If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776131910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.676981,"lon":-119.97156,"icon":""}]} |
Location: 00/10-19-077-13W6/0 | |
Location Alias: 00/10-19-77-13 W6M | |
Location Alias 2: 00/10-19-077-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 13 | |
Section: 19 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 16-17 HZ PCOUPES 10-19-77-13 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0478566 | |
License Date: 2015-12-18 | |
License Status: Amended | |
Spud Date: 2017-03-13 | |
Final Drill Date: 2017-03-25 | |
Well Total Depth: 4645.00 m | |
Surface Hole Latitude: 55.676981 | |
Surface Hole Longitude: -119.971560 |
Date | Event |
---|---|
2015-12-18 | Obtained License |
2017-03-09 | Well Log Performed |
2017-03-15 | Direction Drilling Operation Performed - Deviate |
2017-03-15 | Surface Casing Operation Performed |
2017-03-20 | Direction Drilling Operation Performed - Horizontal |
2017-03-21 | Well Log Performed |
2017-03-25 | Finished Drilling |
2017-03-25 | Well Log Performed |
2017-03-25 | Well Mode changed to Drilled and Cased |
2017-03-26 | Well Log Performed |
2017-03-27 | Production Casing Operation Performed |
2017-03-28 | Rig Released |
2017-05-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-05-29 | Perforation Treatment Performed - Open-Hole Completion |
2017-05-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-05-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-01 | Well Fluid changed to Gas |
2017-06-01 | Well Mode changed to Testing |
2017-06-03 | Well Began Production |
2017-06-03 | Well Fluid changed to Gas |
2017-06-03 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-03-13 | Ensign Drilling Inc. | 555 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-03-15 | 776.00 | Deviate (5 - 79 degrees) |
2017-03-20 | 2578.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-05-29 | Open Hole/Barefoot Completion | 4641.00 | 4645.00 | 0 |
2017-05-30 | Multi-Stage Fracture | 4215.20 | 4216.10 | 0 |
2017-05-30 | Multi-Stage Fracture | 4150.00 | 4150.90 | 0 |
2017-05-30 | Multi-Stage Fracture | 4097.40 | 4098.30 | 0 |
2017-05-30 | Multi-Stage Fracture | 4045.00 | 4045.90 | 0 |
2017-05-30 | Multi-Stage Fracture | 3992.30 | 3993.20 | 0 |
2017-05-30 | Multi-Stage Fracture | 3939.60 | 3940.50 | 0 |
2017-05-30 | Multi-Stage Fracture | 3887.00 | 3887.90 | 0 |
2017-05-30 | Multi-Stage Fracture | 3834.40 | 3835.30 | 0 |
2017-05-31 | Multi-Stage Fracture | 3769.20 | 3770.10 | 0 |
2017-05-31 | Multi-Stage Fracture | 3716.80 | 3717.70 | 0 |
2017-05-29 | Multi-Stage Fracture | 4629.60 | 4631.90 | 0 |
2017-05-31 | Multi-Stage Fracture | 3664.10 | 3665.00 | 0 |
2017-05-31 | Multi-Stage Fracture | 3611.50 | 3612.40 | 0 |
2017-05-31 | Multi-Stage Fracture | 3559.00 | 3559.90 | 0 |
2017-05-31 | Multi-Stage Fracture | 3506.40 | 3507.30 | 0 |
2017-05-31 | Multi-Stage Fracture | 3453.80 | 3454.70 | 0 |
2017-05-31 | Multi-Stage Fracture | 3401.20 | 3402.10 | 0 |
2017-05-31 | Multi-Stage Fracture | 3348.50 | 3349.40 | 0 |
2017-05-31 | Multi-Stage Fracture | 3283.20 | 3284.10 | 0 |
2017-05-31 | Multi-Stage Fracture | 3230.50 | 3231.40 | 0 |
2017-05-31 | Multi-Stage Fracture | 3177.90 | 3178.80 | 0 |
2017-05-29 | Multi-Stage Fracture | 4583.90 | 4584.80 | 0 |
2017-05-31 | Multi-Stage Fracture | 3125.20 | 3126.10 | 0 |
2017-05-31 | Multi-Stage Fracture | 3073.30 | 3074.20 | 0 |
2017-05-31 | Multi-Stage Fracture | 3020.70 | 3021.60 | 0 |
2017-05-31 | Multi-Stage Fracture | 2968.80 | 2969.70 | 0 |
2017-05-31 | Multi-Stage Fracture | 2916.30 | 2917.20 | 0 |
