If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776120713040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.652708,"lon":-119.832409,"icon":""}]} |
Location: 04/13-07-077-12W6/0 | |
Location Alias: 04/13-07-77-12 W6M | |
Location Alias 2: 04/13-07-077-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 12 | |
Section: 07 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 4-8 HZ 104 PCOUPES 13-7-77-12 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0481701 | |
License Date: 2016-12-02 | |
License Status: Issued | |
Spud Date: 2016-12-14 | |
Final Drill Date: 2017-05-19 | |
Well Total Depth: 4080.00 m | |
Surface Hole Latitude: 55.652708 | |
Surface Hole Longitude: -119.832409 |
Date | Event |
---|---|
2016-12-02 | Obtained License |
2016-12-14 | Well Mode changed to Preset |
2016-12-15 | Surface Casing Operation Performed |
2017-05-09 | Direction Drilling Operation Performed - Deviate |
2017-05-14 | Direction Drilling Operation Performed - Horizontal |
2017-05-15 | Kick Occurred |
2017-05-19 | Finished Drilling |
2017-05-19 | Well Log Performed |
2017-05-19 | Well Mode changed to Drilled and Cased |
2017-05-20 | Well Log Performed |
2017-05-21 | Production Casing Operation Performed |
2017-05-22 | Rig Released |
2017-05-22 | Well Log Performed |
2017-07-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-25 | Perforation Treatment Performed - Open-Hole Completion |
2017-07-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-05 | Well Began Production |
2017-08-05 | Well Fluid changed to Gas |
2017-08-05 | Well Mode changed to Flowing |
2019-02-01 | Well Fluid changed to Gas |
2019-02-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-05-07 | Trinidad Drilling Ltd. | 438 | N/A | Drill To LD |
2016-12-14 | Trinidad Drilling Ltd. | 438 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-05-09 | 706.60 | Deviate (5 - 79 degrees) |
2017-05-14 | 2430.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-07-25 | Open Hole/Barefoot Completion | 4076.70 | 4080.00 | 0 |
2017-07-26 | Multi-Stage Fracture | 3638.50 | 3639.40 | 0 |
2017-07-26 | Multi-Stage Fracture | 3585.80 | 3586.70 | 0 |
2017-07-26 | Multi-Stage Fracture | 3533.20 | 3534.10 | 0 |
2017-07-26 | Multi-Stage Fracture | 3480.50 | 3481.40 | 0 |
2017-07-26 | Multi-Stage Fracture | 3415.30 | 3416.20 | 0 |
2017-07-26 | Multi-Stage Fracture | 3362.70 | 3363.60 | 0 |
2017-07-26 | Multi-Stage Fracture | 3310.10 | 3311.00 | 0 |
2017-07-26 | Multi-Stage Fracture | 3257.50 | 3258.40 | 0 |
2017-07-26 | Multi-Stage Fracture | 3205.10 | 3206.00 | 0 |
2017-07-26 | Multi-Stage Fracture | 3139.70 | 3140.60 | 0 |
2017-07-25 | Multi-Stage Fracture | 4065.30 | 4066.60 | 0 |
2017-07-26 | Multi-Stage Fracture | 3087.10 | 3088.00 | 0 |
2017-07-26 | Multi-Stage Fracture | 3035.20 | 3036.10 | 0 |
2017-07-26 | Multi-Stage Fracture | 2982.50 | 2983.40 | 0 |
2017-07-27 | Multi-Stage Fracture | 2929.80 | 2930.70 | 0 |
2017-07-27 | Multi-Stage Fracture | 2864.50 | 2865.40 | 0 |
2017-07-27 | Multi-Stage Fracture | 2811.90 | 2812.80 | 0 |
2017-07-27 | Multi-Stage Fracture | 2759.40 | 2760.30 | 0 |
2017-07-27 | Multi-Stage Fracture | 2706.70 | 2707.60 | 0 |
2017-07-27 | Multi-Stage Fracture | 2654.10 | 2655.00 | 0 |
2017-07-27 | Multi-Stage Fracture | 2588.70 | 2589.60 | 0 |
2017-07-25 | Multi-Stage Fracture | 4019.60 | 4020.50 | 0 |
2017-07-27 | Multi-Stage Fracture | 2536.00 | 2536.90 | 0 |
2017-07-27 | Multi-Stage Fracture | 2496.00 | 2496.90 | 0 |
2017-07-25 | Multi-Stage Fracture | 3967.10 | 3968.00 | 0 |
2017-07-25 | Multi-Stage Fracture | 3914.40 | 3915.30 | 0 |
2017-07-26 | Multi-Stage Fracture | 3861.70 | 3862.60 | 0 |
2017-07-26 | Multi-Stage Fracture | 3809.10 | 3810.00 | 0 |
2017-07-26 | Multi-Stage Fracture | 3743.80 | 3744.70 | 0 |
2017-07-26 | Multi-Stage Fracture | 3691.20 | 3692.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-07-25 | 2017-07-27 | 2,247 | 13,922 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 85.6125 | N/A | |||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 8.4652 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 5.7268 | N/A | ||
DWP-944 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0115 | N/A | |
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0115 | N/A | ||||
DWP-690 | Calfrac | Breaker | Hydrogen peroxide | 7722-84-1 | 100 | 0.0202 | N/A | |
Water | 7732-18-5 | 100 | 0.0202 | N/A | ||||
CalVisc | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1655 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-06-06 | 2017-06-14 | Surface Water - River | 5925 |
2017-01-26 | 2017-01-28 | Surface Water - Runoff | 505 |
2017-07-23 | 2017-07-27 | Surface Water - Runoff | 595 |
2017-01-28 | 2017-01-29 | Surface Water - Runoff | 310 |
2017-01-30 | 2017-02-03 | Surface Water - Runoff | 822 |
2017-07-23 | 2017-07-31 | Surface Water - Runoff | 1007 |
2017-02-03 | 2017-02-04 | Surface Water - Runoff | 138 |
2017-02-08 | 2017-02-16 | Surface Water - Runoff | 1234 |
2017-02-05 | 2017-02-07 | Surface Water - Runoff | 431 |
2017-03-09 | 2017-03-13 | Surface Water - Runoff | 863 |
2017-03-05 | 2017-03-07 | Surface Water - Runoff | 390 |
2017-03-07 | 2017-03-07 | Surface Water - Runoff | 57 |
2017-07-21 | 2017-07-29 | Recycled Fracturing Water (treated at well site) | 139 |
2017-03-11 | 2017-08-12 | Surface Water - Runoff | 154 |
2017-07-21 | 2017-08-02 | Recycled Fracturing Water (treated at well site) | 550 |
2017-03-11 | 2017-07-15 | Recycled Fracturing Water (treated at independent stand-alone facility) | 144 |
2017-05-29 | 2017-06-02 | Recycled Fracturing Water (treated at well site) | 357 |
2017-07-27 | 2017-07-29 | Surface Water - Runoff | 295 |
2017-07-21 | 2017-07-21 | Recycled Fracturing Water (treated at well site) | 4 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 2980 | 0.0 | 0.0 | 0.0 |
2018 | 8659 | 0.0 | 0.0 | 0.0 |
2019 | 8709 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-12-15 | No Incident Encountered | 0.00 | 0.00 |
2017-05-15 | Kick | 2447.00 | 3204.00 |
2017-07-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]