If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776101013000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.654396,"lon":-119.453095,"icon":""}]} |
Location: 00/13-10-077-10W6/0 | |
Location Alias: 00/13-10-77-10 W6M | |
Location Alias 2: 00/13-10-077-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 10 | |
Section: 10 | |
County/Municipality: Saddle Hills County | |
Well Name: PWEI ET AL HZ PCOUPES 13-10-77-10 | |
Operator Name: TAQA North Ltd. | |
License Number: 0398315 | |
License Date: 2008-07-08 | |
License Status: Issued | |
Spud Date: 2008-08-18 | |
Final Drill Date: 2008-09-07 | |
Well Total Depth: 3125.00 m | |
Surface Hole Latitude: 55.654396 | |
Surface Hole Longitude: -119.453095 |
Date | Event |
---|---|
2008-07-08 | Obtained License |
2008-08-18 | Surface Casing Operation Performed |
2008-08-23 | Direction Drilling Operation Performed - Horizontal |
2008-08-29 | Intermediate Casing Operation Performed |
2008-08-30 | Well Log Performed |
2008-09-07 | Finished Drilling |
2008-09-07 | Well Log Performed |
2008-09-07 | Well Mode changed to Drilled and Cased |
2008-09-10 | Rig Released |
2008-10-09 | Liner Casing Operation Performed |
2008-10-17 | Well Fluid changed to Gas |
2008-10-17 | Well Mode changed to Testing |
2008-12-21 | Well Began Production |
2008-12-21 | Well Fluid changed to Gas |
2008-12-21 | Well Mode changed to Flowing |
2011-10-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-09-01 | Well Fluid changed to Gas |
2019-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-08-23 | 1652.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-26 | Multi-Stage Fracture | 2206.09 | 2206.10 | 0 |
2011-10-26 | Multi-Stage Fracture | 2344.98 | 2344.99 | 0 |
2011-10-26 | Multi-Stage Fracture | 2482.33 | 2482.34 | 0 |
2011-10-26 | Multi-Stage Fracture | 2621.92 | 2621.93 | 0 |
2011-10-26 | Multi-Stage Fracture | 2755.20 | 2755.21 | 0 |
2011-10-26 | Multi-Stage Fracture | 2900.88 | 2900.89 | 0 |
2011-10-26 | Multi-Stage Fracture | 3037.52 | 3037.53 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 252 | 0.0 | 0.0 | 0.0 |
2009 | 8318 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 7935 | 0.0 | 0.0 | 0.0 |
2013 | 6542 | 0.0 | 0.0 | 0.0 |
2014 | 7303 | 0.0 | 0.0 | 0.0 |
2015 | 4109 | 0.0 | 0.0 | 0.0 |
2016 | 780 | 0.0 | 0.0 | 0.0 |
2017 | 116 | 0.0 | 0.0 | 0.0 |
2018 | 324 | 0.0 | 0.0 | 0.0 |
For data sources see[6]