X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776121308020

Well Details

Well ID: 0776121308020
Loading map...
Location: 02/08-13-077-12W6/0
Location Alias: 02/08-13-77-12 W6M
Location Alias 2: 02/08-13-077-12 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 12
Section: 13
County/Municipality: Saddle Hills County
Well Name: BIR 01-22 HZ 102 PCOUPES 8-13-77-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0488087
License Date: 2018-02-12
License Status: Issued
Spud Date: 2018-03-10
Final Drill Date: 2018-06-05
Well Total Depth: 5756.00 m
Surface Hole Latitude: 55.679627
Surface Hole Longitude: -119.763400

For data sources see[1][2]

Well History

Date Event
2018-02-12 Obtained License
2018-03-10 Well Mode changed to Preset
2018-03-11 Surface Casing Operation Performed
2018-05-25 Direction Drilling Operation Performed - Deviate
2018-05-29 Direction Drilling Operation Performed - Horizontal
2018-05-30 Well Log Performed
2018-06-05 Finished Drilling
2018-06-05 Well Log Performed
2018-06-05 Well Mode changed to Drilled and Cased
2018-06-06 Production Casing Operation Performed
2018-06-07 Rig Released
2018-07-14 Perforation Treatment Performed - Fractured
2018-07-14 Perforation Treatment Performed - Jet Perforation
2018-07-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-15 Perforation Treatment Performed - Fractured
2018-07-15 Perforation Treatment Performed - Jet Perforation
2018-07-16 Perforation Treatment Performed - Fractured
2018-07-16 Perforation Treatment Performed - Jet Perforation
2018-07-17 Perforation Treatment Performed - Fractured
2018-07-17 Perforation Treatment Performed - Jet Perforation
2018-07-18 Perforation Treatment Performed - Fractured
2018-07-18 Perforation Treatment Performed - Jet Perforation
2018-07-19 Perforation Treatment Performed - Fractured
2018-07-19 Perforation Treatment Performed - Jet Perforation
2018-07-20 Perforation Treatment Performed - Fractured
2018-07-20 Perforation Treatment Performed - Jet Perforation
2018-08-01 Well Fluid changed to Gas
2018-08-01 Well Mode changed to Testing
2018-08-03 Well Began Production
2018-08-03 Well Fluid changed to Gas
2018-08-03 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-03-10 Ensign Drilling Inc. 556 N/A Drill To LD
2018-05-25 Ensign Drilling Inc. 556 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-05-25 706.60 Deviate (5 - 79 degrees)
2018-05-29 2598.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-14 Multi-Stage Fracture 5719.70 5720.70 0
2018-07-14 Perforation 5512.50 5512.80 3
2018-07-18 Perforation 3712.50 3712.80 3
2018-07-18 Fracture 3712.50 3787.80 0
2018-07-18 Perforation 3687.50 3687.80 3
2018-07-18 Perforation 3662.50 3662.80 3
2018-07-18 Perforation 3637.50 3637.80 3
2018-07-18 Perforation 3612.50 3612.80 3
2018-07-18 Fracture 3612.50 3687.80 0
2018-07-18 Perforation 3587.50 3587.80 3
2018-07-18 Perforation 3562.50 3562.80 3
2018-07-18 Perforation 3537.50 3537.80 3
2018-07-15 Fracture 5512.50 5587.80 0
2018-07-18 Perforation 3512.50 3512.80 3
2018-07-18 Fracture 3512.50 3587.80 0
2018-07-18 Perforation 3487.50 3487.80 3
2018-07-18 Perforation 3462.50 3462.80 3
2018-07-18 Perforation 3437.50 3437.80 3
2018-07-18 Perforation 3412.50 3412.80 3
2018-07-18 Fracture 3412.50 3487.80 0
2018-07-19 Perforation 3387.50 3387.80 3
2018-07-19 Perforation 3362.50 3362.80 3
2018-07-19 Perforation 3337.50 3337.80 3
2018-07-15 Perforation 5487.50 5487.80 3
2018-07-19 Perforation 3312.50 3312.80 3
2018-07-19 Fracture 3312.50 3387.80 0
2018-07-19 Perforation 3287.50 3287.80 3
2018-07-19 Perforation 3262.50 3262.80 3
2018-07-19 Perforation 3237.50 3237.80 3
2018-07-19 Perforation 3212.50 3212.80 3
2018-07-19 Fracture 3212.50 3287.80 0
2018-07-19 Perforation 3187.50 3187.80 3
2018-07-19 Perforation 3162.50 3162.80 3
2018-07-19 Perforation 3137.50 3137.80 3
2018-07-15 Perforation 5462.50 5462.80 3
2018-07-19 Perforation 3112.50 3112.80 3
2018-07-19 Fracture 3112.50 3187.80 0
2018-07-19 Perforation 3087.50 3087.80 3
2018-07-19 Perforation 3062.50 3062.80 3
2018-07-19 Perforation 3037.50 3037.80 3
2018-07-19 Perforation 3012.50 3012.80 3
2018-07-19 Fracture 3012.50 3087.80 0
2018-07-19 Perforation 2987.50 2987.80 3
2018-07-19 Perforation 2962.50 2962.80 3
2018-07-19 Perforation 2937.50 2937.80 3
2018-07-15 Perforation 5437.50 5437.80 3
2018-07-19 Perforation 2912.50 2912.80 3
2018-07-19 Fracture 2912.50 2987.80 0
