X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776093113000

Well Details

Well ID: 0776093113000
Loading map...
Location: 00/13-31-077-09W6/0
Location Alias: 00/13-31-77-09 W6M
Location Alias 2: 00/13-31-077-09 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 09
Section: 31
County/Municipality: Saddle Hills County
Well Name: AVN HZ PROGRESS 13-31-77-9
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0484535
License Date: 2017-07-17
License Status: Issued
Spud Date: 2017-08-08
Final Drill Date: 2017-08-18
Well Total Depth: 4591.00 m
Surface Hole Latitude: 55.720499
Surface Hole Longitude: -119.354349

For data sources see[1][2]

Well History

Date Event
2017-07-17 Obtained License
2017-08-09 Surface Casing Operation Performed
2017-08-11 Direction Drilling Operation Performed - Deviate
2017-08-13 Direction Drilling Operation Performed - Horizontal
2017-08-14 Well Log Performed
2017-08-18 Finished Drilling
2017-08-18 Well Log Performed
2017-08-18 Well Mode changed to Drilled and Cased
2017-08-20 Production Casing Operation Performed
2017-08-21 Rig Released
2017-11-03 Perforation Treatment Performed - Open-Hole Completion
2017-11-05 Well Log Performed
2017-11-17 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-12-17 Well Began Production
2019-12-17 Well Fluid changed to Gas
2019-12-17 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-08-08 Horizon Drilling Inc. 30 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-08-11 1876.00 Deviate (5 - 79 degrees)
2017-08-13 2173.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-11-03 Open Hole/Barefoot Completion 4581.00 4591.00 0
2017-11-18 Multi-Stage Fracture 4142.80 4142.90 0
2017-11-18 Multi-Stage Fracture 4090.10 4090.20 0
2017-11-18 Multi-Stage Fracture 4037.50 4037.60 0
2017-11-19 Multi-Stage Fracture 3984.90 3985.00 0
2017-11-19 Multi-Stage Fracture 3932.30 3932.40 0
2017-11-19 Multi-Stage Fracture 3879.70 3879.80 0
2017-11-19 Multi-Stage Fracture 3827.00 3827.10 0
2017-11-19 Multi-Stage Fracture 3774.40 3774.50 0
2017-11-19 Multi-Stage Fracture 3721.80 3721.90 0
2017-11-19 Multi-Stage Fracture 3669.20 3669.30 0
2017-11-17 Multi-Stage Fracture 4569.60 4569.70 0
2017-11-19 Multi-Stage Fracture 3616.50 3616.60 0
2017-11-19 Multi-Stage Fracture 3563.90 3564.00 0
2017-11-20 Multi-Stage Fracture 3511.30 3511.40 0
2017-11-20 Multi-Stage Fracture 3458.60 3458.70 0
2017-11-20 Multi-Stage Fracture 3405.90 3406.00 0
2017-11-20 Multi-Stage Fracture 3353.30 3353.40 0
2017-11-20 Multi-Stage Fracture 3300.60 3300.70 0
2017-11-20 Multi-Stage Fracture 3247.90 3248.00 0
2017-11-20 Multi-Stage Fracture 3195.90 3196.00 0
2017-11-20 Multi-Stage Fracture 3143.80 3143.90 0
2017-11-17 Multi-Stage Fracture 4510.00 4510.10 0
2017-11-21 Multi-Stage Fracture 3091.30 3091.40 0
2017-11-21 Multi-Stage Fracture 3038.60 3038.70 0
2017-11-21 Multi-Stage Fracture 2985.90 2986.00 0
2017-11-21 Multi-Stage Fracture 2933.20 2933.30 0
2017-11-21 Multi-Stage Fracture 2880.50 2880.60 0
2017-11-21 Multi-Stage Fracture 2827.90 2828.00 0
2017-11-21 Multi-Stage Fracture 2775.20 2775.30 0
2017-11-21 Multi-Stage Fracture 2722.60 2722.70 0
2017-11-21 Multi-Stage Fracture 2671.00 2671.10 0
2017-11-21 Multi-Stage Fracture 2618.50 2618.60 0
