X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776120713030

Well Details

Well ID: 0776120713030
Loading map...
Location: 03/13-07-077-12W6/0
Location Alias: 03/13-07-77-12 W6M
Location Alias 2: 03/13-07-077-12 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 12
Section: 07
County/Municipality: Saddle Hills County
Well Name: BIR 4-8 HZ 103 PCOUPES 13-7-77-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0481693
License Date: 2016-12-02
License Status: Issued
Spud Date: 2016-12-11
Final Drill Date: 2017-05-04
Well Total Depth: 4404.00 m
Surface Hole Latitude: 55.652797
Surface Hole Longitude: -119.832409

For data sources see[1][2]

Well History

Date Event
2016-12-02 Obtained License
2016-12-11 Lost Circulation Occurred
2016-12-11 Well Mode changed to Preset
2016-12-12 Surface Casing Operation Performed
2017-04-23 Direction Drilling Operation Performed - Deviate
2017-04-29 Direction Drilling Operation Performed - Horizontal
2017-05-04 Finished Drilling
2017-05-04 Well Log Performed
2017-05-04 Well Mode changed to Drilled and Cased
2017-05-05 Kick Occurred
2017-05-05 Well Log Performed
2017-05-06 Production Casing Operation Performed
2017-05-07 Rig Released
2017-07-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-23 Perforation Treatment Performed - Open-Hole Completion
2017-07-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-05 Well Began Production
2017-08-05 Well Fluid changed to Gas
2017-08-05 Well Mode changed to Flowing
2019-02-01 Well Fluid changed to Gas
2019-02-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-12-11 Trinidad Drilling Ltd. 438 N/A Set Surface
2017-04-22 Trinidad Drilling Ltd. 438 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-04-23 1780.40 Deviate (5 - 79 degrees)
2017-04-29 2490.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-07-23 Open Hole/Barefoot Completion 4400.00 4404.00 0
2017-07-24 Multi-Stage Fracture 3962.00 3962.80 0
2017-07-24 Multi-Stage Fracture 3909.30 3910.10 0
2017-07-24 Multi-Stage Fracture 3856.70 3857.50 0
2017-07-24 Multi-Stage Fracture 3804.00 3804.80 0
2017-07-24 Multi-Stage Fracture 3751.30 3752.10 0
2017-07-24 Multi-Stage Fracture 3686.10 3686.90 0
2017-07-24 Multi-Stage Fracture 3633.40 3634.20 0
2017-07-24 Multi-Stage Fracture 3581.10 3581.90 0
2017-07-24 Multi-Stage Fracture 3528.40 3529.20 0
2017-07-24 Multi-Stage Fracture 3475.70 3476.50 0
2017-07-23 Multi-Stage Fracture 4388.60 4389.90 0
2017-07-24 Multi-Stage Fracture 3411.20 3412.00 0
2017-07-24 Multi-Stage Fracture 3358.50 3359.30 0
2017-07-24 Multi-Stage Fracture 3305.80 3306.60 0
2017-07-24 Multi-Stage Fracture 3253.50 3254.30 0
2017-07-24 Multi-Stage Fracture 3201.00 3201.80 0
2017-07-24 Multi-Stage Fracture 3148.40 3149.20 0
2017-07-25 Multi-Stage Fracture 3083.20 3084.00 0
2017-07-25 Multi-Stage Fracture 3030.90 3031.70 0
2017-07-25 Multi-Stage Fracture 2978.50 2979.30 0
2017-07-25 Multi-Stage Fracture 2926.60 2927.40 0
2017-07-23 Multi-Stage Fracture 4343.20 4344.00 0
2017-07-25 Multi-Stage Fracture 2873.90 2874.70 0
2017-07-25 Multi-Stage Fracture 2808.90 2809.70 0
2017-07-25 Multi-Stage Fracture 2756.20 2757.00 0
2017-07-25 Multi-Stage Fracture 2703.50 2704.30 0
2017-07-25 Multi-Stage Fracture 2650.90 2651.70 0
2017-07-25 Multi-Stage Fracture 2598.20 2599.00 0
2017-07-25 Multi-Stage Fracture 2558.20 2559.00 0
2017-07-23 Multi-Stage Fracture 4290.50 4291.30 0
2017-07-23 Multi-Stage Fracture 4237.90 4238.70 0
2017-07-23 Multi-Stage Fracture 4185.30 4186.10 0
2017-07-23 Multi-Stage Fracture 4132.70 4133.50 0
2017-07-23 Multi-Stage Fracture 4080.00 4080.80 0
2017-07-23 Multi-Stage Fracture 4014.70 4015.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-07-23 2017-07-25 2,242 15,321 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.8679 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 8.6998 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.7279 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0105 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0105 N/A
DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0163 N/A
Water 7732-18-5 100 0.0163 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.1754 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-06-06 2017-06-14 Surface Water - River 6520
2017-01-26 2017-01-28 Surface Water - Runoff 556
2017-07-23 2017-07-27 Surface Water - Runoff 655
2017-01-28 2017-01-29 Surface Water - Runoff 342
2017-01-30 2017-02-03 Surface Water - Runoff 905
2017-07-23 2017-07-31 Surface Water - Runoff 1108
2017-02-03 2017-02-04 Surface Water - Runoff 151
2017-02-08 2017-02-16 Surface Water - Runoff 1359
2017-02-05 2017-02-07 Surface Water - Runoff 474
2017-03-09 2017-03-13 Surface Water - Runoff 950
2017-03-05 2017-03-07 Surface Water - Runoff 429
2017-03-07 2017-03-07 Surface Water - Runoff 63
2017-07-21 2017-07-29 Recycled Fracturing Water (treated at well site) 153
2017-03-11 2017-08-12 Surface Water - Runoff 170
2017-07-21 2017-08-02 Recycled Fracturing Water (treated at well site) 605
2017-03-11 2017-07-15 Recycled Fracturing Water (treated at independent stand-alone facility) 158
2017-05-29 2017-06-02 Recycled Fracturing Water (treated at well site) 393
2017-07-27 2017-07-29 Surface Water - Runoff 325
2017-07-21 2017-07-21 Recycled Fracturing Water (treated at well site) 5

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2862 0.0 0.0 0.0
2018 8533 0.0 0.0 0.0
2019 8665 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-11 Lost Circulation 50.00 130.00
2017-05-05 Kick 4404.00 4404.00
2017-07-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References