X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776120813000

Well Details

Well ID: 0776120813000
Loading map...
Location: 00/13-08-077-12W6/0
Location Alias: 00/13-08-77-12 W6M
Location Alias 2: 00/13-08-077-12 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 12
Section: 08
County/Municipality: Saddle Hills County
Well Name: AVN ETAL HZ PCOUPES 13-8-77-12
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0435858
License Date: 2011-08-09
License Status: Issued
Spud Date: 2011-09-23
Final Drill Date: 2011-10-10
Well Total Depth: 4262.00 m
Surface Hole Latitude: 55.651300
Surface Hole Longitude: -119.805429

For data sources see[1][2]

Well History

Date Event
2011-08-09 Obtained License
2011-09-25 Surface Casing Operation Performed
2011-09-29 Direction Drilling Operation Performed - Horizontal
2011-10-10 Finished Drilling
2011-10-10 Well Log Performed
2011-10-10 Well Mode changed to Drilled and Cased
2011-10-12 Production Casing Operation Performed
2011-10-12 Well Log Performed
2011-10-14 Rig Released
2011-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-23 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-24 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-24 Well Log Performed
2012-01-27 Well Began Production
2012-01-27 Well Fluid changed to Gas
2012-01-27 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-29 1920.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-23 Multi-Stage Fracture 4244.00 4245.00 0
2011-10-25 Acid Treatment 3760.00 3761.00 0
2011-10-25 Multi-Stage Fracture 3639.00 3640.00 0
2011-10-25 Acid Treatment 3639.00 3640.00 0
2011-10-25 Multi-Stage Fracture 3518.00 3519.00 0
2011-10-25 Acid Treatment 3518.00 3519.00 0
2011-10-25 Multi-Stage Fracture 3397.00 3398.00 0
2011-10-25 Acid Treatment 3397.00 3398.00 0
2011-10-25 Multi-Stage Fracture 3276.00 3277.00 0
2011-10-25 Acid Treatment 3276.00 3277.00 0
2011-10-26 Multi-Stage Fracture 3155.00 3156.00 0
2011-10-23 Acid Treatment 4244.00 4245.00 0
2011-10-26 Acid Treatment 3155.00 3156.00 0
2011-10-26 Multi-Stage Fracture 3034.00 3035.00 0
2011-10-26 Acid Treatment 3034.00 3035.00 0
2011-10-26 Multi-Stage Fracture 2913.00 2914.00 0
2011-10-26 Multi-Stage Fracture 2780.00 2781.00 0
2011-10-26 Acid Treatment 2780.00 2781.00 0
2011-10-26 Multi-Stage Fracture 2671.00 2672.00 0
2011-10-26 Acid Treatment 2671.00 2672.00 0
2011-10-27 Multi-Stage Fracture 2550.00 2551.00 0
2011-10-27 Acid Treatment 2550.00 2551.00 0
2011-10-24 Multi-Stage Fracture 4123.00 4124.00 0
2011-10-27 Multi-Stage Fracture 2540.00 2545.00 0
2011-10-27 Acid Treatment 2540.00 2545.00 0
2011-10-28 Multi-Stage Fracture 2422.50 2430.00 0
2011-10-28 Acid Treatment 2422.50 2430.00 0
2011-10-29 Multi-Stage Fracture 2295.00 2305.00 0
2011-10-29 Acid Treatment 2295.00 2305.00 0
2011-10-24 Acid Treatment 4123.00 4124.00 0
2011-10-24 Multi-Stage Fracture 4002.00 4003.00 0
2011-10-24 Acid Treatment 4002.00 4003.00 0
2011-10-24 Multi-Stage Fracture 3881.00 3882.00 0
2011-10-24 Acid Treatment 3881.00 3882.00 0
2011-10-24 Multi-Stage Fracture 3760.00 3761.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7861 0.0 0.0 0.0
2013 8549 0.0 0.0 0.0
2014 8125 0.0 0.0 0.0
2015 4776 0.0 0.0 0.0
2016 7366 0.0 0.0 0.0
2017 7028 0.0 0.0 0.0
2018 6227 0.0 0.0 0.0
2019 5364 0.0 0.0 0.0
2020 2104 0.0 0.0 0.0

For data sources see[6]

References