2018-07-19 Perforation 2887.50 2887.80 3
2018-07-19 Perforation 2862.50 2862.80 3
2018-07-19 Perforation 2837.50 2837.80 3
2018-07-19 Perforation 2812.50 2812.80 3
2018-07-20 Fracture 2812.50 2887.80 0
2018-07-20 Perforation 2787.50 2787.80 3
2018-07-20 Perforation 2762.50 2762.80 3
2018-07-20 Perforation 2737.50 2737.80 3
2018-07-15 Perforation 5412.50 5412.80 3
2018-07-20 Perforation 2712.50 2712.80 3
2018-07-20 Fracture 2712.50 2787.80 0
2018-07-20 Perforation 2687.50 2687.80 3
2018-07-20 Perforation 2662.50 2662.80 3
2018-07-20 Perforation 2637.50 2637.80 3
2018-07-20 Perforation 2612.50 2612.80 3
2018-07-20 Perforation 2587.50 2587.80 3
2018-07-20 Fracture 2587.50 2687.80 0
2018-07-15 Fracture 5412.50 5487.80 0
2018-07-15 Perforation 5387.50 5387.80 3
2018-07-15 Perforation 5362.50 5362.80 3
2018-07-15 Perforation 5337.50 5337.80 3
2018-07-14 Perforation 5687.50 5687.80 3
2018-07-15 Perforation 5312.50 5312.80 3
2018-07-15 Fracture 5312.50 5387.80 0
2018-07-15 Perforation 5287.50 5287.80 3
2018-07-15 Perforation 5262.50 5262.80 3
2018-07-15 Perforation 5237.50 5237.80 3
2018-07-15 Perforation 5212.50 5212.80 3
2018-07-15 Fracture 5212.50 5287.80 0
2018-07-15 Perforation 5187.50 5187.80 3
2018-07-15 Perforation 5162.50 5162.80 3
2018-07-15 Perforation 5137.50 5137.80 3
2018-07-14 Perforation 5662.50 5662.80 3
2018-07-15 Perforation 5112.50 5112.80 3
2018-07-15 Fracture 5112.50 5187.80 0
2018-07-15 Perforation 5087.50 5087.80 3
2018-07-15 Perforation 5062.50 5062.80 3
2018-07-15 Perforation 5037.50 5037.80 3
2018-07-15 Perforation 5012.50 5012.80 3
2018-07-15 Fracture 5012.50 5087.80 0
2018-07-16 Perforation 4987.50 4987.80 3
2018-07-16 Perforation 4962.50 4962.80 3
2018-07-16 Perforation 4937.50 4937.80 3
2018-07-14 Perforation 5637.50 5637.80 3
2018-07-16 Perforation 4912.50 4912.80 3
2018-07-16 Fracture 4912.50 4987.80 0
2018-07-16 Perforation 4887.50 4887.80 3
2018-07-16 Perforation 4862.50 4862.80 3
2018-07-16 Perforation 4837.50 4837.80 3
2018-07-16 Perforation 4812.50 4812.80 3
2018-07-16 Fracture 4812.50 4887.80 0
2018-07-16 Perforation 4787.50 4787.80 3
2018-07-16 Perforation 4762.50 4762.80 3
2018-07-16 Perforation 4737.50 4737.80 3
2018-07-14 Perforation 5612.50 5612.80 3
2018-07-16 Perforation 4712.50 4712.80 3
2018-07-16 Fracture 4712.50 4787.80 0
2018-07-16 Perforation 4687.50 4687.80 3
2018-07-16 Perforation 4662.50 4662.80 3
2018-07-16 Perforation 4637.50 4637.80 3
2018-07-16 Perforation 4612.50 4612.80 3
2018-07-16 Fracture 4612.50 4687.80 0
2018-07-17 Perforation 4587.50 4587.80 3
2018-07-17 Perforation 4562.50 4562.80 3
2018-07-17 Perforation 4537.50 4537.80 3
2018-07-14 Fracture 5612.50 5687.80 0
2018-07-17 Perforation 4512.50 4512.80 3
2018-07-17 Fracture 4512.50 4587.80 0
2018-07-17 Perforation 4487.50 4487.80 3
2018-07-17 Perforation 4462.50 4462.80 3
2018-07-17 Perforation 4437.50 4437.80 3
2018-07-17 Perforation 4412.50 4412.80 3
2018-07-17 Fracture 4412.50 4487.80 0
2018-07-17 Perforation 4387.50 4387.80 3
2018-07-17 Perforation 4362.50 4362.80 3
2018-07-17 Perforation 4337.50 4337.80 3
2018-07-14 Perforation 5587.50 5587.80 3
2018-07-17 Perforation 4312.50 4312.80 3
2018-07-17 Fracture 4312.50 4387.80 0
2018-07-17 Perforation 4287.50 4287.80 3
2018-07-17 Perforation 4262.50 4262.80 3
2018-07-17 Perforation 4237.50 4237.80 3
2018-07-17 Perforation 4212.50 4212.80 3
2018-07-17 Fracture 4212.50 4287.80 0
2018-07-17 Perforation 4187.50 4187.80 3
2018-07-17 Perforation 4162.50 4162.80 3
2018-07-17 Perforation 4137.50 4137.80 3
2018-07-14 Perforation 5562.50 5562.80 3
2018-07-17 Perforation 4112.50 4112.80 3
2018-07-17 Fracture 4112.50 4187.80 0
2018-07-17 Perforation 4087.50 4087.80 3
2018-07-17 Perforation 4062.50 4062.80 3
2018-07-17 Perforation 4037.50 4037.80 3
2018-07-17 Perforation 4012.50 4012.80 3
2018-07-17 Fracture 4012.50 4087.80 0
2018-07-18 Perforation 3987.50 3987.80 3
2018-07-18 Perforation 3962.50 3962.80 3
2018-07-18 Perforation 3937.50 3937.80 3
2018-07-14 Perforation 5537.50 5537.80 3
2018-07-18 Perforation 3912.50 3912.80 3
2018-07-18 Fracture 3912.50 3987.80 0
2018-07-18 Perforation 3887.50 3887.80 3
2018-07-18 Perforation 3862.50 3862.80 3
2018-07-18 Perforation 3837.50 3837.80 3
2018-07-18 Perforation 3812.50 3812.80 3
2018-07-18 Fracture 3812.50 3887.80 0
2018-07-18 Perforation 3787.50 3787.80 3
2018-07-18 Perforation 3762.50 3762.80 3
2018-07-18 Perforation 3737.50 3737.80 3

