X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776120415000

Well Details

Well ID: 0776120415000
Loading map...
Location: 00/15-04-077-12W6/0
Location Alias: 00/15-04-77-12 W6M
Location Alias 2: 00/15-04-077-12 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 12
Section: 04
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF 4-2 HZ PCOUPES 15-4-77-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0423903
License Date: 2010-09-24
License Status: Issued
Spud Date: 2010-10-02
Final Drill Date: 2010-10-23
Well Total Depth: 4825.00 m
Surface Hole Latitude: 55.639302
Surface Hole Longitude: -119.757271

For data sources see[1][2]

Well History

Date Event
2010-09-24 Obtained License
2010-10-03 Surface Casing Operation Performed
2010-10-05 Direction Drilling Operation Performed - Horizontal
2010-10-23 Finished Drilling
2010-10-23 Well Log Performed
2010-10-23 Well Mode changed to Drilled and Cased
2010-10-26 Liner Casing Operation Performed
2010-10-26 Production Casing Operation Performed
2010-10-27 Rig Released
2010-11-03 Well Log Performed
2010-11-05 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-05 Perforation Treatment Performed - Open-Hole Completion
2010-11-06 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-07 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-08 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-09 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-05 Well Began Production
2010-12-05 Well Fluid changed to Gas
2010-12-05 Well Mode changed to Flowing
2019-03-01 Well Fluid changed to Gas
2019-03-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-05 752.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-05 Open Hole/Barefoot Completion 4821.00 4825.00 0
2010-11-07 Multi-Stage Fracture 3625.10 3625.90 0
2010-11-07 Multi-Stage Fracture 3477.10 3477.90 0
2010-11-08 Multi-Stage Fracture 3328.00 3328.80 0
2010-11-08 Multi-Stage Fracture 3179.90 3180.70 0
2010-11-08 Multi-Stage Fracture 3017.90 3018.70 0
2010-11-08 Multi-Stage Fracture 2869.10 2869.90 0
2010-11-08 Multi-Stage Fracture 2720.20 2721.00 0
2010-11-09 Multi-Stage Fracture 2571.10 2571.90 0
2010-11-09 Multi-Stage Fracture 2448.10 2448.90 0
2010-11-05 Multi-Stage Fracture 4811.70 4812.50 0
2010-11-05 Multi-Stage Fracture 4669.00 4669.80 0
2010-11-05 Multi-Stage Fracture 4522.10 4522.90 0
2010-11-06 Multi-Stage Fracture 4372.50 4373.30 0
2010-11-06 Multi-Stage Fracture 4223.70 4224.50 0
2010-11-06 Multi-Stage Fracture 4074.60 4075.40 0
2010-11-07 Multi-Stage Fracture 3921.30 3922.10 0
2010-11-07 Multi-Stage Fracture 3773.10 3773.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 612 0.0 0.0 0.0
2011 8632 0.0 0.0 0.0
2012 8628 0.0 0.0 0.0
2013 8662 0.0 0.0 0.0
2014 8537 0.0 0.0 0.0
2015 7682 0.0 0.0 0.0
2016 8435 0.0 0.0 0.0
2017 8105 0.0 0.0 0.0
2018 8232 0.0 0.0 0.0
2019 8517 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[6]

References