If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776101611000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.67414,"lon":-119.490236,"icon":""}]} |
Location: 00/11-16-077-10W6/0 | |
Location Alias: 00/11-16-77-10 W6M | |
Location Alias 2: 00/11-16-077-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 10 | |
Section: 16 | |
County/Municipality: Saddle Hills County | |
Well Name: B.A. BRAEBURN IN 11-16-77-10 | |
Operator Name: Gulf Canada Limited | |
License Number: 0022138 | |
License Date: 1962-02-20 | |
License Status: RecExempt | |
Spud Date: 1962-06-19 | |
Final Drill Date: 1962-08-19 | |
Well Total Depth: 2270.20 m | |
Surface Hole Latitude: 55.674140 | |
Surface Hole Longitude: -119.490236 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1962-02-20 | Obtained License |
1962-07-03 | Drill Stem Test Performed |
1962-07-12 | Drill Stem Test Performed |
1962-08-19 | Finished Drilling |
1962-08-20 | Drill Stem Test Performed |
1962-08-22 | Drill Stem Test Performed |
1962-08-25 | Drill Stem Test Performed |
1962-08-25 | Production Casing Operation Performed |
1962-08-28 | Perforation Treatment Performed - Selective Bullet Perforations |
1962-08-29 | Perforation Treatment Performed - Fractured |
1962-08-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-08-31 | Perforation Treatment Performed - Jet Perforation |
1962-09-01 | Perforation Treatment Performed - Fractured |
1962-09-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1962-09-03 | Perforation Treatment Performed - Selective Bullet Perforations |
1962-09-04 | Perforation Treatment Performed - Acid Wash - No Pressure |
1962-09-04 | Perforation Treatment Performed - Fractured |
1962-09-06 | Perforation Treatment Performed - Jet Perforation |
1962-09-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-09-07 | Perforation Treatment Performed - Bullet Perforation |
1962-09-07 | Perforation Treatment Performed - Fractured |
1962-09-13 | Perforation Treatment Performed - Cement Squeeze |
1962-09-14 | Perforation Treatment Performed - Bullet Perforation |
1962-09-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-09-16 | Perforation Treatment Performed - Bullet Perforation |
1962-09-16 | Perforation Treatment Performed - Cement Squeeze |
1962-09-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-09-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1962-09-19 | Well Mode changed to Drilled and Cased |
1965-02-26 | Well Began Production |
1965-02-26 | Well Fluid changed to Gas |
1965-02-26 | Well Mode changed to Flowing |
1965-03-13 | Perforation Treatment Performed - Cement Squeeze |
1965-03-16 | Perforation Treatment Performed - Jet Perforation |
1965-03-17 | Perforation Treatment Performed - Jet Perforation |
1965-03-19 | Perforation Treatment Performed - Jet Perforation |
1965-07-21 | Perforation Treatment Performed - Cement Squeeze |
1965-07-23 | Perforation Treatment Performed - Jet Perforation |
1966-05-17 | Perforation Treatment Performed - Jet Perforation |
1966-06-04 | Perforation Treatment Performed - Jet Perforation |
1966-06-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-06-19 | Well Began Injection |
1966-06-19 | Well Fluid changed to Water |
1966-06-19 | Well Type changed to Disposal |
1968-02-29 | Well Fluid changed to Water |
1968-02-29 | Well Mode changed to Suspended |
1968-02-29 | Well Type changed to Disposal |
1969-11-21 | Perforation Treatment Performed - Cement Plug |
1969-11-21 | Well Abandoned |
1969-11-21 | Well Fluid changed to Water |
1969-11-21 | Well Mode changed to Abandoned |
1969-11-21 | Well Type changed to Disposal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1962-08-28 | Selective Bullet Perforations | 2237.20 | 2237.20 | 0 |
1962-09-06 | Perforation | 1580.40 | 1582.50 | 13 |
1962-09-07 | Bullet Perforation | 1580.10 | 1587.40 | 13 |
1962-09-07 | Acid Treatment | 1580.10 | 1587.40 | 0 |
1962-09-07 | Fracture | 1580.10 | 1587.40 | 0 |
1962-09-13 | Cement Squeeze | 1580.10 | 1587.40 | 0 |
1962-09-14 | Bullet Perforation | 1910.50 | 1911.70 | 13 |
1962-09-15 | Acid Treatment | 1910.50 | 1911.70 | 0 |
1962-09-16 | Cement Squeeze | 1910.50 | 1911.70 | 0 |
1962-09-16 | Bullet Perforation | 1059.50 | 1060.10 | 13 |
1962-09-17 | Acid Treatment | 1059.50 | 1060.10 | 0 |
1962-08-29 | Fracture | 2237.20 | 2237.20 | 0 |
1962-09-18 | Packing Device Capped w/Cement | 1098.80 | 1098.80 | 0 |
1965-03-13 | Cement Squeeze | 1059.50 | 1060.10 | 0 |
1965-03-16 | Perforation | 1058.00 | 1058.60 | 10 |
1965-03-17 | Perforation | 1058.00 | 1059.20 | 10 |
1965-03-19 | Perforation | 1043.30 | 1044.20 | 13 |
1965-07-21 | Cement Squeeze | 1043.30 | 1044.20 | 0 |
1965-07-23 | Perforation | 1043.30 | 1044.20 | 13 |
1966-05-17 | Perforation | 1073.20 | 1079.30 | 10 |
1966-05-17 | Perforation | 1080.50 | 1082.30 | 10 |
1966-06-04 | Perforation | 1044.50 | 1045.50 | 10 |
1962-08-31 | Perforation | 2236.60 | 2238.10 | 13 |
1966-06-04 | Perforation | 1059.50 | 1062.20 | 10 |
1966-06-16 | Acid Treatment | 1043.30 | 1082.30 | 0 |
1969-11-21 | Cement Plug | 1036.90 | 1036.90 | 0 |
1962-08-31 | Acid Treatment | 2236.60 | 2238.10 | 0 |
1962-09-01 | Fracture | 2236.60 | 2238.10 | 0 |
1962-09-03 | Packing Device Capped w/Cement | 2228.10 | 2228.10 | 0 |
1962-09-03 | Selective Bullet Perforations | 1586.20 | 1586.20 | 0 |
1962-09-04 | Acid Wash | 1586.20 | 1586.20 | 0 |
1962-09-04 | Fracture | 1586.20 | 1586.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]