If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776113207000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.714059,"lon":-119.664855,"icon":""}]} |
Location: 00/07-32-077-11W6/0 | |
Location Alias: 00/07-32-77-11 W6M | |
Location Alias 2: 00/07-32-077-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 11 | |
Section: 32 | |
County/Municipality: Saddle Hills County | |
Well Name: CDN ABRAXAS PCOUPES IN 7-32MU-77-11 | |
Operator Name: TAQA North Ltd. | |
License Number: 0010732 | |
License Date: 1956-01-03 | |
License Status: Suspension | |
Spud Date: 1956-02-04 | |
Final Drill Date: 1956-06-08 | |
Well Total Depth: 2377.40 m | |
Surface Hole Latitude: 55.714059 | |
Surface Hole Longitude: -119.664855 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1956-01-03 | Obtained License |
1956-02-04 | Direction Drilling Operation Performed - 98 |
1956-02-10 | Drill Stem Test Performed |
1956-02-17 | Drill Stem Test Performed |
1956-02-19 | Drill Stem Test Performed |
1956-02-26 | Drill Stem Test Performed |
1956-03-06 | Drill Stem Test Performed |
1956-03-07 | Drill Stem Test Performed |
1956-04-25 | Drill Stem Test Performed |
1956-04-26 | Drill Stem Test Performed |
1956-04-28 | Drill Stem Test Performed |
1956-04-30 | Drill Stem Test Performed |
1956-05-06 | Drill Stem Test Performed |
1956-05-09 | Drill Stem Test Performed |
1956-05-10 | Drill Stem Test Performed |
1956-05-31 | Drill Stem Test Performed |
1956-06-01 | Perforation Treatment Performed - Bullet Perforation |
1956-06-08 | Finished Drilling |
1956-06-11 | Drill Stem Test Performed |
1956-06-11 | Production Casing Operation Performed |
1956-06-12 | Well Mode changed to Drilled and Cased |
1959-10-08 | Perforation Treatment Performed - Cement Squeeze |
1959-10-10 | Perforation Treatment Performed - Jet Perforation |
1959-10-16 | Perforation Treatment Performed - Jet Perforation |
1959-10-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-12-05 | Well Began Production |
1959-12-05 | Well Fluid changed to Gas |
1959-12-05 | Well Mode changed to Flowing |
1961-04-07 | Well Began Injection |
1961-04-07 | Well Fluid changed to Water |
1961-04-07 | Well Type changed to Disposal |
1961-12-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-11-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-11-27 | Perforation Treatment Performed - Jet Perforation |
1965-11-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-09-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1971-08-31 | Well Fluid changed to Water |
1971-08-31 | Well Mode changed to Suspended |
1971-08-31 | Well Type changed to Disposal |
1971-09-01 | Well Fluid changed to Water |
1971-09-01 | Well Type changed to Disposal |
1971-11-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-02-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-02-07 | Perforation Treatment Performed - Cement Squeeze |
1976-02-09 | Perforation Treatment Performed - Jet Perforation |
1976-02-15 | Perforation Treatment Performed - Acid Wash - No Pressure |
1976-02-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-10-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-08-25 | Perforation Treatment Performed - Jet Perforation |
1989-09-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-11-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-10-16 | Well Log Performed |
1996-12-11 | Well Fluid changed to Water |
1996-12-11 | Well Mode changed to Closed |
1996-12-11 | Well Type changed to Disposal |
1997-01-07 | Well Fluid changed to Water |
1997-01-07 | Well Type changed to Disposal |
2007-03-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-03-31 | Plug Back Performed |
2007-03-31 | Well Fluid changed to Water |
2007-03-31 | Well Mode changed to Abandoned Zone |
2007-03-31 | Well Type changed to Disposal |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1956-02-04 | 1270.70 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1956-06-01 | Bullet Perforation | 1537.70 | 1538.30 | 13 |
1967-09-23 | Acid Treatment | 1537.40 | 1544.10 | 0 |
1971-11-05 | Acid Treatment | 1537.40 | 1544.10 | 0 |
1976-02-07 | Acid Treatment | 969.90 | 972.90 | 0 |
1976-02-07 | Cement Squeeze | 969.90 | 972.90 | 0 |
1976-02-09 | Perforation | 956.80 | 958.60 | 7 |
1976-02-09 | Perforation | 966.50 | 968.30 | 7 |
1976-02-09 | Perforation | 983.00 | 984.20 | 7 |
1976-02-15 | Acid Wash | 956.80 | 984.20 | 0 |
1976-02-18 | Acid Treatment | 1537.40 | 1544.10 | 0 |
1977-10-25 | Acid Treatment | 1537.40 | 1544.10 | 0 |
1959-10-08 | Cement Squeeze | 1537.70 | 1541.40 | 0 |
1981-02-21 | Acid Treatment | 1537.40 | 1544.10 | 0 |
1989-08-25 | Perforation | 1537.40 | 1544.70 | 13 |
1989-09-09 | Acid Treatment | 1537.40 | 1544.70 | 0 |
1991-11-29 | Acid Treatment | 1537.40 | 1544.70 | 0 |
2007-03-31 | Packing Device Capped w/Cement | 1527.00 | 1535.00 | 0 |
1959-10-10 | Perforation | 1537.40 | 1538.90 | 13 |
1959-10-16 | Perforation | 969.90 | 972.90 | 13 |
1959-10-17 | Acid Treatment | 969.90 | 972.90 | 0 |
1961-12-06 | Acid Treatment | 1537.40 | 1538.90 | 0 |
1962-11-27 | Perforation | 1541.10 | 1544.10 | 7 |
1962-11-27 | Acid Treatment | 1541.10 | 1544.10 | 0 |
1965-11-09 | Acid Treatment | 1541.10 | 1544.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 0 | 0.0 | 0.0 | 0.0 |
1969 | 0 | 0.0 | 0.0 | 0.0 |
1970 | 0 | 0.0 | 0.0 | 0.0 |
1971 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 0 | 0.0 | 0.0 | 0.0 |
1974 | 0 | 0.0 | 0.0 | 0.0 |
1975 | 0 | 0.0 | 0.0 | 0.0 |
1976 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 0 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
1988 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]