X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776122703000

Well Details

Well ID: 0776122703000
Loading map...
Location: 00/03-27-077-12W6/0
Location Alias: 00/03-27-77-12 W6M
Location Alias 2: 00/03-27-077-12 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 12
Section: 27
County/Municipality: Saddle Hills County
Well Name: BIR 1-22 HZ PCOUPES 3-27-77-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0488088
License Date: 2018-02-12
License Status: Issued
Spud Date: 2018-02-23
Final Drill Date: 2018-03-06
Well Total Depth: 4512.00 m
Surface Hole Latitude: 55.679717
Surface Hole Longitude: -119.763398

For data sources see[1][2]

Well History

Date Event
2018-02-12 Obtained License
2018-02-25 Surface Casing Operation Performed
2018-02-26 Direction Drilling Operation Performed - Deviate
2018-03-02 Direction Drilling Operation Performed - Horizontal
2018-03-03 Well Log Performed
2018-03-06 Finished Drilling
2018-03-06 Well Log Performed
2018-03-06 Well Mode changed to Drilled and Cased
2018-03-07 Production Casing Operation Performed
2018-03-07 Well Log Performed
2018-03-08 Rig Released
2018-07-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-13 Perforation Treatment Performed - Open-Hole Completion
2018-07-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-01 Well Fluid changed to Gas
2018-08-01 Well Mode changed to Testing
2018-08-03 Well Began Production
2018-08-03 Well Fluid changed to Gas
2018-08-03 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-23 Ensign Drilling Inc. 556 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-26 676.20 Deviate (5 - 79 degrees)
2018-03-02 2697.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-13 Open Hole/Barefoot Completion 4509.00 4512.00 0
2018-07-13 Multi-Stage Fracture 4112.90 4113.80 0
2018-07-13 Multi-Stage Fracture 4057.10 4058.00 0
2018-07-13 Multi-Stage Fracture 4014.70 4015.60 0
2018-07-13 Multi-Stage Fracture 3958.80 3959.70 0
2018-07-14 Multi-Stage Fracture 3903.00 3903.90 0
2018-07-14 Multi-Stage Fracture 3860.80 3861.70 0
2018-07-14 Multi-Stage Fracture 3805.30 3806.20 0
2018-07-14 Multi-Stage Fracture 3763.20 3764.10 0
2018-07-14 Multi-Stage Fracture 3707.30 3708.20 0
2018-07-14 Multi-Stage Fracture 3651.50 3652.40 0
2018-07-13 Multi-Stage Fracture 4497.10 4498.30 0
2018-07-19 Multi-Stage Fracture 3609.50 3610.40 0
2018-07-20 Multi-Stage Fracture 3555.70 3556.60 0
2018-07-20 Multi-Stage Fracture 3513.50 3514.40 0
2018-07-20 Multi-Stage Fracture 3459.50 3460.40 0
2018-07-20 Multi-Stage Fracture 3404.30 3405.20 0
2018-07-20 Multi-Stage Fracture 3361.90 3362.80 0
2018-07-20 Multi-Stage Fracture 3306.00 3306.90 0
2018-07-20 Multi-Stage Fracture 3263.80 3264.70 0
2018-07-20 Multi-Stage Fracture 3027.90 3028.80 0
2018-07-20 Multi-Stage Fracture 3152.80 3153.70 0
2018-07-13 Multi-Stage Fracture 4462.50 4463.40 0
2018-07-20 Multi-Stage Fracture 3111.00 3111.90 0
2018-07-20 Multi-Stage Fracture 3057.30 3058.20 0
2018-07-20 Multi-Stage Fracture 3003.10 3004.00 0
2018-07-20 Multi-Stage Fracture 2960.70 2961.60 0
2018-07-20 Multi-Stage Fracture 2904.80 2905.70 0
2018-07-20 Multi-Stage Fracture 2863.00 2863.90 0
2018-07-20 Multi-Stage Fracture 2807.20 2808.10 0
2018-07-20 Multi-Stage Fracture 2752.10 2753.00 0
2018-07-20 Multi-Stage Fracture 2723.10 2724.00 0
2018-07-13 Multi-Stage Fracture 4407.20 4408.10 0
2018-07-13 Multi-Stage Fracture 4365.00 4365.90 0
2018-07-13 Multi-Stage Fracture 4309.20 4310.10 0
2018-07-13 Multi-Stage Fracture 4253.50 4254.40 0
2018-07-13 Multi-Stage Fracture 4211.00 4211.90 0
2018-07-13 Multi-Stage Fracture 4155.40 4156.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-13 2018-07-20 2,268 12,623 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.4196 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.4286 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.0444 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0112 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0112 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0112 N/A
Polyethylene glycol 25322-68-3 100 0.0112 N/A
Sodium bromide 7647-15-6 100 0.0112 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0961 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0961 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0961 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-06-25 2018-06-25 Recycled Fracturing Water (treated at well site) 59
2018-07-15 2018-07-16 Recycled Fracturing Water (treated at well site) 74
2018-07-10 2018-07-20 Surface Water - Runoff 11934
2018-06-29 2018-07-19 Oilfield Produced Water 528

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2938 0.0 0.0 0.0
2019 8579 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-08 No Incident Encountered 0.00 0.00
2018-08-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References