2017-11-17 Multi-Stage Fracture 4457.50 4457.60 0
2017-11-21 Multi-Stage Fracture 2566.40 2566.50 0
2017-11-22 Multi-Stage Fracture 2514.30 2514.40 0
2017-11-22 Multi-Stage Fracture 2461.60 2461.70 0
2017-11-22 Multi-Stage Fracture 2409.00 2409.10 0
2017-11-22 Multi-Stage Fracture 2356.40 2356.50 0
2017-11-22 Multi-Stage Fracture 2303.80 2303.90 0
2017-11-18 Multi-Stage Fracture 4404.80 4404.90 0
2017-11-18 Multi-Stage Fracture 4352.60 4352.70 0
2017-11-18 Multi-Stage Fracture 4300.00 4300.10 0
2017-11-18 Multi-Stage Fracture 4247.30 4247.40 0
2017-11-18 Multi-Stage Fracture 4195.00 4195.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-11-17 2017-11-22 2,109 11,193 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 76.9692 N/A
Sand - Tier 1 (30/50) Canyon Technical Services Aluminum Oxide 1344-28-1 100 13.3562 N/A
Crystalline silica. quartz 14808-60-7 100 13.3562 N/A
Iron Oxide 1309-37-1 100 13.3562 N/A
Titanium Oxide 13463-67-7 100 13.3562 N/A
Sand - Tier 1 (40/70) Canyon Technical Services Aluminum Oxide 1344-28-1 100 6.4223 N/A
Crystalline silica. quartz 14808-60-7 100 6.4223 N/A
Iron Oxide 1309-37-1 100 6.4223 N/A
Titanium Oxide 13463-67-7 100 6.4223 N/A
AQUCAR DB20 Biocide Trican Well Service Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0102 N/A
2-mercaptoethanol 60-24-2 100 0.0102 N/A
dibromoacetonitrile 3252-43-5 100 0.0102 N/A
non-hazardous ingredients Not Available 100 0.0102 N/A
sodium bromide 7647-15-6 100 0.0102 N/A
EnCap-HP (Breaker Encapsulated Oxidizer) Trican Well Service Breaker ammonium persulfate 7727-54-0 100 0.0029 N/A
cured acrylic resin Not Available 100 0.0029 N/A
silica crystalline 14808-60-7 100 0.0029 N/A
CAN-2102 pH Buffer (HpH) Canyon Technical Services Buffer Methyl Alcohol 67-56-1 100 0.0309 N/A
Sodium Hydroxide 1310-73-2 100 0.0309 N/A
Water 7732-18-5 100 0.0309 N/A
CC-8 Clay Stabilizer Trican Well Service Clay Control choline chloride 67-48-1 100 0.2065 N/A
non-hazardous ingredients Not Available 100 0.2065 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Canyon Technical Services Crosslinker Boric Acid 10043-35-3 100 0.0252 N/A
Monoethanolamine 141-43-5 100 0.0252 N/A
Water 7732-18-5 100 0.0252 N/A
Nitrogen Gas Canyon Technical Services Energizing Fluid Nitrogen 7727-37-9 100 2.7954 N/A
Non-hazardous base ingredient(s) Not Available 100 2.7955 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.0616 N/A
WG-111LA (Rapid Gellant. Buffered) Trican Well Service Gelling Agent fumaric acid 110-17-8 100 0.04 N/A
guar gum 9000-30-0 100 0.04 N/A
solvent naphtha (petroleum). heavy aliphatic 64742-96-7 100 0.04 N/A
nanoFLO 2 Canyon Technical Services Surfactant Refer to MSDS 1097 100 0.0789 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-11-06 2017-11-06 Central Water Distribution Facility 34
2017-11-06 2017-11-06 Central Water Distribution Facility 60
2017-11-11 2017-11-22 Municipal Water 12939
2017-11-28 2017-11-28 Surface Water - Lake 33

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 36 0.0 0.0 0.0
2020 1357 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-15 No Incident Encountered 0.00 0.00
2017-11-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References