X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776131403000

Well Details

Well ID: 0776131403000
Loading map...
Location: 00/03-14-077-13W6/0
Location Alias: 00/03-14-77-13 W6M
Location Alias 2: 00/03-14-077-13 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 13
Section: 14
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF HZ PCOUPES 3-14-77-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0441771
License Date: 2011-12-20
License Status: Issued
Spud Date: 2012-03-07
Final Drill Date: 2012-06-08
Well Total Depth: 5055.00 m
Surface Hole Latitude: 55.681329
Surface Hole Longitude: -119.937870

For data sources see[1][2]

Well History

Date Event
2011-12-20 Obtained License
2012-03-07 Surface Casing Operation Performed
2012-03-07 Well Mode changed to Preset
2012-05-20 Direction Drilling Operation Performed - Deviate
2012-05-29 Direction Drilling Operation Performed - Horizontal
2012-05-29 Well Log Performed
2012-06-08 Finished Drilling
2012-06-08 Well Log Performed
2012-06-08 Well Mode changed to Drilled and Cased
2012-06-10 Liner Casing Operation Performed
2012-06-10 Production Casing Operation Performed
2012-06-11 Rig Released
2012-08-21 Well Log Performed
2012-08-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-24 Perforation Treatment Performed - Open-Hole Completion
2012-08-31 Well Log Performed
2012-09-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-01 Well Fluid changed to Gas
2012-09-01 Well Mode changed to Testing
2012-10-27 Well Began Production
2012-10-27 Well Fluid changed to Gas
2012-10-27 Well Mode changed to Flowing
2017-07-01 Well Fluid changed to Gas
2017-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-07 Calmena Energy Services Operating Corp. 211 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-05-20 689.00 Deviate (5 - 79 degrees)
2012-05-29 2548.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-24 Open Hole/Barefoot Completion 5050.00 5055.00 0
2012-08-24 Multi-Stage Fracture 5042.70 5043.50 0
2012-09-01 Multi-Stage Fracture 3237.20 3238.00 0
2012-09-01 Multi-Stage Fracture 3098.00 3098.80 0
2012-09-01 Multi-Stage Fracture 2959.00 2959.80 0
2012-09-01 Multi-Stage Fracture 2820.00 2820.80 0
2012-09-01 Multi-Stage Fracture 2677.70 2678.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1683 0.0 0.0 0.0
2013 8688 0.0 0.0 0.0
2014 7635 0.0 0.0 0.0
2015 6068 0.0 0.0 0.0
2016 5806 0.0 0.0 0.0
2017 4487 0.0 0.0 0.0
2018 6276 0.0 0.0 0.0
2019 8234 0.0 0.0 0.0
2020 1968 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-08 No Incident Encountered 0.00 0.00
2012-06-11 No Incident Encountered 0.00 0.00
2012-10-17 No Incident Encountered 0.00 0.00

For data sources see[8]

References