2017-05-31 | Multi-Stage Fracture | 2851.00 | 2851.90 | 0 |
2017-05-31 | Multi-Stage Fracture | 2798.30 | 2799.20 | 0 |
2017-05-31 | Multi-Stage Fracture | 2745.70 | 2746.60 | 0 |
2017-05-31 | Multi-Stage Fracture | 2693.00 | 2693.90 | 0 |
2017-05-31 | Multi-Stage Fracture | 2640.30 | 2641.20 | 0 |
2017-05-29 | Multi-Stage Fracture | 4531.20 | 4532.10 | 0 |
2017-05-31 | Multi-Stage Fracture | 2600.30 | 2601.20 | 0 |
2017-05-30 | Multi-Stage Fracture | 4478.60 | 4479.50 | 0 |
2017-05-30 | Multi-Stage Fracture | 4426.00 | 4426.90 | 0 |
2017-05-30 | Multi-Stage Fracture | 4373.30 | 4374.20 | 0 |
2017-05-30 | Multi-Stage Fracture | 4320.60 | 4321.50 | 0 |
2017-05-30 | Multi-Stage Fracture | 4267.90 | 4268.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-05-29 | 2017-05-31 | 2,445 | 13,728 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 87.9083 | N/A | |||
FRAC SAND. 30/50 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 9.3803 | N/A | ||
FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 3.7252 | N/A | ||
2K7 Solution W-M | BJ Services | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0386 | N/A | |
Methanol | 67-56-1 | 100 | 0.0386 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0386 | N/A | ||||
Breaker N | BJ Services | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0041 | N/A | |
FRP-1 | BJ Services | Friction Reducer | Ammonium sulfate | 7783-20-2 | 100 | 0.0892 | N/A | |
Non-hazardous | Not Available | 100 | 0.0892 | N/A | ||||
MaxPerm-20A | BJ Services | Friction Reducer | Non-hazardous | 9014 | 100 | 0.0387 | N/A | |
Oxyalkylated alcohol | 9014 | 100 | 0.0387 | N/A | ||||
Petroleum distillates | 64742-47-8 | 100 | 0.0387 | N/A | ||||
Polyacrylate | 9014 | 100 | 0.0387 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-05-21 | 2017-05-31 | Surface Water - Runoff | 10850 |
2017-05-21 | 2017-05-30 | Groundwater - Saline | 258 |
2017-05-23 | 2017-05-31 | Recycled Fracturing Water (treated at independent stand-alone facility) | 211 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 106 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 81 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 86 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 96 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 122 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 120 |
2017-05-21 | 2017-05-31 | Recycled Fracturing Water (treated at well site) | 72 |
2017-05-21 | 2017-05-31 | Recycled Fracturing Water (treated at well site) | 98 |
2017-05-21 | 2017-05-31 | Recycled Fracturing Water (treated at well site) | 108 |
2017-05-21 | 2017-05-31 | Recycled Fracturing Water (treated at well site) | 85 |
2017-02-26 | 2017-03-02 | Recycled Fracturing Water (treated at well site) | 246 |
2017-02-26 | 2017-03-02 | Recycled Fracturing Water (treated at well site) | 258 |
2017-02-26 | 2017-02-26 | Recycled Fracturing Water (treated at well site) | 15 |
2017-05-26 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 34 |
2017-05-26 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 42 |
2017-05-26 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 44 |
2017-05-20 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 669 |
2017-05-24 | 2017-05-24 | Surface Water - Runoff | 114 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 4354 | 0.0 | 0.0 | 0.0 |
2018 | 8579 | 0.0 | 0.0 | 0.0 |
2019 | 8636 | 0.0 | 0.0 | 0.0 |
2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-03-28 | No Incident Encountered | 0.00 | 0.00 |
2017-05-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]