X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776113504020

Well Details

Well ID: 0776113504020
Loading map...
Location: 02/04-35-077-11W6/0
Location Alias: 02/04-35-77-11 W6M
Location Alias 2: 02/04-35-077-11 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 11
Section: 35
County/Municipality: Saddle Hills County
Well Name: BIR 2-2 HZ 102 PCOUPES 4-35-77-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0491249
License Date: 2018-10-01
License Status: Issued
Spud Date: 2018-11-22
Final Drill Date: 2018-12-03
Well Total Depth: 3966.00 m
Surface Hole Latitude: 55.724070
Surface Hole Longitude: -119.589023

For data sources see[1][2]

Well History

Date Event
2018-10-01 Obtained License
2018-11-23 Surface Casing Operation Performed
2018-11-24 Direction Drilling Operation Performed - Deviate
2018-11-29 Direction Drilling Operation Performed - Horizontal
2018-12-03 Finished Drilling
2018-12-03 Well Log Performed
2018-12-03 Well Mode changed to Drilled and Cased
2018-12-04 Production Casing Operation Performed
2018-12-04 Well Log Performed
2018-12-05 Rig Released
2019-01-12 Perforation Treatment Performed - Jet Perforation
2019-01-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-13 Perforation Treatment Performed - Jet Perforation
2019-01-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-14 Perforation Treatment Performed - Jet Perforation
2019-01-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-15 Perforation Treatment Performed - Jet Perforation
2019-01-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-16 Perforation Treatment Performed - Jet Perforation
2019-01-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-17 Perforation Treatment Performed - Jet Perforation
2019-01-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-05 Well Fluid changed to Crude Oil
2019-02-05 Well Mode changed to Drilling and Completing
2019-03-26 Well Began Production
2019-03-26 Well Fluid changed to Crude Oil
2019-03-26 Well Mode changed to Flowing
2019-10-15 Well Fluid changed to Crude Oil
2019-10-15 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-11-22 Trinidad Drilling Ltd. 60 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-11-24 695.70 Deviate (5 - 79 degrees)
2018-11-29 2381.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-12 Perforation 3914.30 3914.60 3
2019-01-13 Multi-Stage Fracture 3739.30 3814.60 0
2019-01-13 Perforation 3714.30 3714.60 3
2019-01-13 Perforation 3689.30 3689.60 3
2019-01-13 Perforation 3664.30 3664.60 3
2019-01-13 Perforation 3639.30 3639.60 3
2019-01-13 Multi-Stage Fracture 3639.30 3714.60 0
2019-01-14 Perforation 3614.30 3614.60 3
2019-01-14 Perforation 3589.30 3589.60 3
2019-01-14 Perforation 3564.30 3564.60 3
2019-01-14 Perforation 3539.30 3539.60 3
2019-01-12 Perforation 3889.30 3889.60 3
2019-01-14 Multi-Stage Fracture 3539.30 3614.60 0
2019-01-14 Perforation 3514.30 3514.60 3
2019-01-14 Perforation 3489.30 3489.60 3
2019-01-14 Perforation 3464.30 3464.60 3
2019-01-14 Perforation 3439.30 3439.60 3
2019-01-14 Multi-Stage Fracture 3439.30 3514.60 0
2019-01-14 Perforation 3414.30 3414.60 3
2019-01-14 Perforation 3389.30 3389.60 3
2019-01-14 Perforation 3364.30 3364.60 3
2019-01-14 Perforation 3339.30 3339.60 3
2019-01-12 Perforation 3864.30 3864.60 3
2019-01-14 Multi-Stage Fracture 3339.30 3414.60 0
2019-01-15 Perforation 3314.30 3314.60 3
2019-01-15 Perforation 3289.30 3289.60 3
2019-01-15 Perforation 3264.30 3264.60 3
