X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776120403000

Well Details

Well ID: 0776120403000
Loading map...
Location: 00/03-04-077-12W6/0
Location Alias: 00/03-04-77-12 W6M
Location Alias 2: 00/03-04-077-12 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 12
Section: 04
County/Municipality: Saddle Hills County
Well Name: BIR 4-8 HZ PCOUPES 3-4-77-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0478755
License Date: 2016-01-13
License Status: Amended
Spud Date: 2016-12-02
Final Drill Date: 2017-03-17
Well Total Depth: 5025.00 m
Surface Hole Latitude: 55.653121
Surface Hole Longitude: -119.833525

For data sources see[1][2]

Well History

Date Event
2016-01-13 Obtained License
2016-12-02 Well Mode changed to Preset
2016-12-03 Lost Circulation Occurred
2016-12-05 Surface Casing Operation Performed
2017-03-06 Direction Drilling Operation Performed - Deviate
2017-03-12 Direction Drilling Operation Performed - Horizontal
2017-03-17 Finished Drilling
2017-03-17 Well Log Performed
2017-03-17 Well Mode changed to Drilled and Cased
2017-03-18 Well Log Performed
2017-03-19 Production Casing Operation Performed
2017-03-19 Rig Released
2017-07-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-27 Perforation Treatment Performed - Open-Hole Completion
2017-07-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-01 Well Fluid changed to Gas
2017-08-01 Well Mode changed to Testing
2017-08-05 Well Began Production
2017-08-05 Well Fluid changed to Gas
2017-08-05 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-12-02 Trinidad Drilling Ltd. 438 N/A Set Surface
2017-03-06 Trinidad Drilling Ltd. 438 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-03-06 819.30 Deviate (5 - 79 degrees)
2017-03-12 2589.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-07-27 Open Hole/Barefoot Completion 5022.00 5025.00 0
2017-07-28 Multi-Stage Fracture 4598.00 4598.80 0
2017-07-28 Multi-Stage Fracture 4532.90 4533.70 0
2017-07-28 Multi-Stage Fracture 4480.80 4481.60 0
2017-07-28 Multi-Stage Fracture 4428.30 4429.10 0
2017-07-28 Multi-Stage Fracture 4375.80 4376.60 0
2017-07-28 Multi-Stage Fracture 4323.20 4324.00 0
2017-07-28 Multi-Stage Fracture 4271.10 4271.90 0
2017-07-29 Multi-Stage Fracture 4218.60 4219.40 0
2017-07-29 Multi-Stage Fracture 4166.10 4166.90 0
2017-07-29 Multi-Stage Fracture 4113.60 4114.40 0
2017-07-27 Multi-Stage Fracture 5009.80 5011.10 0
2017-07-29 Multi-Stage Fracture 4048.40 4049.20 0
2017-07-29 Multi-Stage Fracture 3995.90 3996.70 0
2017-07-29 Multi-Stage Fracture 3943.40 3944.20 0
2017-07-29 Multi-Stage Fracture 3891.70 3892.50 0
2017-07-29 Multi-Stage Fracture 3839.10 3839.90 0
2017-07-29 Multi-Stage Fracture 3786.90 3787.70 0
2017-07-29 Multi-Stage Fracture 3734.40 3735.20 0
2017-07-29 Multi-Stage Fracture 3681.90 3682.70 0
2017-07-29 Multi-Stage Fracture 3629.40 3630.20 0
2017-07-29 Multi-Stage Fracture 3564.30 3565.10 0
2017-07-27 Multi-Stage Fracture 4965.10 4965.90 0
2017-07-29 Multi-Stage Fracture 3511.80 3512.60 0
2017-07-29 Multi-Stage Fracture 3459.50 3460.30 0
2017-07-29 Multi-Stage Fracture 3407.50 3408.30 0
2017-07-29 Multi-Stage Fracture 3355.00 3355.80 0
2017-07-30 Multi-Stage Fracture 3302.50 3303.20 0
2017-07-30 Multi-Stage Fracture 3250.00 3250.80 0
2017-07-30 Multi-Stage Fracture 3197.40 3198.20 0
2017-07-30 Multi-Stage Fracture 3144.90 3145.70 0
2017-07-30 Multi-Stage Fracture 3079.80 3080.70 0
2017-07-30 Multi-Stage Fracture 3027.20 3028.00 0
2017-07-28 Multi-Stage Fracture 4912.60 4913.40 0
2017-07-30 Multi-Stage Fracture 2974.70 2975.50 0
2017-07-30 Multi-Stage Fracture 2922.20 2923.00 0
2017-07-30 Multi-Stage Fracture 2869.70 2870.60 0
2017-07-30 Multi-Stage Fracture 2817.20 2818.00 0
2017-07-30 Multi-Stage Fracture 2764.80 2765.60 0
2017-07-30 Multi-Stage Fracture 2712.20 2713.00 0
2017-07-30 Multi-Stage Fracture 2672.30 2673.10 0
2017-07-28 Multi-Stage Fracture 4860.50 4861.30 0
2017-07-28 Multi-Stage Fracture 4801.10 4801.90 0
2017-07-28 Multi-Stage Fracture 4755.60 4756.40 0
2017-07-28 Multi-Stage Fracture 4703.10 4703.90 0
2017-07-28 Multi-Stage Fracture 4650.60 4651.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-07-27 2017-07-30 2,382 18,332 N/A
2 2017-07-28 2017-07-29 2,382 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 89.0908 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 7.7377 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 3.3299 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0113 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0113 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.1275 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.1275 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1275 N/A
2 DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0228 N/A
Water 7732-18-5 100 0.0228 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.2008 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-06-06 2017-06-14 Surface Water - River 7802
2017-01-26 2017-01-28 Surface Water - Runoff 665
2017-07-23 2017-07-27 Surface Water - Runoff 783
2017-01-28 2017-01-29 Surface Water - Runoff 409
2017-01-30 2017-02-03 Surface Water - Runoff 1083
2017-07-23 2017-07-31 Surface Water - Runoff 1326
2017-02-03 2017-02-04 Surface Water - Runoff 181
2017-02-08 2017-02-16 Surface Water - Runoff 1626
2017-02-05 2017-02-07 Surface Water - Runoff 567
2017-03-09 2017-03-13 Surface Water - Runoff 1137
2017-03-05 2017-03-07 Surface Water - Runoff 514
2017-03-07 2017-03-07 Surface Water - Runoff 75
2017-07-21 2017-07-29 Recycled Fracturing Water (treated at well site) 183
2017-03-11 2017-08-12 Surface Water - Runoff 203
2017-07-21 2017-08-02 Recycled Fracturing Water (treated at well site) 724
2017-03-11 2017-07-15 Recycled Fracturing Water (treated at independent stand-alone facility) 189
2017-05-29 2017-06-02 Recycled Fracturing Water (treated at well site) 470
2017-07-27 2017-07-29 Surface Water - Runoff 389
2017-07-21 2017-07-21 Recycled Fracturing Water (treated at well site) 6
2017-07-21 2017-07-21 Recycled Fracturing Water (treated at well site) 1

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2834 0.0 0.0 0.0
2018 8312 0.0 0.0 0.0
2019 8694 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-03 Lost Circulation 31.00 128.00
2017-03-19 No Incident Encountered 0.00 0.00
2017-07-30 No Incident Encountered 0.00 0.00

For data sources see[10]

References