If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776130909000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.676825,"lon":-119.971399,"icon":""}]} |
Location: 00/09-09-077-13W6/0 | |
Location Alias: 00/09-09-77-13 W6M | |
Location Alias 2: 00/09-09-077-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 13 | |
Section: 09 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 16-17 HZ PCOUPES 9-9-77-13 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0478601 | |
License Date: 2015-12-21 | |
License Status: Amended | |
Spud Date: 2017-02-07 | |
Final Drill Date: 2017-02-19 | |
Well Total Depth: 4770.00 m | |
Surface Hole Latitude: 55.676825 | |
Surface Hole Longitude: -119.971399 |
Date | Event |
---|---|
2015-12-21 | Obtained License |
2017-02-09 | Surface Casing Operation Performed |
2017-02-10 | Direction Drilling Operation Performed - Deviate |
2017-02-14 | Direction Drilling Operation Performed - Horizontal |
2017-02-15 | Well Log Performed |
2017-02-19 | Finished Drilling |
2017-02-19 | Well Log Performed |
2017-02-19 | Well Mode changed to Drilled and Cased |
2017-02-21 | Production Casing Operation Performed |
2017-02-22 | Rig Released |
2017-05-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-05-21 | Perforation Treatment Performed - Open-Hole Completion |
2017-05-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-05-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-01 | Well Fluid changed to Gas |
2017-06-01 | Well Mode changed to Testing |
2017-06-03 | Well Began Production |
2017-06-03 | Well Fluid changed to Gas |
2017-06-03 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-02-07 | Ensign Drilling Inc. | 555 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-02-10 | 1327.50 | Deviate (5 - 79 degrees) |
2017-02-14 | 2442.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-05-21 | Open Hole/Barefoot Completion | 4767.00 | 4770.00 | 0 |
2017-05-22 | Multi-Stage Fracture | 4317.70 | 4318.50 | 0 |
2017-05-22 | Multi-Stage Fracture | 4265.10 | 4265.90 | 0 |
2017-05-22 | Multi-Stage Fracture | 4212.40 | 4213.20 | 0 |
2017-05-22 | Multi-Stage Fracture | 4159.80 | 4160.60 | 0 |
2017-05-22 | Multi-Stage Fracture | 4094.50 | 4095.30 | 0 |
2017-05-22 | Multi-Stage Fracture | 4041.90 | 4042.70 | 0 |
2017-05-22 | Multi-Stage Fracture | 3989.70 | 3990.50 | 0 |
2017-05-22 | Multi-Stage Fracture | 3937.00 | 3937.80 | 0 |
2017-05-22 | Multi-Stage Fracture | 3871.80 | 3872.60 | 0 |
2017-05-22 | Multi-Stage Fracture | 3819.20 | 3820.00 | 0 |
2017-05-21 | Multi-Stage Fracture | 4755.70 | 4757.00 | 0 |
2017-05-22 | Multi-Stage Fracture | 3766.50 | 3767.30 | 0 |
2017-05-22 | Multi-Stage Fracture | 3713.70 | 3714.50 | 0 |
2017-05-22 | Multi-Stage Fracture | 3648.50 | 3649.30 | 0 |
2017-05-22 | Multi-Stage Fracture | 3595.90 | 3596.70 | 0 |
2017-05-22 | Multi-Stage Fracture | 3543.60 | 3544.40 | 0 |
2017-05-22 | Multi-Stage Fracture | 3491.00 | 3491.80 | 0 |
2017-05-22 | Multi-Stage Fracture | 3425.80 | 3426.60 | 0 |
2017-05-22 | Multi-Stage Fracture | 3373.20 | 3374.00 | 0 |
2017-05-23 | Multi-Stage Fracture | 3320.60 | 3321.40 | 0 |
2017-05-23 | Multi-Stage Fracture | 3268.80 | 3269.60 | 0 |
2017-05-21 | Multi-Stage Fracture | 4710.00 | 4710.80 | 0 |
2017-05-23 | Multi-Stage Fracture | 3203.80 | 3204.60 | 0 |
2017-05-23 | Multi-Stage Fracture | 3151.20 | 3152.00 | 0 |
2017-05-23 | Multi-Stage Fracture | 3098.60 | 3099.40 | 0 |
2017-05-23 | Multi-Stage Fracture | 3033.40 | 3034.20 | 0 |
2017-05-23 | Multi-Stage Fracture | 2980.80 | 2981.60 | 0 |
