X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776101214030

Well Details

Well ID: 0776101214030
Loading map...
Location: 03/14-12-077-10W6/0
Location Alias: 03/14-12-77-10 W6M
Location Alias 2: 03/14-12-077-10 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 10
Section: 12
County/Municipality: Saddle Hills County
Well Name: LONGSHORE 03 HZ PROGRESS 14-12-77-10
Operator Name: Longshore Resources Ltd.
License Number: 0493487
License Date: 2019-01-18
License Status: Amended
Spud Date: 2019-01-28
Final Drill Date: 2019-02-07
Well Total Depth: 3498.00 m
Surface Hole Latitude: 55.662228
Surface Hole Longitude: -119.437538

For data sources see[1][2]

Well History

Date Event
2019-01-18 Obtained License
2019-01-29 Surface Casing Operation Performed
2019-01-31 Direction Drilling Operation Performed - Deviate
2019-02-02 Direction Drilling Operation Performed - Horizontal
2019-02-02 Well Log Performed
2019-02-03 Intermediate Casing Operation Performed
2019-02-07 Finished Drilling
2019-02-07 Well Log Performed
2019-02-07 Well Mode changed to Drilled and Cased
2019-02-08 Liner Casing Operation Performed
2019-02-08 Well Log Performed
2019-02-09 Rig Released
2019-03-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-04-03 Well Began Production
2019-04-03 Well Fluid changed to Crude Oil
2019-04-03 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-28 Nabors Drilling Canada Limited 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-31 1507.20 Deviate (5 - 79 degrees)
2019-02-02 1928.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-04 Multi-Stage Fracture 3456.80 3460.40 0
2019-03-04 Multi-Stage Fracture 3108.20 3108.30 0
2019-03-04 Multi-Stage Fracture 3069.50 3069.60 0
2019-03-04 Multi-Stage Fracture 3031.00 3031.10 0
2019-03-04 Multi-Stage Fracture 2992.20 2992.30 0
2019-03-04 Multi-Stage Fracture 2953.60 2953.70 0
2019-03-04 Multi-Stage Fracture 2915.30 2915.40 0
2019-03-14 Multi-Stage Fracture 2876.70 2876.80 0
2019-03-14 Multi-Stage Fracture 2839.00 2839.10 0
2019-03-14 Multi-Stage Fracture 2800.30 2800.40 0
2019-03-14 Multi-Stage Fracture 2761.60 2761.70 0
2019-03-04 Multi-Stage Fracture 3418.00 3418.10 0
2019-03-14 Multi-Stage Fracture 2722.90 2723.00 0
2019-03-14 Multi-Stage Fracture 2684.40 2684.50 0
2019-03-14 Multi-Stage Fracture 2645.70 2645.80 0
2019-03-14 Multi-Stage Fracture 2607.00 2607.10 0
2019-03-14 Multi-Stage Fracture 2568.30 2568.40 0
2019-03-14 Multi-Stage Fracture 2529.50 2529.60 0
2019-03-14 Multi-Stage Fracture 2491.10 2491.20 0
2019-03-14 Multi-Stage Fracture 2452.40 2452.50 0
2019-03-14 Multi-Stage Fracture 2414.30 2414.40 0
2019-03-14 Multi-Stage Fracture 2375.50 2375.60 0
2019-03-04 Multi-Stage Fracture 3379.20 3379.30 0
2019-03-14 Multi-Stage Fracture 2336.80 2336.90 0
2019-03-14 Multi-Stage Fracture 2298.00 2298.10 0
2019-03-15 Multi-Stage Fracture 2259.70 2259.80 0
2019-03-15 Multi-Stage Fracture 2221.00 2221.10 0
2019-03-15 Multi-Stage Fracture 2182.20 2182.30 0
2019-03-15 Multi-Stage Fracture 2143.50 2143.60 0
2019-03-15 Multi-Stage Fracture 2104.90 2105.00 0
2019-03-15 Multi-Stage Fracture 2066.20 2066.30 0
2019-03-15 Multi-Stage Fracture 2015.00 2015.10 0
2019-03-04 Multi-Stage Fracture 3340.50 3340.60 0
2019-03-04 Multi-Stage Fracture 3301.70 3301.80 0
2019-03-04 Multi-Stage Fracture 3262.90 3263.00 0
2019-03-04 Multi-Stage Fracture 3224.40 3224.50 0
2019-03-04 Multi-Stage Fracture 3185.60 3185.70 0
