X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776111206002

Well Details

Well ID: 0776111206002
Loading map...
Location: 00/06-12-077-11W6/2
Location Alias: 00/06-12-77-11 W6M
Location Alias 2: 00/06-12-077-11 W6/02
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 11
Section: 12
County/Municipality: Saddle Hills County
Well Name: NCO PCOUPES 6-12-77-11
Operator Name: Canadian Natural Resources Limited
License Number: 0169346
License Date: 1994-08-09
License Status: Amended
Spud Date: 1994-10-06
Final Drill Date: 1994-10-23
Well Total Depth: 2280.00 m
Surface Hole Latitude: 55.656253
Surface Hole Longitude: -119.568034

For data sources see[1][2]

Well History

Date Event
1994-08-09 Obtained License
1994-10-07 Surface Casing Operation Performed
1994-10-23 Finished Drilling
1994-10-23 Well Mode changed to Drilled and Cased
1994-10-24 Well Log Performed
1994-10-26 Production Casing Operation Performed
1994-10-27 Rig Released
1994-11-17 Perforation Treatment Performed - Jet Perforation
1994-11-18 Perforation Treatment Performed - Cement Squeeze
1994-11-23 Perforation Treatment Performed - Jet Perforation
1994-11-27 Perforation Treatment Performed - Fractured
1994-12-07 Perforation Treatment Performed - Cement Plug
1994-12-07 Perforation Treatment Performed - Jet Perforation
1994-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-08 Perforation Treatment Performed - Cement Squeeze
1994-12-13 Perforation Treatment Performed - Jet Perforation
1995-01-05 Perforation Treatment Performed - Cement Plug
1995-01-05 Perforation Treatment Performed - Jet Perforation
1995-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-06 Perforation Treatment Performed - Cement Squeeze
1995-01-11 Perforation Treatment Performed - Jet Perforation
1995-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-14 Perforation Treatment Performed - Fractured
1995-06-02 Well Began Production
1995-06-02 Well Fluid changed to Gas
1995-06-02 Well Mode changed to Flowing
1997-06-16 Perforation Treatment Performed - Jet Perforation
1997-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-11 Well Fluid changed to Gas
1997-08-11 Well Mode changed to Flowing
2001-03-19 Perforation Treatment Performed - Jet Perforation
2001-03-21 Perforation Treatment Performed - Fractured
2006-12-31 Well Fluid changed to Gas
2006-12-31 Well Mode changed to Suspended
2010-01-20 Well Log Performed
2010-01-21 Perforation Treatment Performed - Cement Squeeze
2010-01-21 Plug Back Performed
2010-01-21 Well Fluid changed to Gas
2010-01-21 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-11-17 Perforation 1308.50 1310.00 13
1994-12-13 Perforation 1954.00 1956.50 14
1995-01-05 Cement Plug 1922.00 1934.30 0
1995-01-05 Perforation 1954.00 1956.50 14
1995-01-05 Perforation 1441.00 1442.00 13
1995-01-05 Perforation 1462.00 1463.00 13
1995-01-06 Acid Treatment 1441.00 1463.00 0
1995-01-06 Cement Squeeze 1441.00 1463.00 0
1995-01-11 Perforation 1445.50 1449.00 18
1995-01-14 Acid Treatment 1445.50 1449.00 0
1995-01-14 Fracture 1445.50 1449.00 0
1994-11-18 Cement Squeeze 1308.50 1310.00 0
1997-06-16 Perforation 1791.50 1795.00 17
1997-06-17 Acid Treatment 1791.50 1795.00 0
1997-07-09 Acid Treatment 1445.50 1449.00 0
2001-03-19 Perforation 1445.50 1449.00 20
2001-03-21 Fracture 1445.50 1449.00 0
2010-01-21 Cement Squeeze 1445.50 1449.00 0
1994-11-23 Perforation 2002.00 2007.00 17
1994-11-27 Fracture 2002.00 2007.00 0
1994-12-07 Cement Plug 1972.30 1987.70 0
1994-12-07 Perforation 1920.00 1921.00 13
1994-12-07 Perforation 1948.00 1949.00 13
1994-12-08 Acid Treatment 1920.00 1949.00 0
1994-12-08 Cement Squeeze 1920.00 1949.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 4071 0.0 0.0 0.0
1996 7754 0.0 0.0 0.0
1997 5513 0.0 0.0 0.0
1998 5717 0.0 0.0 0.0
1999 6436 0.0 0.0 0.0
2000 2393 0.0 0.0 0.0
2004 71 0.0 0.0 0.0

For data sources see[5]

References