2017-05-23 | Multi-Stage Fracture | 2928.20 | 2929.00 | 0 |
2017-05-23 | Multi-Stage Fracture | 2875.50 | 2876.30 | 0 |
2017-05-23 | Multi-Stage Fracture | 2822.90 | 2823.70 | 0 |
2017-05-23 | Multi-Stage Fracture | 2757.60 | 2758.40 | 0 |
2017-05-23 | Multi-Stage Fracture | 2705.00 | 2705.80 | 0 |
2017-05-21 | Multi-Stage Fracture | 4657.50 | 4658.30 | 0 |
2017-05-23 | Multi-Stage Fracture | 2652.40 | 2653.20 | 0 |
2017-05-23 | Multi-Stage Fracture | 2587.20 | 2588.00 | 0 |
2017-05-23 | Multi-Stage Fracture | 2534.50 | 2535.30 | 0 |
2017-05-23 | Multi-Stage Fracture | 2481.90 | 2482.70 | 0 |
2017-05-23 | Multi-Stage Fracture | 2442.00 | 2442.80 | 0 |
2017-05-21 | Multi-Stage Fracture | 4604.90 | 4605.70 | 0 |
2017-05-21 | Multi-Stage Fracture | 4552.30 | 4553.10 | 0 |
2017-05-21 | Multi-Stage Fracture | 4487.00 | 4487.80 | 0 |
2017-05-21 | Multi-Stage Fracture | 4434.40 | 4435.20 | 0 |
2017-05-21 | Multi-Stage Fracture | 4382.90 | 4383.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-05-21 | 2017-05-23 | 2,252 | 12,022 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 84.5401 | N/A | |||
FRAC SAND. 30/50 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 10.7199 | N/A | ||
FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 4.583 | N/A | ||
2K7 Solution W-M | BJ Services | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0298 | N/A | |
Methanol | 67-56-1 | 100 | 0.0298 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0298 | N/A | ||||
Breaker N | BJ Services | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0038 | N/A | |
FRP-1 | BJ Services | Friction Reducer | Ammonium sulfate | 7783-20-2 | 100 | 0.1025 | N/A | |
Non-hazardous | Not Available | 100 | 0.1025 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-05-21 | 2017-05-31 | Surface Water - Runoff | 9501 |
2017-05-21 | 2017-05-30 | Groundwater - Saline | 226 |
2017-05-23 | 2017-05-31 | Recycled Fracturing Water (treated at independent stand-alone facility) | 185 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 93 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 71 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 75 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 84 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 107 |
2017-05-21 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 105 |
2017-05-21 | 2017-05-31 | Recycled Fracturing Water (treated at well site) | 63 |
2017-05-21 | 2017-05-31 | Recycled Fracturing Water (treated at well site) | 86 |
2017-05-21 | 2017-05-31 | Recycled Fracturing Water (treated at well site) | 95 |
2017-05-21 | 2017-05-31 | Recycled Fracturing Water (treated at well site) | 75 |
2017-02-26 | 2017-03-02 | Recycled Fracturing Water (treated at well site) | 215 |
2017-02-26 | 2017-03-02 | Recycled Fracturing Water (treated at well site) | 226 |
2017-02-26 | 2017-02-26 | Recycled Fracturing Water (treated at well site) | 13 |
2017-05-26 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 30 |
2017-05-26 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 37 |
2017-05-26 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 39 |
2017-05-20 | 2017-05-28 | Recycled Fracturing Water (treated at well site) | 586 |
2017-05-24 | 2017-05-24 | Surface Water - Runoff | 100 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 4407 | 0.0 | 0.0 | 0.0 |
2018 | 8582 | 0.0 | 0.0 | 0.0 |
2019 | 8660 | 0.0 | 0.0 | 0.0 |
2020 | 2169 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-02-22 | No Incident Encountered | 0.00 | 0.00 |
2017-05-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]