X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776090916000

Well Details

Well ID: 0776090916000
Loading map...
Location: 00/16-09-077-09W6/0
Location Alias: 00/16-09-77-09 W6M
Location Alias 2: 00/16-09-077-09 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 09
Section: 09
County/Municipality: Saddle Hills County
Well Name: CNRL HZ PROGRESS 16-9-77-9
Operator Name: Canadian Natural Resources Limited
License Number: 0492777
License Date: 2018-12-14
License Status: Issued
Spud Date: 2020-01-10
Final Drill Date: 2020-01-22
Well Total Depth: 4235.00 m
Surface Hole Latitude: 55.655629
Surface Hole Longitude: -119.351261

For data sources see[1][2]

Well History

Date Event
2018-12-14 Obtained License
2020-01-10 Drill To LD
2020-01-10 Surface Casing Operation Performed
2020-01-12 Direction Drilling Operation Performed - Deviate
2020-01-14 Direction Drilling Operation Performed - Horizontal
2020-01-15 Well Log Performed
2020-01-22 Finished Drilling
2020-01-22 Well Log Performed
2020-01-22 Well Mode changed to Drilled and Cased
2020-01-24 Production Casing Operation Performed
2020-01-24 Rig Released
2020-01-31 Perforation Treatment Performed - Multi-Stage Fracture
2020-02-01 Perforation Treatment Performed - Multi-Stage Fracture
2020-02-14 Well Began Production
2020-02-14 Well Fluid changed to Crude Oil
2020-02-14 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-10 Horizon Drilling Inc. 46 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2020-01-12 1602.40 Deviate (5 - 79 degrees)
2020-01-14 2079.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-01-31 Multi-Stage Fracture 4199.10 4200.00 0
2020-02-01 Multi-Stage Fracture 3653.80 3655.10 0
2020-02-01 Multi-Stage Fracture 3591.20 3593.10 0
2020-02-01 Multi-Stage Fracture 3529.60 3531.50 0
2020-02-01 Multi-Stage Fracture 3467.60 3469.60 0
2020-02-01 Multi-Stage Fracture 3405.80 3407.80 0
2020-02-01 Multi-Stage Fracture 3343.90 3345.80 0
2020-02-01 Multi-Stage Fracture 3281.80 3283.70 0
2020-02-01 Multi-Stage Fracture 3219.20 3221.10 0
2020-02-01 Multi-Stage Fracture 3156.50 3158.30 0
2020-02-01 Multi-Stage Fracture 3093.70 3095.60 0
2020-02-01 Multi-Stage Fracture 4138.90 4140.80 0
2020-02-01 Multi-Stage Fracture 3030.80 3032.70 0
2020-02-01 Multi-Stage Fracture 4077.10 4079.00 0
2020-02-01 Multi-Stage Fracture 4015.70 4017.60 0
2020-02-01 Multi-Stage Fracture 3957.10 3959.00 0
2020-02-01 Multi-Stage Fracture 3899.00 3901.00 0
2020-02-01 Multi-Stage Fracture 3838.00 3839.90 0
2020-02-01 Multi-Stage Fracture 3776.40 3778.30 0
2020-02-01 Multi-Stage Fracture 3714.70 3716.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 144 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-24 No Incident Encountered 0.00 0.00
2020-02-15 No Incident Encountered 0.00 0.00

For data sources see[8]

References