If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776100306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.64021,"lon":-119.46364,"icon":""}]} |
Location: 00/06-03-077-10W6/0 | |
Location Alias: 00/06-03-77-10 W6M | |
Location Alias 2: 00/06-03-077-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 10 | |
Section: 03 | |
County/Municipality: Saddle Hills County | |
Well Name: ANDERSON PCOUPES 6-3-77-10 | |
Operator Name: Devon Canada Corporation | |
License Number: 0160776 | |
License Date: 1993-09-02 | |
License Status: RecCertified | |
Spud Date: 1993-09-09 | |
Final Drill Date: 1993-09-16 | |
Well Total Depth: 1695.00 m | |
Surface Hole Latitude: 55.640210 | |
Surface Hole Longitude: -119.463640 |
Date | Event |
---|---|
1993-09-02 | Obtained License |
1993-09-09 | Well Log Performed |
1993-09-10 | Surface Casing Operation Performed |
1993-09-16 | Finished Drilling |
1993-09-16 | Well Log Performed |
1993-09-16 | Well Mode changed to Drilled and Cased |
1993-09-17 | Drill Stem Test Performed |
1993-09-18 | Drill Stem Test Performed |
1993-09-19 | Drill Stem Test Performed |
1993-09-20 | Drill Stem Test Performed |
1993-09-21 | Production Casing Operation Performed |
1993-09-22 | Rig Released |
1993-10-30 | Well Log Performed |
1993-11-01 | Perforation Treatment Performed - Jet Perforation |
1993-11-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-11-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-11-06 | Plug Back Performed |
1993-11-06 | Well Log Performed |
1993-11-07 | Perforation Treatment Performed - Jet Perforation |
1993-11-08 | Perforation Treatment Performed - Jet Perforation |
1993-11-09 | Well Log Performed |
1993-11-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-11-10 | Perforation Treatment Performed - Jet Perforation |
1993-11-10 | Plug Back Performed |
1993-11-11 | Well Log Performed |
1993-11-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-11-12 | Perforation Treatment Performed - Jet Perforation |
1993-11-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-11-13 | Perforation Treatment Performed - Jet Perforation |
1993-11-13 | Plug Back Performed |
1993-11-13 | Well Log Performed |
1993-11-14 | Perforation Treatment Performed - Jet Perforation |
1993-11-16 | Well Log Performed |
1993-11-17 | Perforation Treatment Performed - Jet Perforation |
1994-09-21 | Well Began Production |
1994-09-21 | Well Fluid changed to Gas |
1994-09-21 | Well Mode changed to Flowing |
1999-06-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-06-18 | Plug Back Performed |
1999-06-18 | Well Fluid changed to Gas |
1999-06-18 | Well Mode changed to Abandoned Zone |
1999-06-19 | Well Log Performed |
1999-06-21 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-11-01 | Perforation | 1647.00 | 1649.00 | 14 |
1993-11-12 | Packing Device Capped w/Cement | 1552.00 | 1560.00 | 0 |
1993-11-12 | Perforation | 1136.00 | 1139.00 | 14 |
1993-11-13 | Perforation | 1136.00 | 1139.00 | 14 |
1993-11-13 | Packing Device Capped w/Cement | 1122.00 | 1130.00 | 0 |
1993-11-14 | Perforation | 1076.00 | 1078.00 | 14 |
1993-11-17 | Perforation | 1059.50 | 1062.50 | 14 |
1999-06-18 | Packing Device Capped w/Cement | 1066.00 | 1074.00 | 0 |
1999-06-18 | Packing Device Capped w/Cement | 1046.00 | 1054.00 | 0 |
1993-11-01 | Perforation | 1653.00 | 1658.00 | 14 |
1993-11-03 | Acid Treatment | 1647.00 | 1658.00 | 0 |
1993-11-06 | Packing Device Capped w/Cement | 1637.00 | 1645.00 | 0 |
1993-11-07 | Perforation | 1620.50 | 1622.00 | 14 |
1993-11-08 | Perforation | 1608.00 | 1612.00 | 14 |
1993-11-10 | Packing Device Capped w/Cement | 1616.00 | 1619.00 | 0 |
1993-11-10 | Packing Device Capped w/Cement | 1598.00 | 1606.00 | 0 |
1993-11-10 | Perforation | 1566.00 | 1568.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 399 | 0.0 | 0.0 | 0.0 |
1995 | 719 | 0.0 | 0.0 | 0.0 |
1998 | 1008 | 0.0 | 0.0 | 0.0 |
1999 | 32 | 0.0 | 0.0 | 0.0 |
For data sources see[5]