2019-03-04 Multi-Stage Fracture 3147.00 3147.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-04 2019-03-04 1,833 1,824 N/A
2 2019-03-04 2019-03-15 1,833 3,602 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 1.4295 N/A
potassium chloride 7447-40-7 100 92.255 N/A
water Not Available 100 51.3866 N/A
CRC-C 30/50 Trican phenolic resin 9003-35-4 100 1.3043 N/A
silica crystalline 14808-60-7 100 1.3043 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 5.8696 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.3304 N/A
AcResin Activator W Trican Activator alcohols. C12-14-secondary. ethoxylated 84133-50-6 100 0.0376 N/A
methanol 67-56-1 100 0.0376 N/A
polyethylene glycol 25322-68-3 100 0.0376 N/A
Third Party Product 2 (L) Engineered Chemistry Energizing Fluid undisclosed Trade Secret 100 0.0194 N/A
Third Party Product 3 (L) Engineered Chemistry Energizing Fluid undisclosed Trade Secret 100 0.0448 N/A
FR-24 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.088 N/A
non-hazardous ingredients Not Available 100 0.088 N/A
2 Water 7732-18-5 100 90.4845 N/A
Atlas CRC-C. 30/50 BJ Services Crystalline silica. quartz 14808-60-7 100 1.3792 N/A
Hexamethylenetetramine 100-97-0 100 1.3792 N/A
Phenol-Formaldehyde Resin 9003-35-4 100 1.3792 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) BJ Services Crystalline Silica (Quartz) 14808-60-7 100 5.2202 N/A
FRAC SAND. 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 1.2149 N/A
Hydrochloric Acid 15% BJ Services Acid Hydrochloric acid 7647-01-0 100 1.2999 N/A
Water 7732-18-5 100 1.2999 N/A
AcTivator BJ Services Activator Alcohols. C12-14-secondary. ethoxylated 84133-50-6 100 0.0384 N/A
Methanol 67-56-1 100 0.0384 N/A
Polyethylene glycol 25322-68-3 100 0.0384 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0138 N/A
AI-11 Trican Corrosion Inhibitor non-hazardous ingredients Not Available 100 0.005 N/A
potassium iodide 7681-11-0 100 0.005 N/A
propargyl alcohol 107-19-7 100 0.005 N/A
propargyl alcohol derivative 9393 100 0.005 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0001 N/A
propylene glycol 57-55-6 100 0.0001 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.1213 N/A
Isopropanol 67-63-0 100 0.1213 N/A
Methanol 67-56-1 100 0.1213 N/A
Third Party Product (L) Engineered Chemistry Energizing Fluid undisclosed Trade Secret 100 0.0955 N/A
ThinFrac HV FRHV-01 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.167 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.167 N/A
Lecitihins. soya 8030-76-0 100 0.167 N/A
polymer Trade Secret 100 0.167 N/A
Water 7732-18-5 100 0.167 N/A
IC-8 Trican Iron Control 2-mercaptoethanol 60-24-2 100 0.0171 N/A
cupric chloride 7447-39-4 100 0.0171 N/A
monoethanolamine 141-43-5 100 0.0171 N/A
SI-10 Scale Inhibitor Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0015 N/A
ASA-60W Trican Surfactant alkylbenzenesulfonic acid 68584-22-5 100 0.0277 N/A
dipropylene glycol 25265-71-8 100 0.0277 N/A
sodium hexyldiphenyl ether sulfonate 147732-60-3 100 0.0277 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-03-03 2019-03-14 Surface Water - Runoff 4975
2019-03-15 2019-03-15 Municipal Water 1400

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5336 0.0 0.0 0.0
2020 1315 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-09 No Incident Encountered 0.00 0.00
2019-03-15 No Incident Encountered 0.00 0.00

For data sources see[10]

References