X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776121304000

Well Details

Well ID: 0776121304000
Loading map...
Location: 00/04-13-077-12W6/0
Location Alias: 00/04-13-77-12 W6M
Location Alias 2: 00/04-13-077-12 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 12
Section: 13
County/Municipality: Saddle Hills County
Well Name: BIR 16-15 HZ PCOUPES 4-13-77-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0484829
License Date: 2017-08-01
License Status: Issued
Spud Date: 2017-08-26
Final Drill Date: 2017-09-07
Well Total Depth: 4830.00 m
Surface Hole Latitude: 55.678145
Surface Hole Longitude: -119.763506

For data sources see[1][2]

Well History

Date Event
2017-08-01 Obtained License
2017-08-28 Surface Casing Operation Performed
2017-08-29 Direction Drilling Operation Performed - Deviate
2017-09-03 Direction Drilling Operation Performed - Horizontal
2017-09-03 Well Log Performed
2017-09-06 Production Casing Operation Performed
2017-09-07 Finished Drilling
2017-09-07 Well Log Performed
2017-09-07 Well Mode changed to Drilled and Cased
2017-09-08 Well Log Performed
2017-09-09 Rig Released
2017-11-01 Well Fluid changed to Gas
2017-11-01 Well Mode changed to Testing
2017-11-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-08 Perforation Treatment Performed - Open-Hole Completion
2017-11-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-10 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-21 Well Began Production
2017-11-21 Well Fluid changed to Gas
2017-11-21 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-08-26 Ensign Drilling Inc. 555 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-08-29 1320.60 Deviate (5 - 79 degrees)
2017-09-03 2429.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-11-08 Open Hole/Barefoot Completion 4826.00 4830.00 0
2017-11-09 Multi-Stage Fracture 4417.90 4418.80 0
2017-11-09 Multi-Stage Fracture 4359.00 4359.90 0
2017-11-09 Multi-Stage Fracture 4311.60 4312.50 0
2017-11-09 Multi-Stage Fracture 4264.10 4265.00 0
2017-11-09 Multi-Stage Fracture 4205.60 4206.50 0
2017-11-09 Multi-Stage Fracture 4158.10 4159.00 0
2017-11-09 Multi-Stage Fracture 4110.80 4111.70 0
2017-11-09 Multi-Stage Fracture 4052.00 4052.90 0
2017-11-09 Multi-Stage Fracture 4004.40 4005.30 0
2017-11-09 Multi-Stage Fracture 3956.70 3957.60 0
2017-11-08 Multi-Stage Fracture 4814.70 4815.90 0
2017-11-09 Multi-Stage Fracture 3897.70 3898.60 0
2017-11-09 Multi-Stage Fracture 3850.30 3851.20 0
2017-11-09 Multi-Stage Fracture 3802.80 3803.70 0
2017-11-10 Multi-Stage Fracture 3743.90 3744.80 0
2017-11-10 Multi-Stage Fracture 3696.00 3696.90 0
2017-11-10 Multi-Stage Fracture 3648.70 3649.60 0
2017-11-10 Multi-Stage Fracture 3589.80 3590.70 0
2017-11-10 Multi-Stage Fracture 3542.20 3543.10 0
2017-11-10 Multi-Stage Fracture 3483.40 3484.30 0
2017-11-10 Multi-Stage Fracture 3435.80 3436.70 0
2017-11-08 Multi-Stage Fracture 4772.80 4773.70 0
2017-11-10 Multi-Stage Fracture 3387.50 3388.40 0
2017-11-10 Multi-Stage Fracture 3339.50 3340.40 0
2017-11-10 Multi-Stage Fracture 3280.90 3281.80 0
2017-11-10 Multi-Stage Fracture 3233.20 3234.10 0
2017-11-10 Multi-Stage Fracture 3174.60 3175.50 0
2017-11-10 Multi-Stage Fracture 3126.50 3127.40 0
2017-11-10 Multi-Stage Fracture 3078.80 3079.70 0
2017-11-10 Multi-Stage Fracture 3019.90 3020.80 0
2017-11-10 Multi-Stage Fracture 2972.50 2973.40 0
2017-11-10 Multi-Stage Fracture 2924.80 2925.70 0
2017-11-09 Multi-Stage Fracture 4725.10 4726.00 0
2017-11-10 Multi-Stage Fracture 2865.50 2866.40 0
2017-11-10 Multi-Stage Fracture 2818.50 2819.40 0
2017-11-10 Multi-Stage Fracture 2770.80 2771.70 0
2017-11-10 Multi-Stage Fracture 2712.60 2713.50 0
2017-11-10 Multi-Stage Fracture 2665.10 2666.00 0
2017-11-10 Multi-Stage Fracture 2617.70 2618.60 0
2017-11-10 Multi-Stage Fracture 2578.20 2579.10 0
2017-11-09 Multi-Stage Fracture 4677.60 4678.50 0
2017-11-09 Multi-Stage Fracture 4618.90 4619.80 0
2017-11-09 Multi-Stage Fracture 4571.50 4572.40 0
2017-11-09 Multi-Stage Fracture 4523.60 4524.50 0
2017-11-09 Multi-Stage Fracture 4465.20 4466.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-11-08 2017-11-10 2,303 15,864 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 85.9083 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 10.0725 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.7768 N/A
2K7 Solution W-M BJ Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0278 N/A
Methanol 67-56-1 100 0.0278 N/A
Water 7732-18-5 100 0.0278 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0053 N/A
FRP-1 BJ Services Friction Reducer Ammonium sulfate 7783-20-2 100 0.101 N/A
Non-hazardous Not Available 100 0.101 N/A
InFlo 73 BJ Services Surfactant Alkoxylated alcohol_2 9969 100 0.0836 N/A
Amine derivative 9969 100 0.0836 N/A
Cyclohexanol 108-93-0 100 0.0836 N/A
Glycerine 56-81-5 100 0.0836 N/A
Pentanol 71-41-0 100 0.0836 N/A
Petroleum distillates 64742-47-8 100 0.0836 N/A
Propylene glycol 57-55-6 100 0.0836 N/A
Urea 57-13-6 100 0.0836 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-10-13 2017-11-14 Surface Water - Runoff 17784
2017-09-29 2017-09-30 Surface Water - Runoff 63
2017-09-29 2017-11-13 Recycled Fracturing Water (treated at well site) 1885
2017-10-04 2017-10-24 Recycled Fracturing Water (treated at well site) 268

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 821 0.0 0.0 0.0
2018 8426 0.0 0.0 0.0
2019 8645 0.0 0.0 0.0
2020 2174 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-09-09 No Incident Encountered 0.00 0.00
2017-11-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References