2019-01-15 Perforation 3239.30 3239.60 3
2019-01-15 Multi-Stage Fracture 3239.30 3314.60 0
2019-01-15 Perforation 3214.30 3214.60 3
2019-01-15 Perforation 3189.30 3189.60 3
2019-01-15 Perforation 3164.30 3164.60 3
2019-01-15 Perforation 3139.30 3139.60 3
2019-01-12 Perforation 3839.30 3839.60 3
2019-01-15 Multi-Stage Fracture 3139.30 3214.60 0
2019-01-15 Perforation 3114.30 3114.60 3
2019-01-15 Perforation 3089.30 3089.60 3
2019-01-15 Perforation 3064.30 3064.60 3
2019-01-15 Perforation 3039.30 3039.60 3
2019-01-16 Multi-Stage Fracture 3039.30 3114.60 0
2019-01-16 Perforation 3014.30 3014.60 3
2019-01-16 Perforation 2989.30 2989.60 3
2019-01-16 Perforation 2964.30 2964.60 3
2019-01-16 Perforation 2939.30 2939.60 3
2019-01-12 Multi-Stage Fracture 3839.30 3914.60 0
2019-01-16 Multi-Stage Fracture 2939.30 3014.60 0
2019-01-16 Perforation 2914.30 2914.60 3
2019-01-16 Perforation 2889.30 2889.60 3
2019-01-16 Perforation 2864.30 2864.60 3
2019-01-16 Perforation 2839.30 2839.60 3
2019-01-16 Multi-Stage Fracture 2839.30 2914.60 0
2019-01-16 Perforation 2814.30 2814.60 3
2019-01-16 Perforation 2789.30 2789.60 3
2019-01-16 Perforation 2764.30 2764.60 3
2019-01-16 Perforation 2739.30 2739.60 3
2019-01-13 Perforation 3814.30 3814.60 3
2019-01-17 Multi-Stage Fracture 2739.30 2814.60 0
2019-01-17 Perforation 2714.30 2714.60 3
2019-01-17 Perforation 2689.30 2689.60 3
2019-01-17 Perforation 2664.30 2664.60 3
2019-01-17 Perforation 2639.30 2639.60 3
2019-01-17 Multi-Stage Fracture 2639.30 2714.60 0
2019-01-17 Perforation 2614.30 2614.60 3
2019-01-17 Perforation 2589.30 2589.60 3
2019-01-17 Perforation 2564.30 2564.60 3
2019-01-17 Perforation 2539.30 2539.60 3
2019-01-13 Perforation 3789.30 3789.60 3
2019-01-17 Multi-Stage Fracture 2539.30 2614.60 0
2019-01-17 Perforation 2514.30 2514.60 3
2019-01-17 Perforation 2489.30 2489.60 3
2019-01-17 Perforation 2464.30 2464.60 3
2019-01-17 Perforation 2439.30 2439.60 3
2019-01-17 Multi-Stage Fracture 2439.30 2514.60 0
2019-01-13 Perforation 3764.30 3764.60 3
2019-01-13 Perforation 3739.30 3739.60 3

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-12 2019-01-17 2,146 11,941 N/A
2 2019-01-16 2019-01-17 2,146 0 N/A
3 2019-01-15 2019-01-17 2,146 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.8135 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.2218 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.7618 N/A
Enviro-Syn HCR Fluid Energy Group Ltd. Acid Non-Hazardous Ingredients Trade Secret 100 0.3904 N/A
SaniFrac 8844. Biocide Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0108 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0108 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0108 N/A
Polyethylene glycol 25322-68-3 100 0.0108 N/A
Sodium bromide 7647-15-6 100 0.0108 N/A
DWP-641. Friction Reducer Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0484 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0484 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0484 N/A
2 DWP-690. Slickwater Breaker Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0081 N/A
Water 7732-18-5 100 0.0081 N/A
3 CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.1416 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7210 0.0 0.0 0.0
2020 1656 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-05 No Incident Encountered 0.00 0.00
2019-02-05 No Incident Encountered 0.00 0.00

For data sources see[9]

References