If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776112010000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.688963,"lon":-119.664117,"icon":""}]} |
Location: 00/10-20-077-11W6/0 | |
Location Alias: 00/10-20-77-11 W6M | |
Location Alias 2: 00/10-20-077-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 11 | |
Section: 20 | |
County/Municipality: Saddle Hills County | |
Well Name: CNRL PCOUPES 10-20-77-11 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0052118 | |
License Date: 1974-12-05 | |
License Status: Suspension | |
Spud Date: 1974-12-13 | |
Final Drill Date: 1974-12-24 | |
Well Total Depth: 1786.10 m | |
Surface Hole Latitude: 55.688963 | |
Surface Hole Longitude: -119.664117 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1974-12-05 | Obtained License |
1974-12-24 | Finished Drilling |
1974-12-24 | Well Mode changed to Drilled and Cased |
1974-12-25 | Production Casing Operation Performed |
1975-02-20 | Perforation Treatment Performed - Jet Perforation |
1975-02-20 | Well Log Performed |
1975-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-02-21 | Perforation Treatment Performed - Acid Wash - No Pressure |
1975-02-21 | Perforation Treatment Performed - Fractured |
1975-08-01 | Well Began Production |
1975-08-01 | Well Fluid changed to Crude Oil |
1975-08-01 | Well Mode changed to Flowing |
1977-06-21 | Well Fluid changed to Crude Oil |
1977-06-21 | Well Mode changed to Pumping |
1986-05-06 | Well Log Performed |
1987-05-06 | Well Log Performed |
1987-05-07 | Well Log Performed |
1987-06-11 | Well Began Injection |
1987-06-11 | Well Fluid changed to Water |
1987-06-11 | Well Type changed to Injection |
1994-10-23 | Well Log Performed |
1994-10-26 | Well Log Performed |
1994-10-30 | Perforation Treatment Performed - Jet Perforation |
1994-10-30 | Perforation Treatment Performed - Remedial Casing |
2010-05-31 | Well Fluid changed to Water |
2010-05-31 | Well Mode changed to Suspended |
2010-05-31 | Well Type changed to Injection |
2010-10-22 | Well Log Performed |
2010-10-23 | Well Log Performed |
2010-10-27 | Well Log Performed |
2010-10-30 | Perforation Treatment Performed - Jet Perforation |
2010-10-31 | Perforation Treatment Performed - Remedial Casing |
2011-01-01 | Well Fluid changed to Water |
2011-01-01 | Well Type changed to Injection |
2012-01-14 | Perforation Treatment Performed - Chemical Squeeze |
2012-05-17 | Perforation Treatment Performed - Chemical Squeeze |
2012-07-07 | Perforation Treatment Performed - Jet Perforation |
2012-07-07 | Well Log Performed |
2012-07-09 | Perforation Treatment Performed - Fractured |
2013-12-31 | Well Fluid changed to Water |
2013-12-31 | Well Mode changed to Suspended |
2013-12-31 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-02-20 | Perforation | 1771.80 | 1773.90 | 7 |
2010-10-31 | Remedial Casing Cementing | 780.20 | 1011.00 | 0 |
2012-01-14 | Chemical Squeeze | 1771.80 | 1775.50 | 0 |
2012-05-17 | Chemical Squeeze | 1771.80 | 1775.50 | 0 |
2012-07-07 | Perforation | 1771.50 | 1773.50 | 10 |
2012-07-09 | Fracture | 1771.50 | 1775.50 | 0 |
1975-02-20 | Perforation | 1774.50 | 1775.50 | 7 |
1975-02-21 | Acid Wash | 1771.80 | 1775.50 | 0 |
1975-02-21 | Acid Treatment | 1771.80 | 1775.50 | 0 |
1975-02-21 | Fracture | 1771.80 | 1775.50 | 0 |
1994-10-30 | Perforation | 780.20 | 780.60 | 13 |
1994-10-30 | Remedial Casing Cementing | 780.20 | 780.60 | 0 |
2010-10-30 | Perforation | 780.20 | 780.60 | 13 |
2010-10-30 | Perforation | 1010.00 | 1011.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1975 | 2761 | 0.0 | 0.0 | 0.0 |
1976 | 5605 | 0.0 | 0.0 | 0.0 |
1977 | 8141 | 0.0 | 0.0 | 0.0 |
1978 | 8102 | 0.0 | 0.0 | 0.0 |
1979 | 5796 | 0.0 | 0.0 | 0.0 |
1980 | 3472 | 0.0 | 0.0 | 0.0 |
1981 | 6758 | 0.0 | 0.0 | 0.0 |
1982 | 6991 | 0.0 | 0.0 | 0.0 |
1983 | 8156 | 0.0 | 0.0 | 0.0 |
1984 | 8344 | 0.0 | 0.0 | 0.0 |
1985 | 7950 | 0.0 | 0.0 | 0.0 |
1986 | 7493 | 0.0 | 0.0 | 0.0 |
1987 | 1457 | 0.0 | 0.0 | 0.0 |
1988 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]