X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776131910000

Well Details

Well ID: 0776131910000
Loading map...
Location: 00/10-19-077-13W6/0
Location Alias: 00/10-19-77-13 W6M
Location Alias 2: 00/10-19-077-13 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 13
Section: 19
County/Municipality: Saddle Hills County
Well Name: BIR 16-17 HZ PCOUPES 10-19-77-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0478566
License Date: 2015-12-18
License Status: Amended
Spud Date: 2017-03-13
Final Drill Date: 2017-03-25
Well Total Depth: 4645.00 m
Surface Hole Latitude: 55.676981
Surface Hole Longitude: -119.971560

For data sources see[1][2]

Well History

Date Event
2015-12-18 Obtained License
2017-03-09 Well Log Performed
2017-03-15 Direction Drilling Operation Performed - Deviate
2017-03-15 Surface Casing Operation Performed
2017-03-20 Direction Drilling Operation Performed - Horizontal
2017-03-21 Well Log Performed
2017-03-25 Finished Drilling
2017-03-25 Well Log Performed
2017-03-25 Well Mode changed to Drilled and Cased
2017-03-26 Well Log Performed
2017-03-27 Production Casing Operation Performed
2017-03-28 Rig Released
2017-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-29 Perforation Treatment Performed - Open-Hole Completion
2017-05-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-31 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-01 Well Fluid changed to Gas
2017-06-01 Well Mode changed to Testing
2017-06-03 Well Began Production
2017-06-03 Well Fluid changed to Gas
2017-06-03 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-03-13 Ensign Drilling Inc. 555 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-03-15 776.00 Deviate (5 - 79 degrees)
2017-03-20 2578.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-05-29 Open Hole/Barefoot Completion 4641.00 4645.00 0
2017-05-30 Multi-Stage Fracture 4215.20 4216.10 0
2017-05-30 Multi-Stage Fracture 4150.00 4150.90 0
2017-05-30 Multi-Stage Fracture 4097.40 4098.30 0
2017-05-30 Multi-Stage Fracture 4045.00 4045.90 0
2017-05-30 Multi-Stage Fracture 3992.30 3993.20 0
2017-05-30 Multi-Stage Fracture 3939.60 3940.50 0
2017-05-30 Multi-Stage Fracture 3887.00 3887.90 0
2017-05-30 Multi-Stage Fracture 3834.40 3835.30 0
2017-05-31 Multi-Stage Fracture 3769.20 3770.10 0
2017-05-31 Multi-Stage Fracture 3716.80 3717.70 0
2017-05-29 Multi-Stage Fracture 4629.60 4631.90 0
2017-05-31 Multi-Stage Fracture 3664.10 3665.00 0
2017-05-31 Multi-Stage Fracture 3611.50 3612.40 0
2017-05-31 Multi-Stage Fracture 3559.00 3559.90 0
2017-05-31 Multi-Stage Fracture 3506.40 3507.30 0
2017-05-31 Multi-Stage Fracture 3453.80 3454.70 0
2017-05-31 Multi-Stage Fracture 3401.20 3402.10 0
2017-05-31 Multi-Stage Fracture 3348.50 3349.40 0
2017-05-31 Multi-Stage Fracture 3283.20 3284.10 0
2017-05-31 Multi-Stage Fracture 3230.50 3231.40 0
2017-05-31 Multi-Stage Fracture 3177.90 3178.80 0
2017-05-29 Multi-Stage Fracture 4583.90 4584.80 0
2017-05-31 Multi-Stage Fracture 3125.20 3126.10 0
2017-05-31 Multi-Stage Fracture 3073.30 3074.20 0
2017-05-31 Multi-Stage Fracture 3020.70 3021.60 0
2017-05-31 Multi-Stage Fracture 2968.80 2969.70 0
2017-05-31 Multi-Stage Fracture 2916.30 2917.20 0
2017-05-31 Multi-Stage Fracture 2851.00 2851.90 0
2017-05-31 Multi-Stage Fracture 2798.30 2799.20 0
2017-05-31 Multi-Stage Fracture 2745.70 2746.60 0
2017-05-31 Multi-Stage Fracture 2693.00 2693.90 0
2017-05-31 Multi-Stage Fracture 2640.30 2641.20 0
2017-05-29 Multi-Stage Fracture 4531.20 4532.10 0
2017-05-31 Multi-Stage Fracture 2600.30 2601.20 0
2017-05-30 Multi-Stage Fracture 4478.60 4479.50 0
2017-05-30 Multi-Stage Fracture 4426.00 4426.90 0
2017-05-30 Multi-Stage Fracture 4373.30 4374.20 0
2017-05-30 Multi-Stage Fracture 4320.60 4321.50 0
2017-05-30 Multi-Stage Fracture 4267.90 4268.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-05-29 2017-05-31 2,445 13,728 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 87.9083 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 9.3803 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.7252 N/A
2K7 Solution W-M BJ Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0386 N/A
Methanol 67-56-1 100 0.0386 N/A
Water 7732-18-5 100 0.0386 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0041 N/A
FRP-1 BJ Services Friction Reducer Ammonium sulfate 7783-20-2 100 0.0892 N/A
Non-hazardous Not Available 100 0.0892 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.0387 N/A
Oxyalkylated alcohol 9014 100 0.0387 N/A
Petroleum distillates 64742-47-8 100 0.0387 N/A
Polyacrylate 9014 100 0.0387 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-05-21 2017-05-31 Surface Water - Runoff 10850
2017-05-21 2017-05-30 Groundwater - Saline 258
2017-05-23 2017-05-31 Recycled Fracturing Water (treated at independent stand-alone facility) 211
2017-05-21 2017-05-28 Recycled Fracturing Water (treated at well site) 106
2017-05-21 2017-05-28 Recycled Fracturing Water (treated at well site) 81
2017-05-21 2017-05-28 Recycled Fracturing Water (treated at well site) 86
2017-05-21 2017-05-28 Recycled Fracturing Water (treated at well site) 96
2017-05-21 2017-05-28 Recycled Fracturing Water (treated at well site) 122
2017-05-21 2017-05-28 Recycled Fracturing Water (treated at well site) 120
2017-05-21 2017-05-31 Recycled Fracturing Water (treated at well site) 72
2017-05-21 2017-05-31 Recycled Fracturing Water (treated at well site) 98
2017-05-21 2017-05-31 Recycled Fracturing Water (treated at well site) 108
2017-05-21 2017-05-31 Recycled Fracturing Water (treated at well site) 85
2017-02-26 2017-03-02 Recycled Fracturing Water (treated at well site) 246
2017-02-26 2017-03-02 Recycled Fracturing Water (treated at well site) 258
2017-02-26 2017-02-26 Recycled Fracturing Water (treated at well site) 15
2017-05-26 2017-05-28 Recycled Fracturing Water (treated at well site) 34
2017-05-26 2017-05-28 Recycled Fracturing Water (treated at well site) 42
2017-05-26 2017-05-28 Recycled Fracturing Water (treated at well site) 44
2017-05-20 2017-05-28 Recycled Fracturing Water (treated at well site) 669
2017-05-24 2017-05-24 Surface Water - Runoff 114

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 4354 0.0 0.0 0.0
2018 8579 0.0 0.0 0.0
2019 8636 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-28 No Incident Encountered 0.00 0.00
2017-05-31 No Incident Encountered 0.00 0.00

For data sources see[10]

References