X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776101611000

Well Details

Well ID: 0776101611000
Loading map...
Location: 00/11-16-077-10W6/0
Location Alias: 00/11-16-77-10 W6M
Location Alias 2: 00/11-16-077-10 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 10
Section: 16
County/Municipality: Saddle Hills County
Well Name: B.A. BRAEBURN IN 11-16-77-10
Operator Name: Gulf Canada Limited
License Number: 0022138
License Date: 1962-02-20
License Status: RecExempt
Spud Date: 1962-06-19
Final Drill Date: 1962-08-19
Well Total Depth: 2270.20 m
Surface Hole Latitude: 55.674140
Surface Hole Longitude: -119.490236

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-02-20 Obtained License
1962-07-03 Drill Stem Test Performed
1962-07-12 Drill Stem Test Performed
1962-08-19 Finished Drilling
1962-08-20 Drill Stem Test Performed
1962-08-22 Drill Stem Test Performed
1962-08-25 Drill Stem Test Performed
1962-08-25 Production Casing Operation Performed
1962-08-28 Perforation Treatment Performed - Selective Bullet Perforations
1962-08-29 Perforation Treatment Performed - Fractured
1962-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-08-31 Perforation Treatment Performed - Jet Perforation
1962-09-01 Perforation Treatment Performed - Fractured
1962-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1962-09-03 Perforation Treatment Performed - Selective Bullet Perforations
1962-09-04 Perforation Treatment Performed - Acid Wash - No Pressure
1962-09-04 Perforation Treatment Performed - Fractured
1962-09-06 Perforation Treatment Performed - Jet Perforation
1962-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-09-07 Perforation Treatment Performed - Bullet Perforation
1962-09-07 Perforation Treatment Performed - Fractured
1962-09-13 Perforation Treatment Performed - Cement Squeeze
1962-09-14 Perforation Treatment Performed - Bullet Perforation
1962-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-09-16 Perforation Treatment Performed - Bullet Perforation
1962-09-16 Perforation Treatment Performed - Cement Squeeze
1962-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1962-09-19 Well Mode changed to Drilled and Cased
1965-02-26 Well Began Production
1965-02-26 Well Fluid changed to Gas
1965-02-26 Well Mode changed to Flowing
1965-03-13 Perforation Treatment Performed - Cement Squeeze
1965-03-16 Perforation Treatment Performed - Jet Perforation
1965-03-17 Perforation Treatment Performed - Jet Perforation
1965-03-19 Perforation Treatment Performed - Jet Perforation
1965-07-21 Perforation Treatment Performed - Cement Squeeze
1965-07-23 Perforation Treatment Performed - Jet Perforation
1966-05-17 Perforation Treatment Performed - Jet Perforation
1966-06-04 Perforation Treatment Performed - Jet Perforation
1966-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-19 Well Began Injection
1966-06-19 Well Fluid changed to Water
1966-06-19 Well Type changed to Disposal
1968-02-29 Well Fluid changed to Water
1968-02-29 Well Mode changed to Suspended
1968-02-29 Well Type changed to Disposal
1969-11-21 Perforation Treatment Performed - Cement Plug
1969-11-21 Well Abandoned
1969-11-21 Well Fluid changed to Water
1969-11-21 Well Mode changed to Abandoned
1969-11-21 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-08-28 Selective Bullet Perforations 2237.20 2237.20 0
1962-09-06 Perforation 1580.40 1582.50 13
1962-09-07 Bullet Perforation 1580.10 1587.40 13
1962-09-07 Acid Treatment 1580.10 1587.40 0
1962-09-07 Fracture 1580.10 1587.40 0
1962-09-13 Cement Squeeze 1580.10 1587.40 0
1962-09-14 Bullet Perforation 1910.50 1911.70 13
1962-09-15 Acid Treatment 1910.50 1911.70 0
1962-09-16 Cement Squeeze 1910.50 1911.70 0
1962-09-16 Bullet Perforation 1059.50 1060.10 13
1962-09-17 Acid Treatment 1059.50 1060.10 0
1962-08-29 Fracture 2237.20 2237.20 0
1962-09-18 Packing Device Capped w/Cement 1098.80 1098.80 0
1965-03-13 Cement Squeeze 1059.50 1060.10 0
1965-03-16 Perforation 1058.00 1058.60 10
1965-03-17 Perforation 1058.00 1059.20 10
1965-03-19 Perforation 1043.30 1044.20 13
1965-07-21 Cement Squeeze 1043.30 1044.20 0
1965-07-23 Perforation 1043.30 1044.20 13
1966-05-17 Perforation 1073.20 1079.30 10
1966-05-17 Perforation 1080.50 1082.30 10
1966-06-04 Perforation 1044.50 1045.50 10
1962-08-31 Perforation 2236.60 2238.10 13
1966-06-04 Perforation 1059.50 1062.20 10
1966-06-16 Acid Treatment 1043.30 1082.30 0
1969-11-21 Cement Plug 1036.90 1036.90 0
1962-08-31 Acid Treatment 2236.60 2238.10 0
1962-09-01 Fracture 2236.60 2238.10 0
1962-09-03 Packing Device Capped w/Cement 2228.10 2228.10 0
1962-09-03 Selective Bullet Perforations 1586.20 1586.20 0
1962-09-04 Acid Wash 1586.20 1586.20 0
1962-09-04 Fracture 1586.20 1586.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0

For data sources see[5]

References