X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776121012030

Well Details

Well ID: 0776121012030
Loading map...
Location: 03/12-10-077-12W6/0
Location Alias: 03/12-10-77-12 W6M
Location Alias 2: 03/12-10-077-12 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 12
Section: 10
County/Municipality: Saddle Hills County
Well Name: BIR 4-11 HZ 103 PCOUPES 12-10-77-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0481704
License Date: 2016-12-02
License Status: Issued
Spud Date: 2017-01-03
Final Drill Date: 2017-02-16
Well Total Depth: 4290.00 m
Surface Hole Latitude: 55.651838
Surface Hole Longitude: -119.756267

For data sources see[1][2]

Well History

Date Event
2016-12-02 Obtained License
2017-01-03 Well Mode changed to Preset
2017-01-04 Surface Casing Operation Performed
2017-02-06 Direction Drilling Operation Performed - Deviate
2017-02-12 Direction Drilling Operation Performed - Horizontal
2017-02-16 Finished Drilling
2017-02-16 Well Log Performed
2017-02-16 Well Mode changed to Drilled and Cased
2017-02-17 Production Casing Operation Performed
2017-02-17 Well Log Performed
2017-02-18 Rig Released
2017-03-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-23 Perforation Treatment Performed - Open-Hole Completion
2017-03-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-28 Well Began Production
2017-03-28 Well Fluid changed to Gas
2017-03-28 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-03 Trinidad Drilling Ltd. 438 N/A Set Surface
2017-02-04 Trinidad Drilling Ltd. 438 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-02-06 1597.50 Deviate (5 - 79 degrees)
2017-02-12 2522.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-03-23 Open Hole/Barefoot Completion 4287.00 4290.00 0
2017-03-24 Multi-Stage Fracture 3408.30 3409.10 0
2017-03-24 Multi-Stage Fracture 3292.50 3293.30 0
2017-03-24 Multi-Stage Fracture 3176.80 3177.60 0
2017-03-24 Multi-Stage Fracture 3061.20 3062.00 0
2017-03-24 Multi-Stage Fracture 2958.00 2958.80 0
2017-03-24 Multi-Stage Fracture 2842.30 2843.10 0
2017-03-24 Multi-Stage Fracture 2726.50 2727.30 0
2017-03-24 Multi-Stage Fracture 2611.10 2611.90 0
2017-03-24 Multi-Stage Fracture 2545.80 2546.60 0
2017-03-23 Multi-Stage Fracture 4275.70 4277.00 0
2017-03-23 Multi-Stage Fracture 4204.80 4205.60 0
2017-03-23 Multi-Stage Fracture 4089.00 4089.80 0
2017-03-23 Multi-Stage Fracture 3973.20 3974.00 0
2017-03-23 Multi-Stage Fracture 3857.60 3858.20 0
2017-03-23 Multi-Stage Fracture 3741.90 3742.70 0
2017-03-24 Multi-Stage Fracture 3638.80 3639.60 0
2017-03-24 Multi-Stage Fracture 3523.70 3524.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-03-23 2017-03-24 2,380 6,858 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 84.0573 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 9.4805 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 6.3188 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0085 N/A
Dibromoacetonitrile 3252-43-5 100 0.0085 N/A
Polyethylene Glycol 25322-68-3 100 0.0085 N/A
Sodium Bromide 7647-15-6 100 0.0085 N/A
Water 7732-18-5 100 0.0085 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0045 N/A
FRP-1 BJ Services Friction Reducer Ammonium sulfate 7783-20-2 100 0.1065 N/A
Non-hazardous Not Available 100 0.1065 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-25 2017-01-28 Surface Water - Runoff 662
2017-01-28 2017-01-29 Surface Water - Runoff 407
2017-01-30 2017-02-03 Surface Water - Runoff 1078
2017-02-03 2017-02-04 Surface Water - Runoff 180
2017-02-08 2017-03-16 Surface Water - Runoff 1788
2017-02-05 2017-02-08 Surface Water - Runoff 565
2017-03-08 2017-03-15 Surface Water - Runoff 1741
2017-03-05 2017-03-05 Surface Water - Runoff 53
2017-03-08 2017-03-24 Recycled Fracturing Water (treated at independent stand-alone facility) 399

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5927 0.0 0.0 0.0
2018 8598 0.0 0.0 0.0
2019 8641 0.0 0.0 0.0
2020 2143 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-04 No Incident Encountered 0.00 0.00
2017-02-18 No Incident Encountered 0.00 0.00
2017-03-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References