If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776110708002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.65432,"lon":-119.682582,"icon":""}]} |
Location: 00/08-07-077-11W6/2 | |
Location Alias: 00/08-07-77-11 W6M | |
Location Alias 2: 00/08-07-077-11 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 11 | |
Section: 07 | |
County/Municipality: Saddle Hills County | |
Well Name: NORCEN PCOUPES 8-7-77-11 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0198308 | |
License Date: 1997-02-20 | |
License Status: Issued | |
Spud Date: 1997-03-18 | |
Final Drill Date: 1997-04-17 | |
Well Total Depth: 2405.00 m | |
Surface Hole Latitude: 55.654320 | |
Surface Hole Longitude: -119.682582 |
Date | Event |
---|---|
1997-02-20 | Obtained License |
1997-03-21 | Surface Casing Operation Performed |
1997-03-30 | Plug Back Performed |
1997-04-01 | Direction Drilling Operation Performed - Sidetrack Fish |
1997-04-17 | Finished Drilling |
1997-04-17 | Well Mode changed to Drilled and Cased |
1997-04-18 | Well Log Performed |
1997-04-20 | Production Casing Operation Performed |
1997-04-21 | Rig Released |
1997-05-02 | Well Log Performed |
1997-06-15 | Well Log Performed |
1997-06-16 | Perforation Treatment Performed - Jet Perforation |
1997-06-16 | Well Log Performed |
1997-06-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-07-29 | Perforation Treatment Performed - Jet Perforation |
2007-07-29 | Well Log Performed |
2007-07-31 | Perforation Treatment Performed - Fractured |
2007-09-21 | Well Began Production |
2007-09-21 | Well Fluid changed to Gas |
2007-09-21 | Well Mode changed to Flowing |
2018-01-01 | Well Fluid changed to Gas |
2018-01-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1997-04-01 | 1293.00 | Sidetrack fish |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-06-16 | Perforation | 2363.30 | 2364.80 | 13 |
1997-06-18 | Acid Treatment | 2363.30 | 2364.80 | 0 |
2007-07-29 | Perforation | 2105.00 | 2107.00 | 17 |
2007-07-31 | Fracture | 2105.00 | 2107.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 2448 | 0.0 | 0.0 | 0.0 |
2008 | 6312 | 0.0 | 0.0 | 0.0 |
2009 | 6792 | 0.0 | 0.0 | 0.0 |
2010 | 4804 | 0.0 | 0.0 | 0.0 |
2011 | 3192 | 0.0 | 0.0 | 0.0 |
2012 | 5809 | 0.0 | 0.0 | 0.0 |
2013 | 5209 | 0.0 | 0.0 | 0.0 |
2014 | 5020 | 0.0 | 0.0 | 0.0 |
2015 | 3412 | 0.0 | 0.0 | 0.0 |
2016 | 3530 | 0.0 | 0.0 | 0.0 |
2017 | 5433 | 0.0 | 0.0 | 0.0 |
2018 | 8394 | 0.0 | 0.0 | 0.0 |
2019 | 8015 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]