X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776130909000

Well Details

Well ID: 0776130909000
Loading map...
Location: 00/09-09-077-13W6/0
Location Alias: 00/09-09-77-13 W6M
Location Alias 2: 00/09-09-077-13 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 13
Section: 09
County/Municipality: Saddle Hills County
Well Name: BIR 16-17 HZ PCOUPES 9-9-77-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0478601
License Date: 2015-12-21
License Status: Amended
Spud Date: 2017-02-07
Final Drill Date: 2017-02-19
Well Total Depth: 4770.00 m
Surface Hole Latitude: 55.676825
Surface Hole Longitude: -119.971399

For data sources see[1][2]

Well History

Date Event
2015-12-21 Obtained License
2017-02-09 Surface Casing Operation Performed
2017-02-10 Direction Drilling Operation Performed - Deviate
2017-02-14 Direction Drilling Operation Performed - Horizontal
2017-02-15 Well Log Performed
2017-02-19 Finished Drilling
2017-02-19 Well Log Performed
2017-02-19 Well Mode changed to Drilled and Cased
2017-02-21 Production Casing Operation Performed
2017-02-22 Rig Released
2017-05-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-21 Perforation Treatment Performed - Open-Hole Completion
2017-05-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-01 Well Fluid changed to Gas
2017-06-01 Well Mode changed to Testing
2017-06-03 Well Began Production
2017-06-03 Well Fluid changed to Gas
2017-06-03 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-02-07 Ensign Drilling Inc. 555 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-02-10 1327.50 Deviate (5 - 79 degrees)
2017-02-14 2442.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-05-21 Open Hole/Barefoot Completion 4767.00 4770.00 0
2017-05-22 Multi-Stage Fracture 4317.70 4318.50 0
2017-05-22 Multi-Stage Fracture 4265.10 4265.90 0
2017-05-22 Multi-Stage Fracture 4212.40 4213.20 0
2017-05-22 Multi-Stage Fracture 4159.80 4160.60 0
2017-05-22 Multi-Stage Fracture 4094.50 4095.30 0
2017-05-22 Multi-Stage Fracture 4041.90 4042.70 0
2017-05-22 Multi-Stage Fracture 3989.70 3990.50 0
2017-05-22 Multi-Stage Fracture 3937.00 3937.80 0
2017-05-22 Multi-Stage Fracture 3871.80 3872.60 0
2017-05-22 Multi-Stage Fracture 3819.20 3820.00 0
2017-05-21 Multi-Stage Fracture 4755.70 4757.00 0
2017-05-22 Multi-Stage Fracture 3766.50 3767.30 0
2017-05-22 Multi-Stage Fracture 3713.70 3714.50 0
2017-05-22 Multi-Stage Fracture 3648.50 3649.30 0
2017-05-22 Multi-Stage Fracture 3595.90 3596.70 0
2017-05-22 Multi-Stage Fracture 3543.60 3544.40 0
2017-05-22 Multi-Stage Fracture 3491.00 3491.80 0
2017-05-22 Multi-Stage Fracture 3425.80 3426.60 0
2017-05-22 Multi-Stage Fracture 3373.20 3374.00 0
2017-05-23 Multi-Stage Fracture 3320.60 3321.40 0
2017-05-23 Multi-Stage Fracture 3268.80 3269.60 0
2017-05-21 Multi-Stage Fracture 4710.00 4710.80 0
2017-05-23 Multi-Stage Fracture 3203.80 3204.60 0
2017-05-23 Multi-Stage Fracture 3151.20 3152.00 0
2017-05-23 Multi-Stage Fracture 3098.60 3099.40 0
2017-05-23 Multi-Stage Fracture 3033.40 3034.20 0
2017-05-23 Multi-Stage Fracture 2980.80 2981.60 0
2017-05-23 Multi-Stage Fracture 2928.20 2929.00 0
2017-05-23 Multi-Stage Fracture 2875.50 2876.30 0
2017-05-23 Multi-Stage Fracture 2822.90 2823.70 0
2017-05-23 Multi-Stage Fracture 2757.60 2758.40 0
2017-05-23 Multi-Stage Fracture 2705.00 2705.80 0
2017-05-21 Multi-Stage Fracture 4657.50 4658.30 0
2017-05-23 Multi-Stage Fracture 2652.40 2653.20 0
2017-05-23 Multi-Stage Fracture 2587.20 2588.00 0
2017-05-23 Multi-Stage Fracture 2534.50 2535.30 0
2017-05-23 Multi-Stage Fracture 2481.90 2482.70 0
2017-05-23 Multi-Stage Fracture 2442.00 2442.80 0
2017-05-21 Multi-Stage Fracture 4604.90 4605.70 0
2017-05-21 Multi-Stage Fracture 4552.30 4553.10 0
2017-05-21 Multi-Stage Fracture 4487.00 4487.80 0
2017-05-21 Multi-Stage Fracture 4434.40 4435.20 0
2017-05-21 Multi-Stage Fracture 4382.90 4383.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-05-21 2017-05-23 2,252 12,022 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 84.5401 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 10.7199 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 4.583 N/A
2K7 Solution W-M BJ Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0298 N/A
Methanol 67-56-1 100 0.0298 N/A
Water 7732-18-5 100 0.0298 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0038 N/A
FRP-1 BJ Services Friction Reducer Ammonium sulfate 7783-20-2 100 0.1025 N/A
Non-hazardous Not Available 100 0.1025 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-05-21 2017-05-31 Surface Water - Runoff 9501
2017-05-21 2017-05-30 Groundwater - Saline 226
2017-05-23 2017-05-31 Recycled Fracturing Water (treated at independent stand-alone facility) 185
2017-05-21 2017-05-28 Recycled Fracturing Water (treated at well site) 93
2017-05-21 2017-05-28 Recycled Fracturing Water (treated at well site) 71
2017-05-21 2017-05-28 Recycled Fracturing Water (treated at well site) 75
2017-05-21 2017-05-28 Recycled Fracturing Water (treated at well site) 84
2017-05-21 2017-05-28 Recycled Fracturing Water (treated at well site) 107
2017-05-21 2017-05-28 Recycled Fracturing Water (treated at well site) 105
2017-05-21 2017-05-31 Recycled Fracturing Water (treated at well site) 63
2017-05-21 2017-05-31 Recycled Fracturing Water (treated at well site) 86
2017-05-21 2017-05-31 Recycled Fracturing Water (treated at well site) 95
2017-05-21 2017-05-31 Recycled Fracturing Water (treated at well site) 75
2017-02-26 2017-03-02 Recycled Fracturing Water (treated at well site) 215
2017-02-26 2017-03-02 Recycled Fracturing Water (treated at well site) 226
2017-02-26 2017-02-26 Recycled Fracturing Water (treated at well site) 13
2017-05-26 2017-05-28 Recycled Fracturing Water (treated at well site) 30
2017-05-26 2017-05-28 Recycled Fracturing Water (treated at well site) 37
2017-05-26 2017-05-28 Recycled Fracturing Water (treated at well site) 39
2017-05-20 2017-05-28 Recycled Fracturing Water (treated at well site) 586
2017-05-24 2017-05-24 Surface Water - Runoff 100

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 4407 0.0 0.0 0.0
2018 8582 0.0 0.0 0.0
2019 8660 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-22 No Incident Encountered 0.00 0.00
2017-05-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References