If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776091602000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.680334,"lon":-119.324985,"icon":""}]} |
Location: 00/02-16-077-09W6/0 | |
Location Alias: 00/02-16-77-09 W6M | |
Location Alias 2: 00/02-16-077-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 09 | |
Section: 16 | |
County/Municipality: Saddle Hills County | |
Well Name: KELT EXP PROGRESS 2-16-77-9 | |
Operator Name: Kelt Exploration Ltd. | |
License Number: 0458808 | |
License Date: 2013-08-23 | |
License Status: Issued | |
Spud Date: 2013-09-06 | |
Final Drill Date: 2013-09-23 | |
Well Total Depth: 3536.00 m | |
Surface Hole Latitude: 55.680334 | |
Surface Hole Longitude: -119.324985 |
Date | Event |
---|---|
2013-08-23 | Obtained License |
2013-09-07 | Surface Casing Operation Performed |
2013-09-10 | Direction Drilling Operation Performed - Deviate |
2013-09-12 | Direction Drilling Operation Performed - Horizontal |
2013-09-23 | Finished Drilling |
2013-09-23 | Well Log Performed |
2013-09-23 | Well Mode changed to Drilled and Cased |
2013-09-25 | Liner Casing Operation Performed |
2013-09-25 | Production Casing Operation Performed |
2013-09-25 | Rig Released |
2013-09-25 | Well Log Performed |
2013-10-23 | Well Log Performed |
2013-10-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-10-26 | Perforation Treatment Performed - Open-Hole Completion |
2013-10-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-10-29 | Well Log Performed |
2013-11-14 | Well Began Production |
2013-11-14 | Well Fluid changed to Crude Oil |
2013-11-14 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-09-06 | Excalibur Drilling Ltd. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-09-10 | 1526.00 | Deviate (5 - 79 degrees) |
2013-09-12 | 2040.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-10-26 | Open Hole/Barefoot Completion | 3528.50 | 3536.00 | 0 |
2013-10-26 | Multi-Stage Fracture | 2783.10 | 2783.90 | 0 |
2013-10-27 | Multi-Stage Fracture | 2660.50 | 2661.30 | 0 |
2013-10-27 | Multi-Stage Fracture | 2564.80 | 2565.60 | 0 |
2013-10-27 | Multi-Stage Fracture | 2481.60 | 2482.40 | 0 |
2013-10-27 | Multi-Stage Fracture | 2396.30 | 2397.10 | 0 |
2013-10-27 | Multi-Stage Fracture | 2301.80 | 2302.60 | 0 |
2013-10-27 | Multi-Stage Fracture | 2216.70 | 2217.50 | 0 |
2013-10-27 | Multi-Stage Fracture | 2133.70 | 2134.50 | 0 |
2013-10-26 | Multi-Stage Fracture | 3498.80 | 3499.60 | 0 |
2013-10-26 | Multi-Stage Fracture | 3415.70 | 3416.50 | 0 |
2013-10-26 | Multi-Stage Fracture | 3333.10 | 3333.90 | 0 |
2013-10-26 | Multi-Stage Fracture | 3250.90 | 3251.70 | 0 |
2013-10-26 | Multi-Stage Fracture | 3165.00 | 3165.80 | 0 |
2013-10-26 | Multi-Stage Fracture | 3083.20 | 3084.00 | 0 |
2013-10-26 | Multi-Stage Fracture | 2985.60 | 2986.40 | 0 |
2013-10-26 | Multi-Stage Fracture | 2878.90 | 2879.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-10-26 | 2013-10-27 | 1,906 | 2,033 | N/A |
2 | 2013-10-27 | 2013-10-27 | 1,906 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 84.8321 | N/A | |||
Sand (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 10.9867 | N/A | ||
Yukon Black 20/40 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 2.9414 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 2.9414 | N/A | ||||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.065 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.065 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.065 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.065 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.065 | N/A | ||||
WBO-2 | Trican | Breaker | sodium persulfate | 7775-27-1 | 100 | 0.0417 | N/A | |
CC-3 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1817 | N/A | |
formic acid | 64-18-6 | 100 | 0.1817 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.1817 | N/A | ||||
WXZ-2 | Trican | Crosslinker | alkanolamine chelate of zirconium alkoxide | 197980-53-3 | 100 | 0.1354 | N/A | |
methanol | 67-56-1 | 100 | 0.1354 | N/A | ||||
n-propanol | 71-23-8 | 100 | 0.1354 | N/A | ||||
WG-3L | Trican | Gelling Agent | carboxymethyl hydroxypropyl guar | 68130-15-4 | 100 | 0.6743 | N/A | |
mineral oil | Not Available | 100 | 0.6743 | N/A | ||||
S- 2 | Trican | Surfactant | 2-ethylhexanol | 104-76-7 | 100 | 0.1399 | N/A | |
isopropanol | 67-63-0 | 100 | 0.1399 | N/A | ||||
methanol | 67-56-1 | 100 | 0.1399 | N/A | ||||
oxydiethylenebis(alkyldimethyl ammonium chloride) | 68607-28-3 | 100 | 0.1399 | N/A | ||||
solvent naphtha (petroleum). heavy aromatic | 64742-94-5 | 100 | 0.1399 | N/A | ||||
2 | WBE-1:5 | Trican | Breaker | ethylene glycol | 107-21-1 | 100 | 0.0241 | N/A |
non-hazardous ingredients | Not Available | 100 | 0.0241 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-09-30 | 2013-12-31 | Surface Water - Runoff | 1988 |
2013-09-30 | 2013-12-31 | Recycled Fracturing Water (treated at well site) | 10 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 832 | 0.0 | 0.0 | 0.0 |
2014 | 7264 | 0.0 | 0.0 | 0.0 |
2015 | 7848 | 0.0 | 0.0 | 0.0 |
2016 | 7681 | 0.0 | 0.0 | 0.0 |
2017 | 7634 | 0.0 | 0.0 | 0.0 |
2018 | 8218 | 0.0 | 0.0 | 0.0 |
2019 | 7791 | 0.0 | 0.0 | 0.0 |
2020 | 2163 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-09-25 | No Incident Encountered | 0.00 | 0.00 |
2013-10-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]