X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776102016020

Well Details

Well ID: 0776102016020
Loading map...
Location: 02/16-20-077-10W6/0
Location Alias: 02/16-20-77-10 W6M
Location Alias 2: 02/16-20-077-10 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 10
Section: 20
County/Municipality: Saddle Hills County
Well Name: TQN ET AL HZ 102 PCOUPES 16-20-77-10
Operator Name: TAQA North Ltd.
License Number: 0436174
License Date: 2011-08-19
License Status: Issued
Spud Date: 2011-11-26
Final Drill Date: 2011-12-13
Well Total Depth: 3596.00 m
Surface Hole Latitude: 55.681132
Surface Hole Longitude: -119.508824

For data sources see[1][2]

Well History

Date Event
2011-08-19 Obtained License
2011-11-27 Surface Casing Operation Performed
2011-12-02 Direction Drilling Operation Performed - Deviate
2011-12-07 Direction Drilling Operation Performed - Horizontal
2011-12-07 Well Log Performed
2011-12-12 Well Log Performed
2011-12-13 Finished Drilling
2011-12-13 Perforation Treatment Performed - Open-Hole Completion
2011-12-13 Well Mode changed to Drilled and Cased
2011-12-17 Production Casing Operation Performed
2011-12-19 Rig Released
2012-01-28 Well Log Performed
2012-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-23 Well Began Production
2012-11-23 Well Fluid changed to Gas
2012-11-23 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-02 1803.60 Deviate (5 - 79 degrees)
2011-12-07 2441.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-13 Open Hole/Barefoot Completion 2405.00 3596.00 0
2012-02-29 Multi-Stage Fracture 2572.80 2573.50 0
2012-02-24 Multi-Stage Fracture 3533.30 3533.90 0
2012-02-24 Multi-Stage Fracture 3412.40 3413.00 0
2012-02-24 Multi-Stage Fracture 3291.60 3292.30 0
2012-02-24 Multi-Stage Fracture 3171.70 3172.40 0
2012-02-24 Multi-Stage Fracture 3051.90 3052.60 0
2012-02-24 Multi-Stage Fracture 2933.00 2933.60 0
2012-02-24 Multi-Stage Fracture 2813.10 2813.70 0
2012-02-24 Multi-Stage Fracture 2693.70 2694.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 913 0.0 0.0 0.0
2013 8660 0.0 0.0 0.0
2014 8551 0.0 0.0 0.0
2015 8409 0.0 0.0 0.0
2016 8146 0.0 0.0 0.0
2017 8426 0.0 0.0 0.0
2018 7719 0.0 0.0 0.0
2019 6222 0.0 0.0 0.0
2020 2060 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-19 No Incident Encountered 0.00 0.00

For data sources see[7]

References