If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776090908030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.655639,"lon":-119.350784,"icon":""}]} |
Location: 03/08-09-077-09W6/0 | |
Location Alias: 03/08-09-77-09 W6M | |
Location Alias 2: 03/08-09-077-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 09 | |
Section: 09 | |
County/Municipality: Saddle Hills County | |
Well Name: CNRL HZ PROGRESS 8-9-77-9 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0492775 | |
License Date: 2018-12-14 | |
License Status: Issued | |
Spud Date: 2019-12-04 | |
Final Drill Date: 2019-12-15 | |
Well Total Depth: 3680.00 m | |
Surface Hole Latitude: 55.655639 | |
Surface Hole Longitude: -119.350784 |
Date | Event |
---|---|
2018-12-14 | Obtained License |
2019-12-04 | Drill To LD |
2019-12-05 | Surface Casing Operation Performed |
2019-12-08 | Direction Drilling Operation Performed - Deviate |
2019-12-09 | Direction Drilling Operation Performed - Horizontal |
2019-12-09 | Well Log Performed |
2019-12-15 | Finished Drilling |
2019-12-15 | Well Log Performed |
2019-12-15 | Well Mode changed to Drilled and Cased |
2019-12-17 | Production Casing Operation Performed |
2019-12-17 | Rig Released |
2020-02-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2020-02-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2020-02-08 | Well Began Production |
2020-02-08 | Well Fluid changed to Crude Oil |
2020-02-08 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-12-04 | Horizon Drilling Inc. | 46 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-12-08 | 1605.50 | Deviate (5 - 79 degrees) |
2019-12-09 | 2072.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2020-02-04 | Multi-Stage Fracture | 3641.20 | 3643.10 | 0 |
2020-02-04 | Multi-Stage Fracture | 3084.10 | 3086.00 | 0 |
2020-02-04 | Multi-Stage Fracture | 3022.30 | 3024.30 | 0 |
2020-02-04 | Multi-Stage Fracture | 2960.00 | 2961.90 | 0 |
2020-02-04 | Multi-Stage Fracture | 2898.00 | 2899.90 | 0 |
2020-02-04 | Multi-Stage Fracture | 2836.20 | 2838.10 | 0 |
2020-02-04 | Multi-Stage Fracture | 2774.00 | 2775.90 | 0 |
2020-02-04 | Multi-Stage Fracture | 2713.20 | 2715.10 | 0 |
2020-02-04 | Multi-Stage Fracture | 2651.70 | 2653.70 | 0 |
2020-02-04 | Multi-Stage Fracture | 2590.00 | 2591.90 | 0 |
2020-02-04 | Multi-Stage Fracture | 2528.00 | 2529.90 | 0 |
2020-02-04 | Multi-Stage Fracture | 3579.00 | 3580.90 | 0 |
2020-02-04 | Multi-Stage Fracture | 2465.80 | 2467.70 | 0 |
2020-02-04 | Multi-Stage Fracture | 2404.10 | 2406.00 | 0 |
2020-02-05 | Multi-Stage Fracture | 2341.80 | 2343.70 | 0 |
2020-02-05 | Multi-Stage Fracture | 2279.70 | 2281.60 | 0 |
2020-02-05 | Multi-Stage Fracture | 2217.50 | 2219.40 | 0 |
2020-02-04 | Multi-Stage Fracture | 3517.20 | 3519.20 | 0 |
2020-02-04 | Multi-Stage Fracture | 3455.50 | 3457.40 | 0 |
2020-02-04 | Multi-Stage Fracture | 3393.50 | 3395.40 | 0 |
2020-02-04 | Multi-Stage Fracture | 3331.40 | 3333.30 | 0 |
2020-02-04 | Multi-Stage Fracture | 3269.50 | 3271.40 | 0 |
2020-02-04 | Multi-Stage Fracture | 3208.10 | 3210.00 | 0 |
2020-02-04 | Multi-Stage Fracture | 3146.20 | 3148.20 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2020 | 96 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-12-17 | No Incident Encountered | 0.00 | 0.00 |
2020-02-17 | No Incident Encountered | 0.00 | 0.00 |
2020-02-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]