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-14 2018-07-20 2,263 19,071 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.1935 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.863 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.3529 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.474 N/A
Water 7732-18-5 100 0.474 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0112 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0112 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0112 N/A
Polyethylene glycol 25322-68-3 100 0.0112 N/A
Sodium bromide 7647-15-6 100 0.0112 N/A
CI-9100G Calfrac Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0001 N/A
Cinnamaldehyde 104-55-2 100 0.0001 N/A
Dipropylene glycol monomethyl ether 34590-94-8 100 0.0001 N/A
Ethylene Glycol 107-21-1 100 0.0001 N/A
Formic acid 64-18-6 100 0.0001 N/A
Isopropyl alcohol 67-63-0 100 0.0001 N/A
Tar bases. quinoline derivs. 68513-87-1 100 0.0001 N/A
Tar bases. quinolone derivs.. benzyl chloride-quarternized 72480-70-7 100 0.0001 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.1049 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.1049 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1049 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-06-25 2018-06-25 Recycled Fracturing Water (treated at well site) 89
2018-07-15 2018-07-16 Recycled Fracturing Water (treated at well site) 111
2018-07-10 2018-07-20 Surface Water - Runoff 18032
2018-06-29 2018-07-19 Oilfield Produced Water 798

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2957 0.0 0.0 0.0
2019 8249 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-12 No Incident Encountered 0.00 0.00
2018-06-07 No Incident Encountered 0.00 0.00
2018-08-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References