-Stage Fracture | 3106.60 | 3107.50 | 0 |
2017-05-29 | Multi-Stage Fracture | 2978.10 | 2979.00 | 0 |
2017-05-29 | Multi-Stage Fracture | 2863.70 | 2864.60 | 0 |
2017-05-27 | Multi-Stage Fracture | 4905.60 | 4906.90 | 0 |
2017-05-29 | Multi-Stage Fracture | 2736.50 | 2737.40 | 0 |
2017-05-29 | Multi-Stage Fracture | 2658.70 | 2659.60 | 0 |
2017-05-27 | Multi-Stage Fracture | 4834.80 | 4835.70 | 0 |
2017-05-27 | Multi-Stage Fracture | 4708.50 | 4709.40 | 0 |
2017-05-27 | Multi-Stage Fracture | 4580.80 | 4581.70 | 0 |
2017-05-28 | Multi-Stage Fracture | 4465.00 | 4465.90 | 0 |
2017-05-28 | Multi-Stage Fracture | 4336.50 | 4337.40 | 0 |
2017-05-28 | Multi-Stage Fracture | 4208.10 | 4209.00 | 0 |
2017-05-28 | Multi-Stage Fracture | 4093.60 | 4094.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-05-27 | 2017-05-29 | 2,437 | 10,354 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 88.0085 | N/A | |||
FRAC SAND. 30/50 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 7.1521 | N/A | ||
FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 5.0275 | N/A | ||
2K7 Solution W-M | BJ Services | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0303 | N/A | |
Methanol | 67-56-1 | 100 | 0.0302 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0302 | N/A | ||||
Breaker N | BJ Services | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0046 | N/A | |
FRP-1 | BJ Services | Friction Reducer | Ammonium sulfate | 7783-20-2 | 100 | 0.1119 | N/A | |
Non-hazardous | Not Available | 100 | 0.1119 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-05-21 | 2017-05-31 | Surface Water - Runoff | 8184 |
2017-05-21 | 2017-05-30 | Groundwater - Saline | 195 |
2017-05-23 | 2017-05-31 | Recycled Fracturing Water (treated at independent stand-alone facility) | 159 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 80 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 61 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 65 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 73 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 92 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 90 |
2017-05-21 | 2017-05-31 | Recycled Fracturing Water (treated at well site) | 55 |
2017-05-21 | 2017-05-31 | Recycled Fracturing Water (treated at well site) | 74 |
2017-05-21 | 2017-05-31 | Recycled Fracturing Water (treated at well site) | 81 |
2017-05-21 | 2017-05-31 | Recycled Fracturing Water (treated at well site) | 64 |
2017-02-26 | 2017-03-02 | Recycled Fracturing Water (treated at well site) | 185 |
2017-02-26 | 2017-03-02 | Recycled Fracturing Water (treated at well site) | 195 |
2017-02-26 | 2017-02-26 | Recycled Fracturing Water (treated at well site) | 11 |
2017-05-26 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 26 |
2017-05-26 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 32 |
2017-05-26 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 33 |
2017-05-20 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 505 |
2017-05-24 | 2017-05-24 | Surface Water - Runoff | 86 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 4499 | 0.0 | 0.0 | 0.0 |
2018 | 8574 | 0.0 | 0.0 | 0.0 |
2019 | 8647 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-04-08 | Kick | 2683.00 | 2683.00 |
2017-04-11 | Kick | 3375.00 | 3375.00 |
2017-04-14 | Kick | 4485.00 | 4485.00 |
2017-05-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]