If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776122505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.691171,"lon":-119.703594,"icon":""}]} |
Location: 00/05-25-077-12W6/0 | |
Location Alias: 00/05-25-77-12 W6M | |
Location Alias 2: 00/05-25-077-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 12 | |
Section: 25 | |
County/Municipality: Saddle Hills County | |
Well Name: BIRCHCLIFF HZ PCOUPES 5-25-77-12 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0440854 | |
License Date: 2011-12-12 | |
License Status: Issued | |
Spud Date: 2012-01-08 | |
Final Drill Date: 2012-01-25 | |
Well Total Depth: 4044.00 m | |
Surface Hole Latitude: 55.691171 | |
Surface Hole Longitude: -119.703594 |
Date | Event |
---|---|
2011-12-12 | Obtained License |
2012-01-10 | Surface Casing Operation Performed |
2012-01-11 | Well Log Performed |
2012-01-13 | Direction Drilling Operation Performed - Horizontal |
2012-01-25 | Finished Drilling |
2012-01-25 | Well Log Performed |
2012-01-25 | Well Mode changed to Drilled and Cased |
2012-01-28 | Liner Casing Operation Performed |
2012-01-28 | Production Casing Operation Performed |
2012-01-28 | Rig Released |
2012-02-22 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-28 | Well Log Performed |
2012-03-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-11 | Well Fluid changed to Gas |
2012-03-11 | Well Mode changed to Testing |
2012-04-03 | Well Began Production |
2012-04-03 | Well Fluid changed to Gas |
2012-04-03 | Well Mode changed to Flowing |
2017-07-01 | Well Fluid changed to Gas |
2017-07-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-08 | Savanna Drilling Corp. | 630 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-13 | 1715.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-22 | Open Hole/Barefoot Completion | 4040.00 | 4044.00 | 0 |
2012-03-07 | Multi-Stage Fracture | 2956.00 | 2956.80 | 0 |
2012-03-08 | Multi-Stage Fracture | 2826.20 | 2827.00 | 0 |
2012-03-08 | Multi-Stage Fracture | 2683.40 | 2684.20 | 0 |
2012-03-08 | Multi-Stage Fracture | 2553.10 | 2553.90 | 0 |
2012-03-08 | Multi-Stage Fracture | 2422.10 | 2422.90 | 0 |
2012-03-08 | Multi-Stage Fracture | 2291.90 | 2292.70 | 0 |
2012-03-06 | Multi-Stage Fracture | 4030.70 | 4031.50 | 0 |
2012-03-06 | Multi-Stage Fracture | 3894.30 | 3895.10 | 0 |
2012-03-06 | Multi-Stage Fracture | 3763.80 | 3764.60 | 0 |
2012-03-06 | Multi-Stage Fracture | 3633.80 | 3634.60 | 0 |
2012-03-07 | Multi-Stage Fracture | 3491.10 | 3491.90 | 0 |
2012-03-07 | Multi-Stage Fracture | 3360.60 | 3361.40 | 0 |
2012-03-07 | Multi-Stage Fracture | 3229.70 | 3230.50 | 0 |
2012-03-07 | Multi-Stage Fracture | 3086.70 | 3087.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6387 | 0.0 | 0.0 | 0.0 |
2013 | 8617 | 0.0 | 0.0 | 0.0 |
2014 | 8532 | 0.0 | 0.0 | 0.0 |
2015 | 7119 | 0.0 | 0.0 | 0.0 |
2016 | 8455 | 0.0 | 0.0 | 0.0 |
2017 | 5982 | 0.0 | 0.0 | 0.0 |
2018 | 8256 | 0.0 | 0.0 | 0.0 |
2019 | 8591 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]